| 1 | PART - AConstruction of 11KV over head lne of 0.03 CKM using 55 sq.mm, AAA Conductor from proposed cut point at T-off to proposed DSS DP at consumer premises (Refer SLD-E-G)160 x 152 mm WPB, (11 mtrs x 30.44 Kg = 334.84 Kg / Mtr.) |
| 2 | Straight Cross Arm 100x50x6mm, 9.56 KG/Mtr., each Channel length, 1.2 mtr., 4 no.s Channel required = (4x9.56x1.2) |
| 3 | Fish Plate 50x6mm, 2.36kg/mtr., each 0.280 mtr. Length, 16 nos required = (16x2.36x0.280) |
| 4 | Straight Cross Arm 100x50x6mm, 9.56 KG/Mtr., each Channel length 0.306 mtr., 4 nos Channel required = 4x9.56x0.306) |
| 5 | Danger Plate |
| 6 | Black Clamp for Danger Plate 25x3 mm flat, 0.59 KG/Mtr., Flat of 0.510 mtr. Length 1 no. = (1x0.59x0.510) |
| 7 | G. I. barbed wire anticlimbing device 3 Kg per support |
| 8 | Black Clamp for anticlimbing device 25x3 mm flat, 0.59 KG/Mtr., Flat of 0.510 mtr. Length 4 nos. = (4x0.59x0.510) |
| 9 | 11 KV Pin Insulator (Polymer) |
| 10 | H. W. Fitting (B&S) 70 KN 3 bolted |
| 11 | Disc. Insulator (B&S), 70 KN (Polymer) |
| 12 | Earthing of support (Coil Type) |
| 13 | No. 8 GI wire (Dia 4.6mm) 0.131 Kg/Mtr-2 mtr. for connecting pole with coil earthing |
| 14 | PG Clamp for 55 sq.mm, AAA Conductor |
| 15 | PG Clamp for 100 sq.mm, AAA Conductor |
| 16 | H. T. Stay Clamp, 50x6 mm Flat 3.14 kg/mtr. 0.551 mtr. Length, 2 nos. required(1 Pair) |
| 17 | H. T. Stay set (Complete) |
| 18 | H. T. Stay Insulator Type-C |
| 19 | 7 / 10 SWG Stay Wire (15Kg per Stay) |
| 20 | GI Nut & Bolt and Washer of different sizes (7.433 kg each cut pole) |
| 21 | 55 sq.mm AAA Conductor |
| 22 | Black paint |
| 23 | Yellow colour paint for background |
| 24 | Fixing of complete 11 KV line, completestay set includes (1) Turn Buckle Assembly (2) Stay Rod & Stay Plate (3) Stay Insulator (4) Stay wire (5) Stay Clamp with nut & bolts. BA will do the excavationincluding excavation, supply of 0.5 cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & standard. |
| 25 | Concrete ratio 1:1.5:3 (500mm x 500mm x 1800mm) = 0.45 cu. Mtr. |
| 26 | Couping ratio 1:1.5:3 with dimension (500mm x 500mm x 450mm) = 0.1125 cu. Mtr. |
| 27 | Installation of 11/0.433 KV, 500 KVA (Cu) DTR . (Refer SLD-H)(To be executed by party & maintained by TPCODL under 6% Deposit work Scheme).WPB 160x152 (11 Mtr. Long, 30.44KG/Mtr.) |
| 28 | Top Channet GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg JMtr, 2 No’s.) (Each 2x3.000x9.56\" |
| 29 | Fish Plate 50x6mm, 2.36kg/mtr., each 0.280 mtr. Length, 6 nos required = (6x2.36x0.280) |
| 30 | Double Pole Bracing Channel 75x40 x4.8 mm, 7.14 Kg/mtr.each Channel length 3.0 mtrs. 2 nos. Channel required (7.14 Kgx3 mtr.x2) |
| 31 | 50x50x6mm GI Bracing Angle @ (4.5 Kg / Mtr.) each Angle 3.512 mtr. Length, 2 nos. Angle required (7.14 Kgx3 mtr.x2) |
| 32 | AB Switch mounting Channel 75 x 40 x 4.8 GI Channel (3000 mm long) (7.14 kg per mtr.), 2 nos. Channel required (Each 2x3000x7.14=42.84 |
| 33 | AB Switch side support Channel 100 x 50 x 6 mm (9.56 kg per mtr.), each channe length 0.35 mtr. 2 nos. Channel required (Each 2x9.56x0.35=6.69 |
| 34 | Channel support for down pipe 70 x 40 x 4.6 mm (7.14 kg per mtr.), each channe length 0.8 mtr. 1 no. Channel required (Each 1x7.14x0.8=5.71 |
| 35 | HG/OD Fuse mounting Channel 75 x 40 x 4.8 GI Channel (3000 mm long) (7.14 kg per mtr.), 2 nos. Channel required (Each 2x3000x7.14=42.84 |
| 36 | Cantilever support Channel 75 x 40 x 4.8 mm GI Channel 810 mm long, (7.14 kg per mtr.), 2 nos. (7.14 kg per mtr.), 2 nos. Channel required (Each 2x810x7.14=11.57 kg |
| 37 | Cantilever support Channel 50 x 50 x 6 mm GI Channel 1282 mm long,(4.5 kg per mtr.), 2 nos. (7.14 kg per mtr.), 2 nos. Channel required (Each 2x1282x4.5=11.538 kg |
| 38 | Black Clamp for Danger Plate 25x3 mm flat, 0.59 KG/Mtr., Flat of 0.510 mtr. Length 2 nos. = (2x0.59x0.510) |
| 39 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formalion, T2 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. 93.00154.82 14,397.89 For DTR Body, 0.500 mm for LTDB & AB Switch operating handle, 3 mtr. for Fencing) ( Each 65.6x2 36= 154.81 Kg) |
| 40 | 500 KVA,11/0.4 KV Transformer with Top Channel BIS Level-II |
| 41 | L.T. Distributionbox with MCCB, aluminum Busbar of single Bay with kit kat fusefor 500 KVA S/S |
| 42 | 55 sq.mm All Alloy aluminum Conductor (AAAC) PVC Insulated (50 Mtrs. Rach Dtr.) |
| 43 | 1 core x 400 sq.mm LT XLPE Cable (Un-armourd) |
| 44 | AB Switch(11 KV , 200 Amp.,3 pole, 50 HZ |
| 45 | HG Fuse(11 KV , 200 Amp.,3 pole, 50 HZ |
| 46 | PG Clamp for 55 sq.mm, AAA Conductor |
| 47 | Disc. Insulator (B&S), 70 KN (Polymer) |
| 48 | H. W. Fitting (B&S) 70 KN 3 bolted |
| 49 | Lighting Arrester (12 KV -10 KV) Station Class-2 |
| 50 | 11 KV Pin Insulator (Polymer) |
| 51 | H. T. Stay set (Complete) |
| 52 | H. T. Stay Clamp (1.9 Kg/1 Pair) |
| 53 | H. T. Stay Insulator Type-C |
| 54 | 7 / 10 SWG Stay Wire, Grade-2 (15Kg per Stay) |
| 55 | 40 mm nominal size G. I. Pipe (medium gauge) Earthing device with 3 mtrs. long |
| 56 | GI Nut & Bolts of Assorted sizes (25 kg/DSS DP) |
| 57 | G. I. barbed wire / anticlimbing device 3 Kg per pole |
| 58 | Black Clamp for anticlimbing device 25x3 mm flat, 0.59 KG/Mtr., Flat of 0.510 mtr. Length 84 nos. = (8x0.59x0.510) |
| 59 | Danger Plate 11 KV |
| 60 | Black Clamp for Danger Plate 25x3 mm flat, 0.59 KG/Mtr., Flat of 0.510 mtr. Length 2 nos. = (2x0.59x0.510) |
| 61 | Name Plate |
| 62 | Yellow colour paint for background |
| 63 | Black colour paint for numbering |
| 64 | Concrete ratio 1:1.5:3 (500mm x 500mm x 1800mm) = 0.45 cu. Mtr. for 2 nos. |
| 65 | Couping ratio 1:1.5:3 with dimension (500mm x 500mm x 450mm) = 0.113 cu. Mtr. for 2 nos. |
| 66 | Fixing of stay set with 0.5 cum cement concrete foundation 1:3:6 size (900mmx600mmx900mm) using 40mm BHG metal with all labour and material except stay set, stay wire, stay insulator |
| 67 | Construction of Earthing Chamber including installation of earthing pipe, making earthing chamber, including excavation, soil treatment with bentonide power, calculation of earth resistance, including installation of 30 mtrs. GI pipe 40mm/50mm including welding of GI Flat around pipe |
| 68 | Plinth for L.T. Distributionbox (LTDB) |
| 69 | Transformer Plinth suitable for 500 KVA TRF as per TPCODL drawing |
| 70 | Supply and erection of GI Fencing with Gate |
| 71 | Construction of1.1 KVL.T.Line of 679 Mtr. (357 mtrs. for Feeder-1 & 322 mtrs. for Feeder-2) using 4 core x 70 sq.mm (P) +1C x 70 sq.mm (M) +1C x 16 sq.mm (Street Light), (Refer SLD-Feeder- 1 & 2) (To be executed by Party maintain by TPCODL under 6% deposit scheme)AB Cable LT line length in KM with 33 Mtrs. SpanDead End 25-70 sq.mm (9/KM)Suspension 25-70 sq.mm (21/KM)9 mtr long 300 Kg PSC Pole |
| 72 | L. T. Stay setcomplete |
| 73 | 7 / 12 SWG G.I. Stay Wire, Grade - 2 |
| 74 | L.T. Stay clamp (1.40 K.g./ Pair) |
| 75 | L.T. Stay Insulator |
| 76 | Pole Clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 77 | EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm) |
| 78 | Dead End Clamp suitable formessenger for XLPE Aerial bunched Cable (25-70 sq.mm) |
| 79 | Suspension Clamp with EYE hook for Aerial bunched Cable(25-70 sq.mm) |
| 80 | 4 core x 70 sq.mm (P) +1C x 70 sq.mm (M) +1C x 16 sq.mm (Street Light) (erial bunched Cable) |
| 81 | 4 way service Distribution Box with kit kat fuse and aluminum busbar |
| 82 | 8 way service Distribution Box with kit kat fuse and aluminum busbar |
| 83 | Insulated Piercing Connector, Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 84 | Pipe Earthing (each 5th pole to earth) |
| 85 | Coil Earthing |
| 86 | No. 8 GI wire (Dia 4.6mm) 0.131 Kg/Mtr-2 mtr. for connecting pole with coil earthing |
| 87 | Danger Plate 11 KV |
| 88 | Black Clamp for Danger Plate 25x3 mm flat, 0.59 KG/Mtr., Flat of 0.510 mtr. Length 34 nos. = (34x0.59x0.510) |
| 89 | G. I. barbed wire anticlimbing device 3 Kg per support |
| 90 | Black Clamp for anticlimbing device 25x3 mm flat, 0.59 KG/Mtr., Flat of 0.510 mtr. Length 102 nos. = (102x0.59x0.510) |
| 91 | GI Nut & Bolt and Washer of different sizes (0.5 kg per pole) |
| 92 | Black paint |
| 93 | Yellow colour paint for background |
| 94 | Fixing of complete 11 KV line, completestay set includes (1) Turn Buckle Assembly (2) Stay Rod & Stay Plate (3) Stay Insulator (4) Stay wire (5) Stay Clamp with nut & bolts. BA will do the excavationincluding excavation, supply of 0.5 cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & standard. |
| 95 | Concrete ratio 1:1.5:3 (500mm x 500mm x 1500mm) = 0.375 cu. Mtr. X 34 nos. Pole |
| 96 | Construction of Earthing Chamber including installation of earthing pipe, making earthing chamber, including excavation, soil treatment with bentonide power, calculation of earth resistance, including installation of 30 mtrs. GI pipe 40mm/50mm including welding of GI Flat around pipe |
| 97 | PART - DConstruction of1.1 KVL.T.Line of 640 Mtr. (302 mtrs. for Feeder-1 & 338 mtrs. for Feeder-2) using 4 core x 50 sq.mm (P) +1C x 50 sq.mm (M) +1C x 16 sq.mm (Street Light), (Refer SLD-Feeder- 3 & 4) (To be executed by Party maintain by TPCODL under 6% deposit scheme)9 mtr long 300 Kg PSC Pole |
| 98 | L. T. Stay setcomplete |
| 99 | 7 / 12 SWG G.I. Stay Wire, Grade - 2 |
| 100 | L.T. Stay clamp (1.40 K.g./ Pair) |
| 101 | L.T. Stay Insulator |
| 102 | LTAccessories with Eye hook and ClampPole Clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 103 | EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm) |
| 104 | Dead End Clamp suitable formessenger for XLPE Aerial bunched Cable (25-70 sq.mm) |
| 105 | Suspension Clamp with EYE hook for Aerial bunched Cable(25-70 sq.mm) |
| 106 | 4 core x 40 sq.mm (P) +1C x 50 sq.mm (M) +1C x 16 sq.mm (Street Light) (Aerial bunched Cable) |
| 107 | 4 way service Distribution Box with kit kat fuse and aluminum busbar |
| 108 | 8 way service Distribution Box with kit kat fuse and aluminum busbar |
| 109 | Insulated Piercing Connector, Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 110 | Pipe Earthing (each 5th pole to earth) |
| 111 | Coil Earthing |
| 112 | No. 8 GI wire (Dia 4.6mm) 0.131 Kg/Mtr-2 mtr. for connecting pole with coil earthing |
| 113 | Danger Plate (LT) |
| 114 | Black Clamp for Danger Plate 25x3 mm flat, 0.59 KG/Mtr., Flat of 0.510 mtr. Length 36 nos. = (36x0.59x0.510) |
| 115 | G. I. barbed wire anticlimbing device 3 Kg per support |
| 116 | Black Clamp for anticlimbing device 25x3 mm flat, 0.59 KG/Mtr., Flat of 0.510 mtr. Length 108 nos. = (108x0.59x0.510) |
| 117 | GI Nut & Bolt and Washer of different sizes (0.5 kg per pole) |
| 118 | Black paint |
| 119 | Yellow colour paint for background |
| 120 | Civil & ServicesFixing of LT completestay set includes (1) Turn Buckle Assembly (2) Stay Rod & Stay Plate (3) Stay Insulator (4) Stay wire (5) Stay Clamp with nut & bolts. BA will do the excavationincluding excavation, supply of 0.5 cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & standard. |
| 121 | Concrete ratio 1:1.5:3 (500mm x 500mm x 1500mm) = 0.375 cu. Mtr. X 36 nos Pole |
| 122 | Construction of Earthing Chamber including installation of earthing pipe, making earthing chamber, including excavation, soil treatment with bentonide power, calculation of earth resistance, including installation of 30 mtrs. GI pipe 40mm/50mm including welding of GI Flat around pipe |