| 1 | STRENGTHENING PERIYAR NINAIVU SAMATHUVAPURAM ROAD IN THALAMBADI PANCHAYAT IN MARUNGAPURI PANCHAYAT KM 0/0 - 1/300 (VPR R - 1031)Clearingthe Scrub jungle including all labour charges for burrying and burning etc., |
| 2 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2min hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A |
| 3 | Providing and Laying US gravel soling to compacted thick including cost and conveyance of gravel from approved sources to works site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. KM 0/000 - 1/000 |
| 4 | KM 1/000 - 1/300 |
| 5 | Providing and laying Tack Coat over the WBM surface using 3Kg ofEmulsiom bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will be supplied departmentally at departmental section store at Union Office and cost of the same which will be recovered from the contractor\"s bill at the rates specified in the special condition appended herewith including conveyance of bitumen from \"section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges for cleaning the surface before the application of bitumen binder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as directed by the Engineer incharge and all other incidental charges etc., complete as per clause 505 of most specifications. KM 0/000 - 1/000 |
| 6 | KM 1/000 - 1/300 |
| 7 | Providing and laying open graded premix carpet with seal coat 20 mm consol-idated thickness using 0.18 Cum of 13.2 mm IRC size machine crushed HBG metal and 0.09 Cum of 11.2 mm IRC size machine crushed HBG metal with 14.6 Kgs of bitumen for premixing per 10 Sqm. metre of premix carpet and 0.09 Cum of 6.75 mm IRC HBG size machine crushed HBG metal with 9.80 Kg. of bitumen per 10 Sqm. of seal coat including cost and conveyance of all materials from approved sources to worksite and stacking them to standard departmental gauge for pre-measurement including bitumen which will be supplied by the department at the departmental section store at Panchayat Union Office including conveyance of bitumen from section stores to worksite and the cost of the same will be recovered from the contractors bill at the rates specified in the special condition appended herewith including heaking and mixing the materials using mini hot mix plant for premix carpet including all labour charges for spreading the same finishing to specifications, grades and cross section and consolidation by power roller including heating and sparying the bitumen for seal coat over finished permix carpet surfaces and spreading the 6.75 mm IRC chips uniformly over the surface and rolling with power roller rolling including hire and fuel charges for mini hot mix plant. power roller and all other tools and plants employed, \"including all other incidental charges etc., complete. KM 0/000 - 1/000 |
| 8 | KM 1/000 - 1/300 |
| 9 | Provision for Name board Charges |
| 10 | RENOVATION RCC ARCH Exterior Emulsion Painttwocoats with approved exterior emulsion paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete. |
| 11 | Scaffolding |
| 12 | Provision for Photo charges |
| 13 | RENOVATION 30000 LITRES RCC OHTExterior Emulsion Painttwocoats with approved exterior emulsion paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete. |
| 14 | RCC Cover Slab |
| 15 | 50mm dia GI pipes for inlet connection |
| 16 | 50mm dia GI pipes for Delivery connection |
| 17 | 50mm dia GI Elbow |
| 18 | 65mm dia GI Coupler |
| 19 | 50mm dia GM Gate Valve |
| 20 | Provision for Name Board |
| 21 | Provision for Photo charges |
| 22 | PERIYAR STATU REPAIRProvision for Periyar Painting |
| 23 | Provision for Giril Painting |
| 24 | RENOVATION OF PLAY AREAGravel Filling |
| 25 | Provision for Painting For Play Items |
| 26 | Provision for Seasaw,…Etc., |
| 27 | Diff. Cost of material |
| 28 | Provision for Photo charges |
| 29 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |