| 1 | Cartage of following material from Store centre, Mathura to work site. |
| 2 | ST Pole/PCC Pole (11/9/8.5 mtr. Long) |
| 3 | ST Pole Pole (13 mtr. Long) |
| 4 | 400 KVA T/F. |
| 5 | 250 KVA T/F. |
| 6 | 100 KVA T/F. |
| 7 | LT Aerial Bunch conductor. |
| 8 | LT PVC cable 1cx630/400/240 sq.mm. |
| 9 | LT XLPE cable of size 3.5x240/185/120/70 Sq. mm. |
| 10 | ACSR Dog/Weasel/Ins. Weasel conductor |
| 11 | Other line material such as cross arm, MS top channel, bottom channel, Tee-channel, clamps, Suspension Clamp, Dead End Clamp, Cross Arm Holding Clamp, Danger Board, Pin Insulator, Disc Insulator nut & bolts etc. |
| 12 | Digging of pit & erection of new single support ST Pole (13 mtr. long) including grouting of pole and fixing of all clamps, cross arm, pin/disc insulator & other accessories with providing stone pad as per relevant drawings. Any fabrication if required for above support. |
| 13 | Digging of pit & erection of new single support PCC Pole (8.5 mtr.) for LT line on ABC including grouting of pole and fixing of all clamps, insulator & other accessories as per relevant drawings. Any fabrication if required for above support. |
| 14 | Earthing of ST/PCC pole/Body earthing of T/F. by M.S earth rod. |
| 15 | Painting of ST pole. |
| 16 | Digging of pit & erection of Stay rod with grouting cement sand and brick ballast including Nuzzling, binding Complete. |
| 17 | Laying of 33/11KV/LT line on Dog/weasel conductor on erected poles. |
| 18 | Laying of AB conductor for LT line on erected poles. |
| 19 | Laying of LT PVC cable 1cx630/400/240 sq.mm. |
| 20 | Guarding of 33/11KV line. |
| 21 | Installation of Distribution box on ST Pole/PCC Pole for AB Conductor. |
| 22 | Providing & fixing of Aluminium Lug 150/240/400/630 |
| 23 | Installation of D.O. Fuse Set of 11 KV |
| 24 | Removal of old transformer (250KVA) with all connected accessories from existing plinth. |
| 25 | Removal of old transformer(160/100/63/25/16 KVA) with all connected accessories from existing double pole. |
| 26 | The Construction of new Plinth of Size 5’X5’X4’ aboveground level and one ft. below the ground level for 400/250 KVA transformer |
| 27 | Installation of following transformer on Plinth/Double pole with all connecting accessories jumering etc. including carriage of transformers from store centre, Mathura to work site. |
| 28 | 400 KVA Transformer on Plinth |
| 29 | 250 KVA Transformer on Plinth |
| 30 | 100 KVA Transformer on Double Pole structure |
| 31 | Erection of Tail less unit complete |
| 32 | Construction of M.S angle fencing of size (3M x3M x2M) around the plinth of 400/250 KVA transformer and gap between the M.S angle should not be more than 65mm. |
| 33 | Complete chemical earthingof 11/0.4 KV 250/400 Distribution Transformer by digging pits 6” dia upto 3 mtr. deep including chemical filled pipe in between (pipe-in-pipe) ISI mark B Grade & connecting with G.I strip of size 50mm X 6mm with neutral/body of 11/0.4 KV distribution transformer to above pipe-in-pipe (PIP) and filling of chemical crystalline conductive mixture containing highly conductive material around the (pipe-in-pipe) up to 3 Mtr. including making of chamber at the top of the earthing. Other details are as below:-1.Earth pipe material – mild steel, Galvanised.2-Main Electrode diameter – 42.4mm.3-Auxiliary Electrode pipe, Diameter – 76mm.4-Wall Thickness of main Electrode :- 2.6mm.5-Wall thickness of auxiliary Ist whole:- 3.2mm.6- Length of earthing electrode (PIP):- 3 Meter. |
| 34 | Re-sagging of loose 33KV/11KV/LT line on new/old erected poles. |
| 35 | Safe Carriage with Loading and unloading of Removed T/F and LT Cable from Work side to 132 KV S/S Store Center Mathura |
| 36 | Dismantling of single support ST Pole/ PCC (13/11/9mtr.) pole with complete accessories and cartage of material from work site to Store Center, Mathura. |
| 37 | Dismantling of LT line and cartage of material from work site to Store Centre, Mathura. |