Work Of Electrification And Capacity Increasing And Associated Works Etc At Different Places Under Deposit Scheme Sansad Vidhayak Nidhi In The Jurdiction Of Electricity Distribution Division Akbarpur Ambedkarnagar, akbarpur-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Work Of Electrification And Capacity Increasing And Associated Works Etc At Different Places Under Deposit Scheme Sansad Vidhayak Nidhi In The Jurdiction Of Electricity Distribution Division Akbarpur Ambedkarnagar. Submission Date for this Tender is 29-03-2023. Clamps Tenders in akbarpur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

36916997
Corrigendum : Work Of Electrification And Capacity Increasing And Associated Works Etc At Different Places Under Deposit Scheme Sansad Vidhayak Nidhi In The Jurdiction Of Electricity Distribution Division Akbarpur Ambedkarnagar
Open Tender
Indian
Uttar Pradesh
akbarpur
29-03-2023

Tender Details

Work Of Electrification And Capacity Increasing And Associated Works Etc At Different Places Under Deposit Scheme Sansad Vidhayak Nidhi In The Jurdiction Of Electricity Distribution Division Akbarpur Ambedkarnagar- 1 Cartage Including Loading , Unloding & Proper Stacking Of Following Stock Materials From Store Center / Department Store To Dump Site Distance To 80 Kms 2 A. Pcc Pole 8.5 Mtr Long. 3 B. St Pole 11 Mtr. Long. 4 C. Acsr Weasel Conductor. 5 D. Xlpe Cable 11 Kva. 6 E. Abc 3X50 Sqmm. 7 F. Lt Pvc Cable 4X25 Sqmm. 8 G. Cable Jointing Kit O / D & I / D. 9 H. 11 Kva Pilfer. 10 I. T / F 16 Kva 11 J. T / F 25 Kva 12 K. T / F 63 Kva 13 L. T / F 100 Kva 14 M. T / F 250 Kva 15 N. Other Matching Material 16 Dragging Of Pcc / Stp Pole From Dump Site To Pit Site 17 Grouting & Binding Of Stay In 1:4:8 Ratio With Ratio Cement, Sand & Brick Ballastincluding Cost Of All Grouting Materials As Per Resspo Norms 18 Instalation Of Al. Lug Suitable Size For 63 Kva As Per Resspo Norms 19 Febrication And Erection Of Single Pcc Pole Including Grouting With 1:4:8 Ratio Cement, Sand & Brick Ballast & Including Digging Of Pit And Fixing Of All Accessories Clamp * Earthing Asas Per Resspo Norms ( Cost Of Clamp Borne By Contractor ) 20 Febrication And Erection Of Double Pcc Pole Including Grouting With 1:4:8 Ratio Cement, Sand & Brick Ballast & Including Digging Of Pit And Fixing Of All Accessories Clamp * Earthing As Per Resspo Norms ( Cost Of Clamp Borne By Contractor ) 21 Febrication And Erection Of Single St Pole Including Grouting With 1:4:8 Ratio Cement, Sand & Brick Ballast & Including Digging Of Pit And Fixing Of All Accessories Clamp * Earthing As Per Resspo Norms ( Cost Of Clamp Borne By Contractor ) 22 Febrication And Erection Of Double St Pole Including Grouting With 1:4:8 Ratio Cement, Sand & Brick Ballast & Including Digging Of Pit And Fixing Of All Accessories Clamp * Earthingas Per Resspo Norms ( Cost Of Clamp Borne By Contractor ) 23 Earthing Of Pole As Per Resspo Norms. 24 Stringing, Sagging, Bonding And Jumpering Of Acsr Weasel Conductoras Per Resspo Norms. 25 Stringing, Sagging, Bonding And Jumpering Of Abcconductor 3 Phaseas Per Resspo Norms. 26 Instalation Of Lt Pvc Cable 4X25 Sqmm. As Per Resspo Norms 27 Laying Og 11 Kv 3X70 Mm Xlpe Single Cable By Digging Of Trench Underground ( Only Xlpe Cable Will Be Supplied By Department ) As Per Resspo Norms. 28 Hosting & Hnaging Of 11 Kv 3X120 Mm Xlpe Single Cable On Double Pole Structure To Giving Connection To Transformer ( Cost Of All Accessories Will Be Borne By Contractor ) As Per Resspo Norms. 29 Instalation Of Cable Jointing Kit I / D& O / D As Per Resspo Norms. 30 11 Kva Pilfer Instalation As Per Resspo Norms. 31 Concreating Of Pcc Ploe As Per Resspo Norms. 32 Plinth & Fencing Of T / F As Per Resspo Norms. 33 Gaurding Of 11 Kv Line As Per Resspo Norms. 34 Mounting Of 16 Kva T / Fas Per Resspo Norms. 35 Mounting Of 25 Kva T / Fas Per Resspo Norms. 36 Mounting Of 63 Kva T / F As Per Resspo Norms. 37 Mounting Of 100 Kva T / F As Per Resspo Norms. 38 Mounting Of 250 Kva T / F As Per Respo Norms 39 Receved Back & Dismentling Of 25Kva T / F As Per Resspo Norms. 40 Receved Back & Dismentling Of 63Kva T / F As Per Resspo Norms. 41 Receved Back & Dismentling Of 100Kva T / F As Per Resspo Norms.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 27-Mar-2023 date Date 29-03-2023

Key Value

Document Fees
INR 3540 /-
EMD
Refer document
Tender Value
INR 15 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail