Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Construction Of 11/.4 Sub Station And Increasing Capacity Of Transformer Under The Jurisdiction Of Electricity Distribution Division Iii, Fatehabad.. Submission Date for this Tender is 28-03-2023. Transformer Supply Tenders in fatehabad Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Carriage of Following materialfromstore centeragra to site of work includingits loading and unloading at the respective ends.(Distanse 0-40 km) |
2 | 11 Mtr STP Pole |
3 | 8.5 Mtr Pcc pole |
4 | Line material viz arial buch conductor/Weasel Conductor/Dog, G.I. earth wire, cross arm angle, channel, insulators, Pin insulater, fuse set, clap and all other material reqriied at site. |
5 | 16 KVA T/F |
6 | 25 KVA T/F |
7 | 63KVA T/F |
8 | 100 KVA T/F |
9 | 400 KVA T/F |
10 | Erection of single pole of8.5 Mtr long PCC poles, including fixing of accessories for HT line as per RESPO manual and as per direction of Engineer Incharge. |
11 | Erection of doublepole of 8 Mtr long PCC poles, including fixing of accessories for HT line as per RESPO manual and as per direction of Engineer Incharge. |
12 | Erection of doublepole of 11 Mtr long STP poles, including fixing of accessories for HT line as per RESPO manual and as per direction of Engineer Incharge. |
13 | Making HT T-off connection on exiting mains labour T&P and carrier etc required for proper complition of work. |
14 | Erection of stays in 1:4:8 ratio cement, sand and stone ballast, its tighting, binding, nozelling etc of stay wire with stay and stay clamp of pole as per site requirement. |
15 | Fixing of earthing rod including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work |
16 | Grouting ofSTP pole |
17 | Grouting of 8.5 Mtr PCC Pole |
18 | installation of 11 kv Fuse set |
19 | Laying, stringing, sagging, binding and jumpering ACSR Weasal Conductorof for construction of 11 KV Line as per RESPO norms. |
20 | Installation of Following transformers on existing double pole structure/single pole & making HT/LT connection |
21 | 16 KVA T/F |
22 | 25 KVA T/F |
23 | 63 KVA T/F |
24 | 100 KVA T/F |
25 | 400 KVA T/F |
26 | Dismetaling of following old 11/.4 kw T/F and carriage of TF from site to store Agra. 1 250 KVA T/f |
27 | 25 KVA T/F |
28 | Chemical Earthing for 100 KVAT/F nutal and body |