}

Repair / Maintenance Of Central Type Ac Plant And Laundry Plant At Af Station Halwara Under Ge (Af) Halwara Repair / Maintenance Of Central Type Ac Plant And Laundry Plant At Af Station Halwara Under Ge (Af) Halwara, halwara-Punjab

Military Engineer Services-MES has published Repair / Maintenance Of Central Type Ac Plant And Laundry Plant At Af Station Halwara Under Ge (Af) Halwara Repair / Maintenance Of Central Type Ac Plant And Laundry Plant At Af Station Halwara Under Ge (Af) Halwara. Submission Date for this Tender is 05-05-2023. HVAC Tenders in halwara Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

36762587
Corrigendum : Repair / Maintenance Of Central Type Ac Plant And Laundry Plant At Af Station Halwara Under Ge (Af) Halwara Repair / Maintenance Of Central Type Ac Plant And Laundry Plant At Af Station Halwara Under Ge (Af) Halwara
Open Tender
Indian
Punjab
halwara
05-05-2023

Tender Details

Repair / Maintenance Of Central Type Ac Plant And Laundry Plant At Af Station Halwara Under Ge (Af) Halwara Repair / Maintenance Of Central Type Ac Plant And Laundry Plant At Af Station Halwara Under Ge (Af) Halwara

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 28-Mar-2023 CWE/AF AMB/HAL-46/2022-23 Dates Date 12-04-2023
2 03-Apr-2023 CWE/AF AMB/HAL-46/2022-23 DATES Date 20-04-2023
3 12-Apr-2023 CWE/AF AMB/HAL-46/2022-23 bidding dates Date 28-04-2023
4 17-Apr-2023 CWE/AF AMB/HAL-46/2022-23 BOQ BOQ 28-04-2023
5 17-Apr-2023 WE/AF AMB/HAL-46/2022-23 tender documents Terms and Conditions 28-04-2023
6 28-Apr-2023 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 05-05-2023

Key Value

Document Fees
INR 500 /-
EMD
INR 99800.0 /-
Tender Value
INR 49.90 Lakhs /-

BOQ Items

NAME OF WORK : REPAIR / MAINTENANCE OF CENTRAL TYPE AC PLANT AND LAUNDRY PLANT AT AF STATION HALWARA UNDER GE (AF) HALWARA
Sl. No. Item Description
1Dismantling including taking down/out unserviceable compressor of central type AC plant, 21TR capacity Make -Voltas, Model : 5H40 including opening complete unit, repairing the crank shaft, remetling, grinding , polishing,checking of cyclinder bore with and including replacement of unserviceable parts such as pistons set, connecting rod, shaft seal assembly, discharge/suction reeds, big end bearing, small end bush set, gasket packing etc and re-assembling of the complete compressor unit and testing etc complete all as specified & directed . Notes :-(i)The dismantling/taking out of old spare parts and fixing only of new spare parts deemed to be included in quoted rate however the supply only of new spare parts shall be measured and paid separately under BOQ item No. 1.01 to 1.25 here-in-after. (ii) These spare parts shall be of same make & model (i.e. make Voltas & model 5H40) as existing at site or equivalent make & model as approved by GE. The spare parts shall be compatible for central type AC plant compressor of 21 TR capacity. (iii)The draining out of compressor oil and filling with fresh oil included in quoted rates however the fresh compressor oil (if required) shall be measured and paid separately.
2Supply only compressor gasket complete all as specified & directed.
3Supply only piston assembly including piston with pin complete all as specified & directed.
4Supply only lock ring (circlip), oil ring, piston ring compressioncomplete all as specified & directed.
5Supply only seal end & pump endbearingincluding washercomplete all as specified & directed.
6Supply only discharge valve guide assembly complete all as specified & directed.
7Supply only big end bearing half section of connecting rod (set of two ) complete all as specified & directed.
8Supply only main bearing seal end complete all as specified & directed.
9Supply onlyvalve plate complete all as specified & directed.
10Supply only suction valve disk complete all as specified & directed.
11Supply only discharge valve guide lock washer complete all as specified & directed.
12Supply only unloader sleave complete all as specified & directed.
13Supply only suction valve spring complete all as specified & directed.
14Supply only snap ring for liner complete all as specified & directed.
15Supply only pin & spring for valve lifter complete all as specified & directed.
16Supply only shaft seal cover plate complete all as specified & directed.
17Supply only shaft key complete all as specified & directed.
18Supply only relief valve complete all as specified & directed.
19Supply only oil screen package complete all as specified & directed.
20Supply only unloader power assembly complete all as specified & directed.
21Supply only pump package, bushing, oil pressor regulatorcomplete all as specified & directed.
22Supply only hydraulic relay and magnetic plugcomplete all as specified & directed.
23Supply only cylinder linercomplete all as specified & directed.
24Supply only suction and discharge shut off valve complete all as specified & directed.
25Supply only bellow assembly complete all as specified & directed.
26Supply only external valve assembly complete all as specified & directed.
27Dismantling including taking down/out unserviceable Semi hermetic reciprocating type compressor capacity 30 TR Make Carrier Modal 06E-6299611 including opening complete unit,repairing the crank shaft, remetling, grinding, polishing, checking of cyclinder bore with and including replacement of unserviceable parts such as pistons set, connecting rod, shaft seal assembly, discharge/suction reeds, big end bearing, small end bush set, gasket packing etc and re-assembling of the complete compressor unit and testing etc complete all as specified & directed . Notes :-(i)The dismantling/taking out of old spare parts and fixing only of new spare parts deemed to be included in quoted rate however the supply only of new spare parts shall be measured and paid separately under BOQ item No. 2.01 to 2.09 here-in-after. These spare parts shall be of same make & model (i.e. make Carrier & model 06E-6299611) as existing at site or equivalent make & model as approved by GE. The spare parts shall be compatible for Semi hermetic reciprocating type compressor of 30 TR capacity. (ii)The draining out of compressor oil and filling with fresh oil included in quoted rates however the fresh compressor oil (if required) shall be measured and paid separately.
28Supply only Piston setwith Pin,liner, ring, sleeve complete all as specified & directed.
29Supply only Crank shaft complete all as specified & directed.
30Supply onlyOil Pump complete all as specified & directed.
31Supply onlymain bearing complete all as specified & directed.
32Supply only connecting rod with pin complete all as specified & directed.
33Supply onlyWall Plate complete all as specified & directed.
34Supply only Suction, Discharge, Oil Ring complete all as specified & directed.
35Supply only Suction & Discharge lead complete all as specified & directed.
36Supply onlyGasketcomplete all as specified & directed.
37M&L for carrying out the descaling of the shell & Tube condensers by isolation of each condenser by providing of dummy plate for inlet & outlet connection and separation of condenser from water circulation without disturbing the operation of the AC plant, carrying out the descaling by circulation of the diluted scale removing agent organic compound type chemical of RA III / chemtex Brand at the appropriate ratio depend upon the scale deposit inside copper tube by forced circulation and opening the end covers, manually brushing the copper tubes with nylon brushes of various size to remove complete scale, de-greasing with caustic soda solution and flushing out with fresh water, refixing all disconnected pipes lines, end covers with new rubber gasket and opening water line valves and checking of water leakages, apply grease to all M.S. Bolts & Nuts and put the condensers of capacity 12.5 TR to 20 TR in operational complete all as specified & directed.
38Description all as per BOQ item No. 3.00 here-in-before but capacity 21 TR to 30 TR
39M&L fordismantling and overhauling ofcondenser/Chiller/hot water pump set of capacity 10 HP, dismantling pump and motor separately, cutting the burnt out winding from slots and rewinding the same by existing size and gauge of super enamalled copper wire including varnishing, heating, repairing the insulating materials, repalcing bearings, bushes and remetalling the shaft including necessary heat treatment ,and repairing the pump , including replacing the gland packing , bearingsand all rustednuts and bolts, washersand remetaling the Impeller of suitable size and bore for lifting the water from sourceand reassembling the motor and pump with gland packing includings painting of pump amd motor assembly complete with two coats ofsuper enameled paints over & including one coats of red oxide primer,fixing the motor & pump at its position and connecting the suction and delivery water pipe and testing under working conditions, complete all as specified anddirected.
40Description all as per BOQ item No. 5.00 here-in-before but capacity 7.5 HP
41Description all as per BOQ item No. 5.00 here-in-before but capacity 5.0 HP
42Description all as per BOQ item No. 5.00 here-in-before but capacity 3.0 HP
43Taking down carefully burnt out electric driven compressor motor 40 HP capacity after disconnecting main electic supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for repairing, taking out burnt coils from the slots of stator, other accessories such as ball beaing, rotor, cleaning the stator slots and rewinding the same with new super enameled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor, refixing to original position after repairing from workshop, reinstalllation on existing channel and reconnection to electric supply, commissioning and testing complete all as specified & directed.
44Description all as per BOQ item No. 9.00 here-in-before but 30 HP capacity.
45Taking down carefullyburnt out electric driven AHU blower motor 10 HP capacity after disconnecting main electric supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for repairing, taking out, burnt, coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the same with new supper enameled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixing to original position after, repairing from workshop, reinstallation on existing channel and reconnecfting to electric supply, commissioning and testing complete all as specified & directed.
46Description all as per BOQ item No.11.00 here-in-before but 7.5 HP capacity.
47Description all as per BOQ item No.11.00 here-in-before but 5 HP capacity.
48Description all as per BOQ item No.11.00 here-in-before but 3 HP capacity.
49Taking down carefully brunt out electric driven cooling tower motor 5 HP capacity after disconnecting main electric supply from the motor starter panel, dismantling motor carefully for checking, removing to workshop for reparing, taking out brunt coils from the slots of stator, other accessories such as ball bearing, rotor, cleaning the stator slots and rewinding the samewith new supper enameled copper winding wire, heating, varnishing, re-assembling the same after greasing the ball bearing motor refixing to original position after repairing from workshop, reinstallation of existing channel and reconnecting to electric supply, commissioning and testing complete all as specified & directed .
50Description all as per BOQ item No.15.00 here-in-before but 3 HP capacity.
51Dismantling ,taking down/out and opening of monoblock centrifugal pump set , capacity 3 HP to 10 HP ,of any make / type,at any location, for repairs , including cleaning , descaling , greasing , oiling and overhauling, replacement of gland packing, bush, ball bearing with & including by providing new one, re-assembling and installing the pump set at original location after testing complete all as specified & directed.
52M&L for cleaning & servicing of FRP cooling tower of central type AC plant of capacity 25 TR to 100 TR, removal of water tray, pipe line and cleaning of cooling tower fins by using brush complete all as specified & directed.
53Pressure testing / leak arresting , vaccuming with dry nitrogen gas at the maximum pressure of 300 PSIto 400 PSI/ oil charging, including replacing the unserviceable strainersall as required and testing complete for the Central type AC plant of capacity 12.5 TR to 30 TR atvarious locations/buildings oftechnical area complete all as specified & directed. Note :-(i) Refregerant Gas R-22/407/410 and strainers shall be measured and paid seperately (ii) The Nitrogen gas pressure should not be less then 350 PSI during leak arresting of the plants and it will hold the same pressure upto 24 hoursand vaccum pressure should not be less then (-30 micron Pressure) during the vaccumingof plants.
54M&L for leak testing of AHU unit cooling/heatingcoil ofAC plant after pumping down the complete system, isolating the cooling coilfrom both ends and charging the dry nitrogen gas for pressure leak test, after detecting leak point, release the nitrogen gas, repairing the leak point by means of soldering/brazing and connecting the cooling coil with system, vaccumised the complete system and recharging the system by refrigerant, testing and commissioning upto satisfactory cooling performance of the plant complete all as specified & directed.
55M&L in replacement Humidistat including electrical connection complete all as specified & directed.
56M&L in replacement heater strip type 3kilowatt capacity as per existing size complete all as specified & directed.
57M&L in replacement heater 2/3kilowatt capacity for pan type humidifier and hot water generator as per existing size & model complete all as specified & directed.
58M&L for servicing ofpan type humidifier floor mounted/ installed at duct of capacity 6/12kilowatt including cleaning of tank,checking of all inlet & outlet connection, checking and repair of all electrical controlconnectionsand making the pan type humidifier functional including replacement of minor parts as required at site complete all as specified & directed .
59S&Fscroll type compressor sealed unit , three phase, 415 volt,12.5 TR capacity suitable for package type AC plant including taking down/out old compressor as existing at site complete all as specified & directed.
60Taking down defective compressor sealed unit 8.5 TR capacity, 3 phase 415 volt split pagage/ductable type AC unit after disconnecting all electrical connections and replacing the same with new compressor of same capacity including flushing the old gas and recharging with appropriate quantity of refrigerant gas complete all as specified & directed.
61Taking down defective compressor sealed unit 5.5 TR capacity, 3 phase 415 volt split pagage/ductable type AC unit after disconnecting all electrical connections and replacing the same with new compressor of same capacity including flushing the old gas and recharging with appropriate quantity of refrigerant gas complete all as specified & directed.
62Taking down defective compressor sealed unit 4.5 TR capacity, 3 phase 415 volt split pagage/ductable type AC unit after disconnecting all electrical connections and replacing the same with new compressor of same capacity including flushing the old gas and recharging with appropriate quantity of refrigerant gas complete all as specified & directed. Note for item No. 26.00 & 28.00:- Purchase vouchers and gurantee of two years of compressor from the original manufactuers/authorised dealers shall be obtained andsubmitted by the contractor while claming payment of compressors.
63Servicing of AHU complete of various capacities including cooling coil, heating coil filters,removing dirt, scales etc with cleaning chemicals (coil cleaner) complete all as specified & directed.
64Servicing of blower indoor unit of package/ductable type AC plant of capacity of each unit 4.5 TR to 22 TR with solvent material by using pressure water pump, servicing fan motor complete and painting with one coats of enamel paint on outer body complete all as specified & directed.
65Servicing of condensor unit including cleaning of condensor coil with and fins with solvent material by using pressure water pump, servicing fan motor compolete and painting with one coats of enamel paint on outer body complete all as specified & directed.
66Pressure testing / leak arresting , vaccuming with dry nitrogen gas at the maximum pressure of 300 PSI to 400 PSI/ oil charging, including replacing the unserviceable strainersall as required and testing complete for the Package type AC plant of capacity 4.5 TR to 22 TR at any location/building oftechnical area complete all as specified & directed. Note :-(i) Refregerant Gas R-22/407/410/403 will be measured and paid seperately (ii) The Nitrogen gas pressure should not be less then 350 PSI during Leak arresting of the plants and it will hold the same pressure upto 24 hoursand vaccum pressure should not be less then (-30 micron Pressure) during the vaccumingof plants.
67Supply onlyrefrigerernt M-22 gas (MEFRON)in 61 Kg company sealed cylinder complete complete all as specified & directed.
68Supply onlyrefrigerernt R-407C gas in 61 Kg company sealed cylinder complete complete all as specified & directed.
69Supply onlynitrogen gas in 25 Kg company sealed cylinder complete complete all as specified & directed. Notes for item No 34.00 to 36.00 :- (i)Gas shall be brought by the contractor at site from authorised dealer/ manufacturer company in sealed cylinder of standard packing with test certificate and purchase vouchers and charging shall be done through OEM only. (ii)The empty cylinder after use shall be returned to the contractor.
70M&L for spraypainting to Central Air Conditioningplant of any capacity including completecompressor, motor, condenser refrigerant pipe, water pipe line,AHU, cooling tower, LT panel board complete plant with two coat of synthetic enamelled paint including preparation ofsurfaces and as per approved colour code complete all as specified & directed.
71Servicing of electric control panel/compressor control pannel board by taking out the burnt wire. Supply & fixing new wireof existing specification with clipping and socketing and dressing properly complete all as specified & directed.
72M&L in repair insulation of MS Pipe 40mm diawith PUF slab 25 mm thick including applying bituminuous/CPRX compound and Aluminium claddingsheet of 26 gauge complete all as specified & directed.
73Description all as per BOQ item No. 38.00 here-in-above but MS pipe 32mm dia.
74Description all as per BOQ item No. 38.00 here-in-above but MS pipe 65mm dia.
75Description all as per BOQ item No. 38.00 here-in-above but MS pipe 100mm dia.
76S&F insulation to duct glass wool wrapped with chicken wiremesh and hassian cloth with and including providing 50 mm thick plastering in cement mortar 1: 2 , welding, grinding etc and cleaning the welded portioncomplete all as specified & directed.
77S&F in replacement rotational moulded polyethene HDPE tank of capacity 2000 ltrs triple layer of white colour, for use as makeup water tank for cooling Tower (cylindrical vertical with closed top) hoisted and fixed in position of made on iron frame / faricated works including fitting complete all as specified & directed.
78Description all as per BOQ item No. 43.00 here-in-above but capacity 500 ltrs.
79S&F in repair liquid line drier suitable for Voltas/Bluestar/Carrier AC plant with & including necessary sealing gasket/neoprene gasket/ring as per existing model complete all as specified & directed.
80S&F in repair entering water temperature (EWT) sensor as per existing model & make complete all as specified & directed.
81S&F in repairleaving water temperature (LWT) sensor as per existing model & make complete all as specified & directed.
82S&F in replacement PVC fills of size 450mm x 300mm x 150mm sutaible for any type of cooling tower of central air conditioning plant complete all as specified & directed.
83Repair/Servicing of electric hot water generatorof capacity 25 TR to 60 TR andreplacement of defected parts & rewiring ofgenerators by proper connection using thimble, connector and replacement of unserviceable accessories refixing the all items complete all specified & directed. Note :- (i) The quoted rate shall be deemed to include for the cost of minor parts required for making the generators fully functional and only heating element if required shall be measured and paid separately.
84Supply, fixing & testing single phase preventer VSP2/VSP1 having auxiliary supply 415 Volts Bimetal thermal over load relay various ranges starting from 3 Amps to 15 Amps including taking down old one as exist at site complete all as specified & directed.
85S&F in replacement Electronic timer star Delta, 240-415volt, timing 3-120secondas per existing make & model complete all as specified & directed.
86S&F in repair MVPD , range 30-220Amps, auxilary supply230volt AC for AC Plant complete as per existing make & model complete all as specified & directed.
87S&F in repair of Microprocessor controller based operating control board including display,step down transformer & sensor suitable for Model No.WCUR0350MN of Make Voltascomplete all as specified & directed.
88S&F in repair of Microprocessor controller based operating control board including display,step down transformer & sensor suitable for Model No. 30HRC085 ofMake Carriercomplete all as specified & directed.
89S&F in repair of PCB controller including display,step down transformer & sensorsuitable for Model No. XWC2S-026A of Make Bluestar complete all as specified & directed.
90S&F in repair of PCB controller including display,step down transformer & sensorsuitable for Model No. DPUAS055Y ofMakeVoltas complete all as specified & directed.
91S&F in repair of PCB controller including display,step dowm transformer & sensorsuitable for Model No. DPA 1052R1 of MakeBluestar complete all as specified & directed.
92S&F in repair of PCB controller including display,step down transformer & sensorsuitable for Model No. WCUS1-015 of MakeBluestar complete all as specified & directed.
93S&F in repair power contactor 4 polefor AC circuit with AC Coils voltage 220-240volt incluover load relay 16Ampscomplete as per existing make & model complete all as specified & directed.
94S&F in repair power contactor 3 pole MLI-5for AC circuit with AC Coils voltage 240/250volt including over load relay 25Ampscomplete as per existing make & model complete all as specified & directed.
95S&F in repair power contactor 4 polefor AC circuit with AC Coils voltage 220-240volt ,over load relay 32-40Ampscomplete as per existing make & model complete all as specified & directed.
96S&F in repair Safety valve 300 PSI of copper material suitable for 25 TR to 100 TR capacity Central/package type AC plant as per existing make and model complete all as specified & directed.
97S&F in repair HP/LP control switch as per existing make and model complete all as specified & directed.
98S&F in repair thermometer suitable for chilled and condenser water pipe line complete allas per existing make and model complete all as specified & directed.
99S&F in repair Pressure transistor sensor for suction, discharge & oilcomplete allas per existing make and model complete all as specified & directed.
100S&F in repair Pressure gauge suitable for chilled and condenser water pipe line complete allas per existing make and model complete all as specified & directed.
101S&F cooling tower fan motor of capacity 3HP, 3 Phase, 440 Volts and 50/60hertz and not less than 960 RPM suitable for any type and made of cooling tower, including all accessories like nuts, bults washer and clamps etc including taking down old unserviceable existing one and all as specified & directed.
102Supply and fixing in repair cooling Tower aluminium fan blades 1200 mm dia with coupling hub suitable for existing (set of four blades) existing Shape , size and modelsuitable for 3 HP CT fan Motorand upto 70 TR capacity Cooling tower and all as specified & directed.
103Supply, fabrication and fixing of MS angle /MS plate/flat/rod for cooling tower frame, CT fan base, cooling tower ladders,and all supports made out of suitable size along with welding/MS nuts,bolts and washers, hinges,locking arrangement including painting with two coats of synthetic enamel paint over & including one coat of red oxide primer including dismantling ofexisting unserviceable rusted one, all as specified & directed.
104S&F in repair AHU filter suitable for AHU of size (610mm X 610mm X 50mm)as per existing size, make and model complete all as specified & directed.
105S&F in repair AHU filter suitable for AHU of size (305mm X 610mm X 50mm)as per existing size, make and model complete all as specified & directed.
106Taking out the blower motor& shaft from the AC plant of capacity 5 TR to 22 TR , rewinding, welding and grinding on lathe machine to make suitable alignment with bearing and refixing on same position complete all as specified & directed.
107S&F in repair Runner of blower drum for package unit of AC plant of capacity 4.5 TR to 22TRcomplete all as specified & directed.
108S&F in repair fan blade suitable for air cooled condensor of AC plant of capacity 4.5 to 22TRcomplete all as specified & directed.
109S&F in repair Timer of AC plant of capacity 4.5 TR to 22 TR complete all as specified & directed.
110S&F in repair bearing of blower motor suitable for package units of AC plant of capacity 4.5 TR to 22 TR complete all as specified & directed.
111S&F in repair connector 36ampto 40amp, 440 Volt TP & TPN complete all as specified & directed.
112Servicing andMaintenance including minorrepairs and making in serviceable condition of the central type AC Plants of 9TR to 100TR capacity comprising of all minorparts and machineries including charging of R - 410/407/22 Gas and when ever required repair and maintenance of compressor and chiller, blower motorAir filters de-humidifying coils LT control pannels , PCB,ducts and accessories of all gauges and meters and keeping in perfect working condition complete all as specified & directed. Note : RefrigerantGaswill be measured and paid seperately.
113Servicing andMaintenance including minorrepairs and making in serviceable condition of the package type AC Plants of 5TR to 22TR capacity comprising of all minorparts and machineries including charging of R - 410/407/22 Gas and when ever required repair and maint of compressor and blower motorAir filters de-humidifying coils lt control pannels , PCB,ducts and accessories of all gauges and meters and keeping in perfect working condition complete all as specified & directed Note : Refrigerant gas will be measured & paid seperately.
114Supply and Charging Lubricating Oil for scroll type compressor with refrigerant R407 Mineral oil 160P complete all as specified & directed.
115Supply and Charging Lubricating Oil for scroll type compressor with refrigerant R22 Mineral oil 160P complete all as specified & directed.
116Supply and Charging Lubricating Oil for bearing, blower motor and outdoor motor complete all as specified & directed.
117S&F in repair non ReturningValve of brass seat of 80 mm dia PN-1.0 including gasket, nut bolts washers and connected accessories for proper fixing and complete all as specified & directed.
118S&F in repair cast iron butterfly valve of 80 mm dia valve PN-1.0 with SG Iron spindle and Bush of SS-410,with handle for manual operation including gasket, nut bolts and connected accessories,for proper fixing and complete all as specified & directed.
119S&F in repair cast iron butterfly valve of 65 mm dia valve PN-1.0 with SG Iron spindle and Bush of SS-410, including gasket, nut bolts and connected accessories for proper fixing and complete all as specified & directed.
120S&F in repair cast iron balancingvalve of 65/80 mm pipe size for balancing of chilled water/ condenser water pipe line dia valve PN-1.0 including gasket, nut bolts and connected accessories for proper fixing and complete all as specified & directed.
121S&F in repair water flow switch for connection to chilled & condenser waterpipe line as per existing make & modelcomplete all as per specified & directed.
122Supply, Installation, commissiong and testing for sprinkler assembly with branch pipe PVCsuitable for FRP cooling tower capacity 25TR to 60TR including taking down existing one complete all as specified & directed.
123S&F in repair digital clock temperature & humidity measuurer complete all as specified & directed.
124S&F in repairsLEDindication Lamps for R,Y,B Phase in LT panel boards/ feeder pillar boxes including disconnecting and removing existing defective item from electric circuit including necessary connected fastners, burnt cables,accessories etc all as per site requirement and as per existing make/model complete all as specified & directed.
125S&F in repairs Push Button Switches (Red and Green in Colour) in LT panel boards/ feeder pillar boxes including disconnecting and removing existing defective item from electric circuit including necessary connected fastners, burnt cables,accessories etc all as per site requirement and as per existing make/model complete all as specified & directed.
126S&F in repairs selector Switch 3 way ON-OFF 415volt in LT panel boards/ feeder pillar boxes including disconnecting and removing existing defective item from electric circuit including necessary connected fastners, burnt cables,accessories etc all as per site requirement and as per existing make/model complete all as specified & directed.
127S&F in repairAmmemeter analog type rangeabove 100Amp below 300Amp in LT panel boards/ feeder pillar boxes including disconnecting and removing existing defective item from electric circuit including necessary connected fastners, burnt cables,accessories etc,.all as per site requirement and as perexisting make/model complete all as specified & directed.
128S&F in repair voltmeter Analog type rangeupto 600Voltsin LT panel boards/ feeder pillar boxes including disconnecting and removing existing defective item from electric circuit including necessary connected fastners, burnt cables,accessories etc,.all as per site requirement and as per existing make/model complete all as specified & directed.
129S&F in repairAir sensorfor package type AC plant of 5.0/9.0/11.0/17.0/22 TR capacity, suitable for Blue Star/Voltas AC plant complete all as specified & directed.
130S&F in repaircoil sensorfor package type AC plant of 5.0/9.0/11.0/17.0/22 TR capacity, suitable for Blue Star/Voltas AC plant complete all as specified & directed.
131S&F in repairfan capacitor of 10 + 2% mfd capacity suitable for out door unit ofpackage type AC plant of 5.5/7.5/11.0 TR capacity, suitable for Blue Star/Voltas AC plant complete all as specified & directed.
132S&F in repair 4 core 35sqmm multistrand copper conductor, PVC insulated, sheathed, flexible cable suitable for connection of package/centraltype AC plant complete all specified & directed.
133Description all as per BOQ item No. 98.00 here-in-above but 4 core 25sqmm.
134Description all as per BOQ item No. 98.00 here-in-above but 4 core 10sqmm.
135Description all as per BOQ item No. 98.00 here-in-above but 4 core 6sqmm.
136Description all as per BOQ item No. 98.00 here-in-above but 4 core 4sqmm.
137S&F in repair MCB TPN 63 Amps, "C" series, 10KAfor connection of package/centraltype AC plantcomplete all as specified & directed.
138S&F in repair MCB TPN 40 Amps, "C" series, 10KAfor connection of package/centraltype AC plant complete all as specified & directed.
139S&F in repair MCB TPN 20 Amps, "C" series, 10KAfor connection of package/centraltype AC plant complete all as specified & directed.
140S&F in repair MCB SPN 40 Amps, "C" series, 10KAfor connection of package/centraltype AC plant complete all as specified & directed.
141S&F in repair MCB SPN 32 Amps, "C" series, 10KAfor connection of package/centraltype AC plant complete all as specified & directed.
142S&F in replacement V beltas perexistingsize & model complete all as specified & directed.
143M&L in replacement Canvas cloths heavy dutyof package/central type AC plantsincluding provision of zip 150mm lenth for opening and closing arrangements and properlly fasterners with bolts and nuts between the ducts and dumpers of the plants completeall as specified & directed.
144S&F in repair Actuator with smoke & fire sensor for fixing in existing fire damper as per existing make & model complete all as specified & directed.
145S&F in replacement GI tubing 40mm bore medium grade with all fittings laid in trenches, floor, roof and wall and tank connectioncomplete including cutting and threading with all fittings like tee, elbow bendunion reducer hex nipple complete all as specified & directed.
146Description all as per BOQ item No. 111.00 here-in-above but GI tubing 32mm bore.
147Description all as per BOQ item No. 111.00 here-in-above but GI tubing 25mm bore.
148Description all as per BOQ item No. 111.00 here-in-above but GI tubing 20mm bore.
149S&F in repairs gun metalgate valve 40mm bore,ISI marked with iron wheel head, screwed both ends for iron pipe complete all as specified & directed.
150Description all as per BOQ item No. 115.00 here-in-above but gate valve 32mm bore.
151Description all as per BOQ item No. 115.00 here-in-above but gate valve 25mm bore.
152Description all as per BOQ item No. 115.00 here-in-above but gate valve 20mm bore.
153S&F in repair PVC Ball valve suitable to fix 40mm bore pipe,ISI marked,high presssure of PTMT with epoxy coated aluminium rod and high density plastic ball screwed for iron pipe and fixed complete all as specified & directed.
154Description all as per BOQ item No. 119.00 here-in-above but 25mm bore pipe.
155Description all as per BOQ item No. 119.00 here-in-above but 20mm bore pipe.
156S&F in replacement solonoid valve, capacity 9TR to 25TR as per existing size & model complete all as specified & directed.
157S&F in replacement solonoid valve, capacity 26TR to 60TR as per existing size & model complete all as specified & directed.
158S&F in replacement expansion valve suitable for 9TR to 25TR as per existing size & model complete all as specified & directed.
159S&F in replacement expansion valve suitable for 26TR to 60TR as per existing size & model complete all as specified & directed.
160S&F in repair power contractor 4 pole for AC circuit with AC Coils voltage 220-240Volt, over load relay 63 Amps complete as per existing make & model complete all as specified & directed.
161S&Fin repair MCB TP 16 Amps, "C" series, 10KA for connecting of package/central type AC plant complete all as specified & directed.
162S&Fin repair MCCB 4 pole 63 Amps, 25KA with adjustable thermal & fixed magnetic setting Ics = 100% of Icu complete all as specified & directed.
163S&Fin repair MCCB 4 pole 100 Amps, 25KA with adjustable thermal & fixed magnetic setting Ics = 100% of Icu complete all as specified & directed.
164S&Fin repair MCCB 4 pole 160 Amps, 25KA with adjustable thermal & fixed magnetic setting Ics = 100% of Icu complete all as specified & directed.
165S&Fin repair MCCB 4 pole 200 Amps, 25KA with adjustable thermal & fixed magnetic setting Ics = 100% of Icu complete all as specified & directed.
166S&Fin repair MCCB 4 pole 250 Amps, 36KA with adjustable thermal & fixed magnetic setting Ics = 100% of Icu complete all as specified & directed.
167S&Fin repair MCCB 4 pole 315/320 Amps, 36KA with adjustable thermal & fixed magnetic setting Ics = 100% of Icu complete all as specified & directed.
168Comprehensive maintenance of Laundry Plant with following laundry equipments : Washing machine capacity 50-60Kg - 02 Nos., Hydro extractor capacity 25Kg - 02 Nos., Drying tumbler capacity 50-60Kg - 02 Nos., Autoclave machine Capacity 25Kg - 01 No.complete all as specified & directed. Notes:- (i)The Plant Maintenance includes complete maintenance of existing plants by regular and systematically examining for smooth and efficient funtioning of the plants.The contractor shall provide skill trademen with helper to attend to the plant for any problems with the Laundry plant during 0600 to 1800 Hrs as directed. The same shall be rectified within 8 Hours failing which a penalty of Rs 600.00 Per day shall be imposed and no payment of work done shall be measured during the period when plant is not workable. (ii) The rates include for replacement of spares in plant if required to be replaced during fortnightly maintenance. (iii) Contractor shall arrange to attendthe plant for any problems with the laundry through OEM only. (iv) The above Maintenace shall be carried out through M/s Spectrum Laundry Equipment Company or M/s Fabtech Engineering or equivalent company. The requisite agreement in this regard shall be produced to GE. (vi) Replacement of all major/minor defective/spares parts if damaged during AMC period and maintenace items required during AMC period are deemed to be included in the above rate.
169Taking out rusted side cover sheet and replacement with new PGI 2mm thick including fabricating as per existing size 87cm X 72cm and shape complete all as specified & directed.
170Taking out rusted side cover sheet and replacement with new PGI 2mm thick including fabricating as per existing size 69cm X 91cm and shape complete all as specified & directed.
171Preparation of existing painted surface of washing machine and tumbler applying putty, rubbing with Amery paper and paintingwith spray painting with approved colour of synthetic enamel paint over & including one coat of primer red oxide complete all as specified & directed.
172S&F in repair of 44 TR HMl Scroll Chiller display including controller, step down transformer & sensor suitable for Model & Make of Voltas as existing at site complete all as specified & directed.
173For Credit Schedule, refer tender documents. The amount of credit schedule shall be deducted from total quoted amount of BOQ to arrive contract sum.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail