|
| 1 | Earth work in excavation in trenches for foundation130.00 Cum 15,024.10 pipe cable etc in ordinary soil (Loan clay or sand)including lift up to 1.5 m. lead up to 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within a lead of 50m. Ch-4 (251) |
| 2 | Laying of base concrete 1:6:12 with cement C.Sand& 40mm Brick ballast including mat.Lab.T&P,etc all complete. ) Providing and laying in cement concrete in 1:6:12 (1 cement: 6 fine sand: 12 gradedbrick aggregate 40 mm. nominal size) and curing complete, including cost of formwork in foundation and floors.Ch-5 (273) |
| 3 | Class -150 brick work in 1:4 cement & coarse sand mortar in foundation and plinthincluding supply of all materials,labour and tools and plants etc. required for proper completion of the work. etc all complete.Ch-6 (305) |
| 4 | P/L of 2 cm (3/4) thick damp proof course with(360) cement and apporved coarse sand 1:2 and including water proofing materials as ordered by the Engineer-in charge in the proportion as specified bythe manufacturer including supply of all material, labour and tools and plants etc. required for proper comptetion of the work including proper curing and shuttering as necessary.Ch-7 (360 |
| 5 | R.C.C works with cement approved coarse sand and2 cm (3/4”) gauge approved stone ballast in the proportion 1:2:4 (1 cement:6 aggregate) in lintels ofdoors and windows excluding supply of reinforcement and its bending the same with 24 BWG binding wire and necessary centringand shuttering etc. and also including supply of all materials labours and tools and plants etc. required for proper completion of work. stone ballast butfor slab including shuttering mat. Lab etc. All complete Ch-5 (284) |
| 6 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (whennot includein overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastagebend hooks and authrized overlapping shall be measured up to floor two level(over all Rate)12 mm to 32 mm. toretc.all complete. Ch-10 (504 c) |
| 7 | Laying, spreading and compaction of local screened sand n water logged location for construction of road embankment including all leads and liftscompleted job as per technical specification clause 305 and direction of Engineer { Ch 4 (255)+ ch 1 (b)} |
| 8 | Provinding & Laying of 8 to 10 mm thick ivory or1 (si nolight shade vetrified tiles of 600 mm x 600 mm sizein flooring or skriting laid with 1:3 cement mortarcement : 3 coarse sand ) finishing with cement slurry & with pigment grouting & polishing complete i/c supply of all materials labour T & P required for proper completion of work. Ch-14 (si no 15) |
| 9 | Providing and fixing G.I. chain link fabric fencingof required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as perthe direction ofEngineer-in-charge. 1 Made of G.I. wire of dia 4 mm |
| 10 | Providing and Fixing M.S Tubular Frames for doors, Windows, Ventilators and cupboard with recatangular/L-Type sections,made 0f 1.60mm thick M.S sheet,joint mitred, welded and grinded finish, with profiles of required size, including fixing of necessary butt hinges and crews and applying a priming coast of approved steel primer. |
| 11 | Supply & fixing of 16 mtr High mast shaft of approved make with rising system hot dip glavanized inside & out side dip, heaving pole sheet thickness 3 mm. Top dia minium 150 mm, Bottomdia 360 mm base plate 32 mm having nocircumferntial weld, with accessories for hight mast such as head frame suitable for 6 to 12 luminaries & its control gear boxes 1.5 HP power tool moter, 3 point suspension system with steel wire rope 6 mm dia, doule drum winch, including making suitable foundation as per manufature drawing / site reuiment alog with foundation bolts nuts, washer,anchor plates etccompletee in all respect |
| 12 | Tree Transplantingis a technique in which tree isRelocated to specified location in order to rescue, save, or salvage certain trees etc all complete as per direction of engineer-in-charge 1) up to 50 cm girth |
| 13 | Tree Transplantingis a technique in which tree is Relocated to specified location in order to rescue, save, or salvage certain trees etc all complete as per direction of engineer-in-charge 1) 50cm to 90 cm girth |