Nctps – I - Se/Mi Circle - Amc (23-24) - Mpm Dn. – Ac Plant – Carring Out Time Bound Programme For Condenser Water Pump, Chill Water Pump Cooling Tower, Ahu, Break Down Maintenance Of 2Tr Split, Window Ac Units, 11Tr & 16.5Tr Ac Package Units For The Peri, Thiruvallur-Tamil Nadu

Tamil Nadu Transmission Corporation Limited-TANTRANSCO has published Nctps – I - Se/Mi Circle - Amc (23-24) - Mpm Dn. – Ac Plant – Carring Out Time Bound Programme For Condenser Water Pump, Chill Water Pump Cooling Tower, Ahu, Break Down Maintenance Of 2Tr Split, Window Ac Units, 11Tr & 16.5Tr Ac Package Units For The Peri. Submission Date for this Tender is 25-04-2023. Electrical Condenser Tenders in Thiruvallur Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

37225016
Nctps – I - Se/Mi Circle - Amc (23-24) - Mpm Dn. – Ac Plant – Carring Out Time Bound Programme For Condenser Water Pump, Chill Water Pump Cooling Tower, Ahu, Break Down Maintenance Of 2Tr Split, Window Ac Units, 11Tr & 16.5Tr Ac Package Units For The Peri
Open Tender
Indian
Tamil Nadu
Thiruvallur
25-04-2023

Tender Details

Nctps – I - Se / Mi Circle - Amc ( 23-24 ) - Mpm Dn. – Ac Plant – Carring Out Time Bound Programme For Condenser Water Pump, Chill Water Pump Cooling Tower, Ahu, Break Down Maintenance Of 2Tr Split, Window Ac Units, 11Tr & 16.5Tr Ac Package Units For The Period Of 365 Days

Key Value

Document Fees
Refer document
EMD
INR 38800.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:NCTPS – I - SE/MI circle - AMC (23-24) - MPM Dn. – AC plant – Carring out time bound programme for condenser water pump, chill water pump cooling tower, AHU, Break down maintenance of 2TR split, window AC units, 11TR & 16.5TR AC package units for the period of 365 days
Sl. No. Item Description
1Break down maintenance of condenser water pump, chill water pump, cooling tower and AHU Charges for checking the tightness and correcting the alignment of V belts and rectifying the defects in bearings, plumber blocks, pulleys at both drive end & non drive ends of each blowers of AHU. Including consumables andT&P"s.
2Break down maintenance of condenser water pump, chill water pump, cooling tower and AHU Charges for decoupling and dismantling of Condenser / Chill water pump overhauling, checking of pump internals, such as impeller shaft, sleeves, bearings, casing rings gland assembly, stuffing box packing and bushings etc., replacing the worn-out components, assembling, aligning and with motor and taking trail run cost inclusive of pump spares. Including consumables and T&P"s.
3Break down maintenance of condenser water pump, chill water pump, cooling tower and AHU Charges for cleaning of cooling tower collection basin fills, nozzles, against coal powder deposits. By isolating the cooling tower inlet & outlet valves, Draining the dusty water & after cleaning fill with new water to avoid chocking in condenser and to improve AC effect to avoid loss of generation. Including consumables and T&P"s.
4Break down maintenance of condenser water pump, chill water pump, cooling tower and AHU Attending works in Switch yard control room AHU (AHU Size 7) by Dismantling AHU Assembly, Renewal Reconditioning of Chiller coil, AHU shaft, blower, bearings, pulleys, Bolts and Nuts with new one then dismantling old damaged insulation, rectification of canvass cloth providing new insulation, Commissioning and trail run(chiller Coil, shaft, Blower, will be supplied by TANGEDCO). (16TR) Including consumables and T&P"s.
5Break down maintenance of condenser water pump, chill water pump, cooling tower and AHU Attending works in DM plant AHU , (AHU Size 6 A)by Dismantling AHU Assembly, Renewal Reconditioning of Chiller coil, AHU shaft, blower, bearings, pulleys, Bolts and Nuts with new one then dismantling old damaged insulation, rectification of canvass cloth providing new insulation, Commissioning and trail run.(10.5TR) Including consumables and T&P"s.
6Break down maintenance of condenser water pump, chill water pump, cooling tower and AHU Charges for Attending works in ‘0’ Mtr AHU , (AHU Size 3) by Dismantling AHU Assembly, Renewal Reconditioning of Chiller coil, reconditioning renewal of AHU shaft, blower, bearings, pulleys, Bolts and Nuts with new one then dismantling old damaged insulation, rectification of canvass cloth providing new insulation, Commissioning and trail run (Chiller Coil, shaft, Blower, will be supplied by TANGEDCO). 6000m3/hr (6TR) Including consumables and T&P"s.
7Break down maintenance of condenser water pump, chill water pump, cooling tower and AHU Charges for patch welding in the eroded portion for 10 mtr length including consumables and T & P"s.
8Break down maintenance of2TRsplit, window AC Units and 11TR & 16.5 TR AC package units. Charges for vacuumising the AC system, R 22 gas charging, Leak testing, changing of Capillary & strainer if required, including consumables and T&P"s.
9Break down maintenance of2TRsplit, window AC Units and 11TR & 16.5 TR AC package units. Charges towards the Servicing of electrical components, such as capacitor, relay, Air filter, cable, cable plugs, Timer circuit, MCB Assembly, reassembling, testing & trail run and replacement of above spares if necessary, including consumables and T&P"s.(Spares will be supplied by TANGEDCO)
10Break down maintenance of2TRsplit, window AC Units and 11TR & 16.5 TR AC package units. Charges towards the cleaning of Air filter, Evaporator coil, Condenser coil with compressed air, soap, water, nylon brush in AC indoor & outdoor units, including consumables and T&P"s.
11Break down maintenance of2TRsplit, window AC Units and 11TR & 16.5 TR AC package units. Charges for servicing the stabilizer 5Kva rating (2TR/11TR/16.5TR capacity) towards the replacement of electrical components if required such as relay etc., attending the fault of stabilizer, i.e., electrical circuit protections, time delay etc., including consumables and T&P"s.
12Break down maintenance of2TRsplit, window AC Units and 11TR & 16.5 TR AC package units. Removal of blower condenser fan motor by dismantling the old one and fixing it with new one and lubricating the fan bearing and aligning, including consumables and T&P"s.
13Break down maintenance of2TRsplit, window AC Units and 11TR & 16.5 TR AC package units. Charges for Dismantling the erected 1.5 TR/ 2 TR Split unit andto refix the same in required area at NCTPS-I site. Including Consumables and T&P’s.
14Break down maintenance of2TRsplit, window AC Units and 11TR & 16.5 TR AC package units. Cleaning of air filters and cooling coil in the AHU’s located in the 13 various places by dismantling the dry metallic filters in order to improve the cooling effect in the control room, removing the coal & ash dust deposits in the chiller coil thoroughly. Including Consumables and T&P’s.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail