}

Tender For Increasing Capacity Of Transformer Under Edd Hamirpur, hamirpur-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Tender For Increasing Capacity Of Transformer Under Edd Hamirpur. Submission Date for this Tender is 03-04-2023. Transformer Supply Tenders in hamirpur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

36967330
Tender For Increasing Capacity Of Transformer Under Edd Hamirpur
Open Tender
Indian
Uttar Pradesh
hamirpur
03-04-2023

Tender Details

Tender For Increasing Capacity Of Transformer Under Edd Hamirpur-2 Cartage Of8.5 Mtr Poles From Store Hamirpur Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including Etc. And Also Including The Cost Of Labor, T & P Carrier Etc. Required For Proper Completion Of Work. 3 Cartage Ofline Material Viz. Stone Pad, Top Channel, Dropper Channel, Dise Insulator, And Other Line Material From Esc / Ask Store, Hamirpur Or Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Includingthe Work Of Its Loading & Unloading At The Respective Ends, Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labor, T&P And Carrier Etc. Required For Proper Completion Of Work. 4 Erection Of Single Support Of8.5 Mtr. ( Any Other Place ) Follwing Poles Including Complete H.T. / L.T. Fittings As Per Resspo Manual And As Per Direction Of Engineer In Charge The Cost Oflabor, T&P And Carrier Etc. Required For Proper Completion Of Word. 5 Grouting Ofsingle Support 8.5Mtr. Polesas Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement Sand & Bricks Ballast / Stone Ballast In Ratio 1:4:8 ( 0.285Cu.Mtr. Each ) Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirment. 6 Erection Of Double Support Of ( Any Other Place ) Poles Including Complete H.T. / L.T. Fittings As Per Resspo Manual And As Per Direction Of Engineer In Charge The Cost Oflabor, T&P And Carrier Etc. Required For Proper Completion Of Work. 7 Grouting Ofdouble Pole 8.5 Mtr. Polesas Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement Sand & Bricks Ballast / Stone Ballast In Ratio 1:4:8 ( 0.285Cu.Mtr. Each ) Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirment. 8 Erection Of Stay Setincluding The Work Of Nuzzling Etc. As Per Resspo Manual. 9 Erection Of Earthing Complete As Per Direction Of Supervising Engineer.It Includes The Cost Of Labour, T &P Carrier Etc. Required For Proper Completion Of Work 10 Laying, Sagging, Stringing, Binding And Jump Ring Etc. Of Acsr Wesel Conductor New / Oldon The Newly Erected Pole Any Other Place. As Per Resspo Manual And As Per Direction Of Supervising Engineer. 11 Laying, Sagging, Stringing, Binding And Jump Ring Etc. Ofabc Cable 3X50+1X35+1X16mm New / Oldon The Newly Erected Pole Any Other Place. As Per Resspo Manual And As Per Direction Of Supervising Engineer. 12 Laying, Sagging, Stringing, Binding And Jump Ring Etc. Ofabc Cable 3X95+1X70+1X16mm New / Oldon The Newly Erected Pole Any Other Place. As Per Resspo Manual And As Per Direction Of Supervising Engineer. 13 Gouting Of Stay Setas Per Resspo Manual. And Also Including The Cost Of All Grouting Material, Labour T&P Etc. Required For Proper Completion Of Work . 14 Tree Chopping Of 11Kv Line Near By11kv H.T. Line & L.T. Line Any Other Place. 15 Febrictionof11kv V Type X-Arms ( 16Mm Hole, 2No Each V Type X-Arms ) As Per Resspo Dragging.With Loading, Unloading & Cartage, All Complete Work. 16 Febriction Of11kv Sub-Station Base Angle ( 16Mmhole 4No Each S / S Base Angle ) As Per Resspo Dragging. With Loading, Unloading & Cartage, All Complete Work. 17 Febrictionof11kv Dropper Channel ( 16Mm Hole, 7No Each Dropper Channel ) As Per Resspo Dragging.With Loading, Unloading & Cartage, All Complete Work. 18 Febriction Of11kv Top Channel ( 16Mm & Hole 10 No Each Top Channel ) As Per Resspo Dragging. With Loading, Unloading & Cartage, All Complete Work. 19 Febriction Oft-Off Channel100x50x1300 ( 16Mm Hole8no Each T-Offchannel ) As Per Resspo Dragging. With Loading, Unloading & Cartage, All Complete Work 20 Ms Nut , Bolt & Washers. Diffirent Size. 21 Fixing & Erection Of11kv V Type X-Arms As Per Resspo Dragging. All Complete Work 22 Fixing & Erection Of11kv Sub-Station Base Angle 75X75x6x2028mmas Per Resspo Dragging. All Complete Work 23 Fixing & Erection Of11kv Dropper Channelas Per Resspo Dragging. All Complete Work 24 Fixing & Erection Of11kv Top Channelas Per Resspo Dragging.All Complete Work 25 Fixing & Erection Of11kv T-Offchannel100x50x1300 As Per Resspo Dragging. All Complete Work 26 Safely Cartage Offollowingnew T / F From Store Centre Hamirpurto Sisolar, Mahalla Takiya Maudaha, Ichauli, Sijwahi, Gusiyari , & Near Primary School Village Kharaunj Kurara. Of New / Repairedthee Phase T / F. 27 ( A ) 63Kva Transformer. 28 ( B ) 100Kva Transformer. 29 Unloading & Installation Offollowing New Transformer On Thenewlynew Sub-Station Insisolar, Mahalla Takiya Maudaha, Ichauli, Sijwahi, Gusiyari , & Near Primary School Village Kharaunj Kurara&Proper Alignment And As Per Direction Ofsupervising Engineer / Resspomanual. 30 ( A ) 63Kva Transformer. 31 ( B ) 100Kva Transformer. 32 Dismantling Of100kva Old Transformerat Pilinth In Near Nalapar Kurara Twon .Bycrane, Hydra & Labour Etc. 33 Safelyloadingof100kva Oldtransformerinnear Nalapar Kurara Twon Bycrane, Hydra & Labour Etc. 34 Safely Cartage Of100kva Old Transformerinnear Nalapar Kurara Twon To Store Centrehamirpur . 35 Safelyunloadingof 100Kvaoldtransformerfromesc Hamirpur . By Crane, Hydra & Labour Etc. 36 Safelyloading Of250kva New T / F From Store Cemtre Hamirpurby Crane, Hydra & Labour Etc. 37 Safely Cartage Of250kva New T / F From Store Centre Hamirpurtonear Nalapar Kurara Twon . Of New / Repairedthee Phase T / F. 38 Construction Of 11 / 0.4Kv., 250Kva Transformer Plinth Of Size6’X6’X5’ Above Ground Level And One Fit Below The Ground Level Of 9”. After Excavation Of 4” Earth, Brick Ballast Shall Be Provided And Remaining Will Be Done Properly. After That A Retaining Wall Of 9” Width By First Class Brick In Ratio 1:5 Of Cement And Sand Shall Be Made The Earth Shall Be Filled Up To One Fit Blow Innear Nalapar Kurara Twon. 39 Unloading & Installation Of250kvanew Transformer On Thenewly Plinth In Near Nalapar Kurara Twon &Proper Alignment And As Per Direction Ofsupervising Engineer / Resspomanual. 40 Erection Of Allumunium Lug. 41 Erectionof Lt Pvcallumunium Cable .Diffirent Size 42 Erection& Installation Ofdo Fuse Set 43 Erection & Installation Oftpmo Set

Key Value

Document Fees
INR 1180 /-
EMD
INR 3000.0 /-
Tender Value
INR 3.72 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail