| 1 | MATERIALS |
| 2 | Aerial Bunched Cable LT 3x70 + 1x50 + 1x16 sq.mm (Insulated Messenger) |
| 3 | FUSE UNIT 415 V 100 A PORCELAIN |
| 4 | Crimping Socket Palm Type 70 Sq.mm -Al (Cable Lug) |
| 5 | Cable Tie UV Plastic Heavy Duty 250 mm Length |
| 6 | End Cap for ABC 16 Sq mm |
| 7 | Stainless Steel Buckle Slot width 20.5 mm x 1.5mm,Thickness 1.2 mm. |
| 8 | Anchoring /Dead end Clamp Assembly for LT AB Cables up to 70 sq.mm |
| 9 | End Cap for ABC 70 Sq mm |
| 10 | Stainless Steel Strap [20 mm x 0.7 mm] |
| 11 | Suspension Clamp Assembly for LT AB Cables up to 70 sq.mm |
| 12 | Pre-Insulated Midspan Joints and Terminal Lugs 70 Sq.mm |
| 13 | Pre-Insulated Midspan Joints and Terminal Lugs 16 Sq.mm |
| 14 | Stainless Steel Strap 20 mm x0.7 mm |
| 15 | Insulation Piercing Connector- Main: 16 sq mm to 95 sq mm; Tap : 16 sq mm to 95 sqmm |
| 16 | Insulation Piercing Connector- Main: 16 sq mm to 95 sq mm; Tap : 1.5 sq mm to 16 sq mm |
| 17 | Earthing set (spiral) |
| 18 | Satellite connector – Main : 16 sq mm to 95 sq mm; Tap :1.5 sq mm to 35 sq mm (4 way) |
| 19 | LABOURS |
| 20 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 21 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 22 | Providing Cable Tie |
| 23 | Erection of Anchor clamp / dead end clamp suitable for LT AB cable with SS strap assembly@ 2 nos at each location |
| 24 | Providing End Caps |
| 25 | Erection of suspension clamp suitable for LT AB cable with SS strap assembly |
| 26 | Installation of Pre-insulated straight through joints for 70sqmm cable |
| 27 | Installation of Pre-insulated straight through joints for 16sqmm cable |
| 28 | Providing insulation piercing connectors |
| 29 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 30 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 31 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 32 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 33 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 34 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 35 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 36 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 37 | Providing Stay for LT poles incl. digging & back filling pit. |
| 38 | Renewal of existing damaged/broken old LT stay with existing stay rod. |
| 39 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 40 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |