|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Excavation in all kind of soft/loose/hard/dense soils, moorum & moorum mixed with boulders and mud including dressing, placing the excavated soil neatly in specified dump area or disposing off the same as directed, including cost of site clearance, all materials, machinery, labour and dressing etc. Complete. |
| 3 | Providing and laying M-10 grade Plain Cement Concrete design mix using 40 mm graded aggregate, clean, hard for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing,packing joints of shuttering etc. Complete. |
| 4 | Providing and laying M-15 grade Plain Cement Concrete Design Mix using graded aggregate clean, hard for foundation filling and sub structure including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing ,packing joints of shuttering etc. complete. Using graded aggregates of maximum size. 20 mm |
| 5 | Earthwork for embankment for breached/ damaged portion of dam/ canal, using selected impervious soil from approved borrow area/ spoil bank in 100 to 150 mm layers (before compaction), including cost of materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting to achieve maximum dry density using sheep foot roller/vibratory compactors etc. complete. |
| 6 | Providing, Laying and Jointing non- pressure(NP3) RCC socket & spigot pipes with rubber gasket joint/joint caulked with cement mortar 1:2 including testing of joints. (Conforming to IS ; 458-1988, IS783:1985) etc. complete |
| 7 | add GST 18% |