Construction Of 11/.4 Sub Station And Increasing Capacity Of Transformer Under The Jurisdiction Of Electricity Distribution Division Iii, Fatehabad., fatehabad-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Construction Of 11/.4 Sub Station And Increasing Capacity Of Transformer Under The Jurisdiction Of Electricity Distribution Division Iii, Fatehabad.. Submission Date for this Tender is 28-03-2023. Transformer Supply Tenders in fatehabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

36950058
Construction Of 11/.4 Sub Station And Increasing Capacity Of Transformer Under The Jurisdiction Of Electricity Distribution Division Iii, Fatehabad.
Open Tender
Indian
Uttar Pradesh
fatehabad
28-03-2023

Tender Details

Construction Of 11/.4 Sub Station And Increasing Capacity Of Transformer Under The Jurisdiction Of Electricity Distribution Division Iii, Fatehabad.

Key Value

Document Fees
INR 590 /-
EMD
INR 1700.0 /-
Tender Value
INR 1.70 Lakhs /-

BOQ Items

Name of Works : construction of 11/.4 s/s and incresing capicity of T/f under the jurisdiction of Electricity Distribution Division III, Fatehabad.
Sl. No. Item Description
1Carriage of Following materialfromstore centeragra to site of work includingits loading and unloading at the respective ends.(Distanse 0-40 km)
211 Mtr STP Pole
38.5 Mtr Pcc pole
4Line material viz arial buch conductor/Weasel Conductor/Dog, G.I. earth wire, cross arm angle, channel, insulators, Pin insulater, fuse set, clap and all other material reqriied at site.
516 KVA T/F
625 KVA T/F
763KVA T/F
8100 KVA T/F
9400 KVA T/F
10Erection of single pole of8.5 Mtr long PCC poles, including fixing of accessories for HT line as per RESPO manual and as per direction of Engineer Incharge.
11Erection of doublepole of 8 Mtr long PCC poles, including fixing of accessories for HT line as per RESPO manual and as per direction of Engineer Incharge.
12Erection of doublepole of 11 Mtr long STP poles, including fixing of accessories for HT line as per RESPO manual and as per direction of Engineer Incharge.
13Making HT T-off connection on exiting mains labour T&P and carrier etc required for proper complition of work.
14Erection of stays in 1:4:8 ratio cement, sand and stone ballast, its tighting, binding, nozelling etc of stay wire with stay and stay clamp of pole as per site requirement.
15Fixing of earthing rod including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
16Grouting ofSTP pole
17Grouting of 8.5 Mtr PCC Pole
18installation of 11 kv Fuse set
19Laying, stringing, sagging, binding and jumpering ACSR Weasal Conductorof for construction of 11 KV Line as per RESPO norms.
20Installation of Following transformers on existing double pole structure/single pole & making HT/LT connection
2116 KVA T/F
2225 KVA T/F
2363 KVA T/F
24100 KVA T/F
25400 KVA T/F
26Dismetaling of following old 11/.4 kw T/F and carriage of TF from site to store Agra. 1 250 KVA T/f
2725 KVA T/F
28Chemical Earthing for 100 KVAT/F nutal and body
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail