Delhi Jal Board-DJB has published Tender For Repairing Of L&T Make Apfc Panel At G.K. (North) Bps Ac-50.. Submission Date for this Tender is 07-03-2023. Connectors Supply Tenders in Delhi Delhi. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Shunt capacitors power 3 phase,415V AC 50Hz MPP type heavy duty Make:- L&T |
2 | ADD on Block 2No+2NC Make L&T |
3 | Automatic power factor correction 415V digital type with display of power factor Make: L&T |
4 | MCCB 63Amp. 3poleMake L&T |
5 | MCCB 160Amp.3polewith spreader Make: L&T |
6 | MCB 32Amp. TP Make: L&T |
7 | Power contactor 220V AC 40Amp Make: L&T |
8 | Power contactor 220V AC 50Amp Make: L&T |
9 | Power contactor 220V AC 110Amp Make: L&T |
10 | Indicating lights R.Y.B. 415VMake:-L&T |
11 | Copper flexible cable 25 sq mm |
12 | Sensing current transformer of suitable ratio of incomer for current sensing |
13 | Static capacitorpanel across transformer Shunt capacitors power 3 phase,415V AC 50Hz MPP type heavy duty 80Kvar in sheet steel enclosure 2mm having incomer MCCB & out going MCB of suitable rating in 4 steps , indicating light as required components |
14 | Dismantling of the damaged components ofAPFC panel ,removing of damaged control wiring, cleaning of the complete panel with CTO at site |
15 | Fixing of all switchgears i.e.Relay ,contactor, MCCB, capacitors Fuse base & HRC fuse links & base, in their respective chamber duly wired, tapping, thumbling, ferruling ,Sensing current Transformer and connection with main bus barin outgoing &incoming part with complete control wiring in existing APFC panels |
16 | Making change over system for working the APFC panel on both incomer by providing & fixing of summation CT with complete wiring & connection |
17 | Insulation on bus bar with heat shrinkable PVC sleeve in complete panel with required hard wares and support insulator |
18 | Servicing /cleaning of complete incomer ACB and changing of damaged contacts, control wiring etc. |
19 | Fitting, installation of static capacitor panel including cable connection, thimbling. |
20 | Testing& commissioning of the existing APFC Panel & all installed components in APFC panel and setting of APFC relay to get proper power factor with proper testing equipments at site at NO LOAD & ON LOAD along with engineer in charge |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy