|
| 1 | Procurement of Fine Chemicals for Chemical Laboratory, BTPS. |
| 2 | AIR CONDITIONER, WINDOW TYPE, CAP: 1.5TAdditional Data:(1). Window A.C., (2). Capacity: 1.5 TR,(3). Suitable for 250 V, 50 Hz AC Supply,(4). Coolant: Eco Friendly Gas (R-22 or itshigher grade), (5). Compressor: Rotary, (6).Rating: Three Star (***), (7). Color: White,(8). Noise Level: 37 - 43 dB, (9). RemoteControl operated with Digital Display atUnit, (10). Coil Unit must be made ofCopper.Make:BlueStar India./ Hitachi./ Voltas./ Carrier. |
| 3 | AIR CONDITIONER, WINDOW TYPE, CAP: 1TAdditional Data:(1). Window A.C., (2). Capacity: 2 TR,(3). Suitable for 250 V, 50 Hz AC Supply,(4). Coolant: Eco Friendly Gas (R-22 or itshigher grade), (5). Compressor: Rotary, (6).Rating: Three Star (***), (7). Color: White,(8). Noise Level: 37 - 43 dB, (9). RemoteControl operated with Digital Display atUnit, (10). Coil Unit must be made ofCopper;Make:BlueStar India./ Hitachi./ Voltas./ Carrier. |
| 4 | AIR CONDITIONER SPLIT TYPE CAPACITY:1.5T FORROOM ACAdditional Data:(1) Split A.C., (2). Capacity: 1.5 TR, (3).Suitable for 250 V, 50 Hz, AC Supply, (4).Coolant: Eco Friendly Gas (R-22 or itshigher grade), (5). Compressor: Rotary, (6).Rating: Three Star (***), (7). Color: White,(8). Noise Level: 37 - 43 dB, (9). RemoteControl operated with Digital Display atIndoor Unit, (10). Outdoor Unit Coil maybe made of Copper or Alloy but IndoorUnit must be made of Copper.Make:BlueStar India./ Hitachi./ Voltas./ Carrier. |
| 5 | AIR CONDITIONER SPLIT TYPE CAPACITY: 2TAdditional Data:Specification:(1) Split A.C., (2). Capacity: 2 TR, (3).Suitable for 250 V, 50 Hz, AC Supply, (4).Coolant: Eco Friendly Gas (R-22 or itshigher grade), (5). Compressor: Rotary, (6).Rating: Three Star (***), (7). Color: White,(8). Noise Level: 37 - 43 dB, (9). RemoteControl operated with Digital Display atIndoor Unit, (10). Outdoor Unit Coil maybe made of Copper or Alloy but IndoorUnit must be made of Copper.Make:BlueStar India./ Hitachi./ Voltas./ Carrier. |
| 6 | Installation & commissioningof split machine. |
| 7 | Installation & commissioningof window machine. |
| 8 | installatio of insulated refrigrant tubeincluding supply of material. |
| 9 | Installation of ODU bracketIncluding supply of material. |
| 10 | Installation of PVC Drain pipeincluding supply of material. |
| 11 | Installation of wrapping tapeincluding supply of material. |
| 12 | Installation of main cord && communication cable 4 core-including supply of material. |