Supply and ETC of water Cooled Flooded Screw Chiller plant including Compressor, Chiller, Condenser and motor for Central Air Conditioning System andassociated works at Stage-I and II atSTPS, SURATGARH Supply And Etc Of Water Cooled Flooded Screw Chiller Plant Supply And Etc Of Water Cooled Flooded Screw Chiller Plant Including Compressor, Chiller, Condenser And Motor For Central Air Conditioning System And Associated Works At Stage-I And Ii At Stps, Suratgarh , Supply And Etc Of Water Cooled Flooded Screw Chiller Plant Including Compressor, Chiller, Condenserandmotor For Central Air Conditioning System Andassociated Works ( As Per Scope Of Work ) , Screw Compressor ( Capacity 111Tr ) , Square Cage 3-Phase Induction Motor ( 415V, 50Hz, 3-Phase Ac ) , Suitable For Screw Compressor ( Capacity 111 Tr ) , Insulated Flood Chiller ( Shell And Tube Type ) , Copper Tubing , Condenser ( Shell And Tube Type ) , Copper Tubing , Ms Pipe Along With Fittings Size 150Mm , Ms Pipe Along With Fittings Size 125Mm , Insulation With Nitrile Sheet 25Mmthick With Glass Cloth Size 125Mm , Pn16 Lever Type B / F Valve With 25Mm Thick Nitrile Insulation And Glass Cloth Size 125Mm , Pn16 Lever Type B / F Valve Size 150Mm , Pn16 Balancing Valve With 25 Mm Thick Nitrile Insulation And Glass Cloth Size 125Mm , Pn16 Balancing Valvesize150mm , Dial Type 4 Pressure Gauge 0-20Kg / Cm2 , Dial Type 4Temperature Gauge 0-80°C , Water Flow Switch , Armored Pvc / Xlpe Insulated &Pvc Sheathed Cable Of 1.1Kv Grade With Aluminum Conductor Including Heavy Duty Singlecompression Brass Gland And Aluminum Lugs As Required 3.5 Corex 185.0 Sq.Mm , Sub Total ( From 1.01 To 1.15 ) , Total Packing & Forwarding Charges ( On 1.16 ) , Sub Total Of Suppy+P&F ( Including Gst ) , Total Freight , Total Insurance Charges , Other Taxes / Charges ( If Any ) , Total Supply Amount ( 1.18 To 1.21 ) , Etc ( As Per Scope Of Work ) , Etc Charges Of Water Cooled Chiller Plant , Any Other Charges , Total Etc Amount ( 2.01+2.02 ) , Two Years Amc ( Estimated Frequency Of Visit Is 8 Nos. In 2 Years ) , Amc Charge Per Visit , Any Other Charges , Total Amc Amount ( 3.01+3.02 )