| 1 | Supply, installation, testing and commissioning of hot water piping and fittings complete with supports, hangers and specified insulation thickness. All piping shall be black mild steel Class C, ISI marked withfitting. The unit rate of piping shall include this support arrangementand hangersi/c wooden isolator where required under insulation atsupportpoints.The piping shall be insulated with 80Kg/ M.Cub. section density fiberglass insulationfinally coveredwith Al. Claddingfor inside and 6mm plaster for outside complete as required |
| 2 | 32 mm pipe with 50 mm insulation. |
| 3 | 25 mm pipe with 50 mm insulation. |
| 4 | 19 mm pipe with 50 mm insulation. |
| 5 | Supplying, installation, testing & commissioning offorced air radiator fan units construction made ofpanels inside layer with polyurethane foam insulation of between panelssupplied with factory fitted powder coated supply air plenum with acostic insulation, abs/aluminiumsupply airpowder coated extruded grill .Three layer deep heating coil section only with aluminium finned copper tubes ,drain pan ,circular fan having high static pressure & fan motor suitable to operate from 230±10% volt, 50 Hz, single phase power supply complet with arrangement of moudulating control thermostatcomplete as required |
| 6 | Supplying, installation, testing & commissioning ofwater softner suitableto deliver two cum mtr per hr withvessel and multiport valve complete as required |
| 7 | Supply, installation, testing and commissioning of Gate valves/ Sluice/Glove/ Butterfly valves required. Valves 65 mm and aboveshall of C.I. IBR86 BodyGrade A , with flanged ends and gunmetal trim, yoke type -rising stem ,P N. 1.6 andi/c flanges and valves upto 50mm shall be gunmetal flenged ends non rising stem, integral seat, bodySant/ Kirloskar/Leader/Puri |
| 8 | 19mm |
| 9 | 38mm |
| 10 | Supplying, installation, testing & commissioning of refrigerant based heating unit of heat output upto 4200 kcal /Hr(Air-conditioning unit)working on single phase votage range 140 to 280 volt i/c outdoor unit completeas required in all respects. |
| 11 | Supplying and fixing wall mounting Automatic Voltage Stablizer 4 KVAfollowing rating with output 240 volts with voltage regulation and time delay operationsuitable for 1.5TR capacity Split type Air Conditioner including making connections etc as required complete in all respects. |
| 12 | Providing and fixing of M.S. Outdoor heavy duty stand powder coated suitable to hang outdoor Anchor bolts as required complete in all respects and as per direction of Engineer-in-charge. |
| 13 | Supplying & fixing ofcopper tubes for refrigerant and condensatefor indoor unit to outdoorand including the cost of insulation etc. as required complete in all respects. |
| 14 | Supplying and fixing of 25mm dia of PVC drain pipe along with the accessories in surface/recess including cutting the wall and making good the same in case of recessed conduit as required. |
| 15 | Supplying & fixing ofcomunication control wiring fourcore2.5 sq mm round flexible cable suitable forunits as required complete in all respects. |