Regarding Running Tender For New Connection On Jhatpat Portalfull Deposit Work Scheme And Sansad Nidhi / Vidhayak Nidhi Depositwork In The Area Of Edsd-Ii, Sardhana Dehatunder Edd-Ii, Meerut, Under Edc-2 Meerut., Meerut-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Regarding Running Tender For New Connection On Jhatpat Portalfull Deposit Work Scheme And Sansad Nidhi / Vidhayak Nidhi Depositwork In The Area Of Edsd-Ii, Sardhana Dehatunder Edd-Ii, Meerut, Under Edc-2 Meerut.. Submission Date for this Tender is 17-04-2023. Bolts Tenders in Meerut Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

37205258
Regarding Running Tender For New Connection On Jhatpat Portalfull Deposit Work Scheme And Sansad Nidhi / Vidhayak Nidhi Depositwork In The Area Of Edsd-Ii, Sardhana Dehatunder Edd-Ii, Meerut, Under Edc-2 Meerut.
Open Tender
Indian
Uttar Pradesh
Meerut
17-04-2023

Tender Details

Regarding Running Tender For New Connection On Jhatpat Portalfull Deposit Work Scheme And Sansad Nidhi / Vidhayak Nidhi Depositwork In The Area Of Edsd-Ii, Sardhana Dehatunder Edd-Ii, Meerut, Under Edc-2 Meerut.- 1 Cartage Of Following Material From Store Center Meerut To Je Store Including Loading & Unloading At Both Ends Maximum Distance Up To 40 Km. :– 2 A ) Pcc Pole 8.5 Mrt Long / St Pole 11 Mtr Long. 3 Cartage Of Line Material From Store Centre To Dump Site & Then Dump Site To Site Of Work On Day To Day Basis, Including Loading & Unloading At Both Ends Maximum Distance Up To 20 Km. ( 15 Qtl. ) 4 Cartage Of 10 Kva To 100 Kva Transformer From Store Centre To Site Of Work Including Loading & Unloading At Both Site 5 Cartage Of Following Material From Je Store To Site Of Work Including Loading & Unloading At Both Ends Maximum Distance Up To 40 Km. :– A ) Pcc Pole 8.5 Mrt Long / St Pole 11 Mtr Long. 6 Dissmentling Of Damaged & Broken P.C.C. / S.T.Pole / R.S. Joist By Digging The Pits & Removel Of Complete H.T. / L.T. Line Accessories . 7 Eartingh Of Each 11 Kv Line Pople & T / F Properly After Drive Of Electrodes If Size 20Mmx250mm And Connection The Earthing Point With Gl Wire. 8 Erection Ofpcc Pole 8.5 Mtr Long / Stp Pole 11 Mrt Long After Digging A Pit Of Size 1.20 X 0.60 X 1.6 Mtr In All Type Of Soil Including Back Filling Of The Pole With Proper Ramming After Completion Of Work. 9 Fabrication And Fixing Of All 11 Kv H.T / L.T. Line Accessories. 10 Erection Of Double Pole On Pcc Pole 8.5 Mtr After Digging Of Pit Of Required Size Including Fabrication And Fixing Of Top Channel, Droper Channel & Base Channel Alongwith, Fixing All 11 Kv Accessories Tpmo, Fuse Set 11 Kv Pin Insulators And Making Connection Properly. 11 Mounting Of 10 To 100 Kva T / F With Proper Jumping Of Ht Side And Fixing Of Cable On Lt. Side Of T / F Making Connection Properly. 12 Making A Section Pole To Exist Pole After Fabrication & Fixing Of T Channel Fixing Of All 11 Kv Accessories. 13 Erection Of Stay Rod Complete After Digging A Pit Of Size 1.20 X 0.60 X 1.6 Mtr And Grouting The Same In Block Of Size 0.60 X 0.60 X 0.30 Mtr And Nuzzling At The Both Ends And Filling The Pit With Excavated Earth Soil With Proper Ramming. 14 Laying Lifting Stringing Of Proper Sagging Of Acsr Weasel Conductor For 3 Phase, 3 Wire 11 Kv Line Including Binding & Jumpering Properly. 15 Laying Lifting Stringing Of Proper Sagging Of Acsr Rabbit Conductor For 3 Phase, 3 Wire 11 Kv Line Including Binding & Jumpering Properly. 16 Laying Lifting & Sagging Of Lt Line With A.B.C Bunch Conductor Including Proper Binding & Jumpring:-A ) 3 Phase 4 Wire Line. 17 Grouting Of Pcc / St Poles With Dust, Cement & Stone Blast Concreting. 18 Cutting & Chopping Tree Branches Near Side Of Line For Making The Clearance Between Line And Tree ( Near About 100 Branches ) . 19 Fixing Of Lt Distribution Box Along With Providing Clamp Nut & Bolts 20 Providing And Fixing Stay Clamps . 21 Providing And Fixing F Clamp 22 Providing And Fixing Holding Clamp 23 Providing And Fixing Lt Clamps . 24 Providing And Fixing Ltinsulator Clamps . 25 Providing And Fixing Bolt And Nuts .

Key Value

Document Fees
INR 1180 /-
EMD
INR 2000.0 /-
Tender Value
INR 2 Lakhs /-

BOQ Items

Name of Work: REGARDING RUNNING TENDER FORNEW CONNECTION ON JHATPAT PORTALFULL DEPOSIT WORK SCHEME AND SANSAD NIDHI/VIDHAYAK NIDHI DEPOSITWORK IN THE AREA OF EDSD-II, SARDHANA DEHATUNDER EDD-II, MEERUT, UNDER EDC-2 MEERUT.
Sl. No. Item Description
1Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :–
2A) PCC Pole 8.5 mrt long/ST pole 11 mtr long.
3Cartage of line material from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km. (15 Qtl.)
4Cartage of 10 KVA to 100 KVA Transformer from store centre to site of work including loading & unloading at both site
5Cartage of following material from JE Store to site of work including loading & unloading at both ends maximum distance up to 40 Km. :– A) PCC Pole 8.5 mrt long/ST pole 11 mtr long.
6Dissmentling of Damaged & Broken P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories .
7Eartingh of each 11 KV line pople & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire.
8Erection ofPCC pole 8.5 mtr long/STP Pole 11 mrt long after digging a pit of size 1.20 x 0.60 x 1.6 mtr in all type of Soil including back filling of the pole with proper ramming after completion of work.
9Fabrication and fixing of all 11 KV H.T/L.T. line accessories.
10Erection of Double pole on PCC pole 8.5 mtr after digging of pit of required size including fabrication and fixing of Top channel, droper channel & base channel alongwith, fixing all 11 KV accessories TPMO, Fuse set 11 KV pin insulators and making connection properly.
11Mounting of 10 to 100 KVA T/F with proper jumping of HT side and fixing of cable on LT. side of T/F making connection properly.
12Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories.
13Erection of stay rod complete after digging a pit of size 1.20 x 0.60 x 1.6 mtr and grouting the same in block of size 0.60 x 0.60 x 0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming.
14Laying lifting stringing of proper sagging of ACSR weasel conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly.
15Laying lifting stringing of proper sagging of ACSR Rabbit conductor for 3 phase, 3 wire 11 KV line including binding & jumpering properly.
16Laying lifting & sagging of LT line with A.B.C Bunch Conductor including proper binding & jumpring:- a)3 phase 4 wire line.
17Grouting of PCC/ST poles with Dust, Cement & Stone blast concreting.
18Cutting & chopping tree branches near side of line for making the clearance between line and tree (near about 100 branches).
19Fixing of LT distribution box along with providing clamp Nut & Bolts
20Providing and fixing stay clamps .
21Providing and fixing F Clamp
22Providing and fixing Holding Clamp
23Providing and fixing LT clamps .
24Providing and fixing LTInsulator clamps .
25Providing and fixing Bolt and Nuts .
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail