Water Resources Department-WRD has published Tender For Repair Maintenance Greasing To Movable Components, Rubber Seal Changing Renovation Of Electrical System And Painting Of 13 Numbers Of Motor Operated Rope Drum Vertical Gates Of Padma Anicut Project In Sorada Block Of Bhanjanagar Irrigation. Submission Date for this Tender is 13-03-2023. Seals Tenders in Ganjam Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply of bought out materials for Greasing and maintenance of all movable parts/ components of Hoisting System along with adjustment of turnbuckle for proper rope tension and smearing of rope by cadmium compound including cost of labour, tools, tackles, machineries, consumables, other T & P materials as per instruction of Engineer-In-Chargeincludingcontractor profit@7.5%,over head@2% and labour cess@1%. |
2 | Renovation of electrical components which includes - Supply of bought out materials such as Ball bearing of motor capacity 3HP to 3.5HP, Electrical panel box, Cable from generator room to control panel, Single core Flexible copper wire for wiring GI perforated cables trace, Double compressor flame proof 50 sq.mm brass gland, Ring type log for cable along with labour charges towards dismantling of old damaged panel box, cables, bearing of motor and labour charges towards fitting/ fixing/laying of bearings, new electrical components, panel board, cables from Generator room to control panelas per direction by the Engineer-in-chargeincludingcontractor profit@7.5%,over head@2% and labour cess@1%. |
3 | Supply, fabrication & erection of 15 Nos. of MS cover box for motor, 13 Nos. of cover box for rope drum,MS angle for supporting cover box & chequered plate for platformtotal weight of approximately 11418.21Kg complete in all respect as per direction by Engineer-in-charge includingcontractor profit@7.5%,over head@2% and labour cess@1%. |
4 | Charges towards painting of all exposed surface of the Hoisting Platform, walkway, trestle structurehaving total area of approximately 4045.38 sqm by applying of one coat primer of 40 micron thick & three coats of final paint of 100 micron each including cost of paint, surface preparation, tools and tackles, consumables and labourwith lead and liftin all respect as per direction of the Engineer-in-charge including contractor profit@7.5%, over head@2%and labour cess@1%. |
5 | Charges towards removal of old rubber side seal and bottom seal, supply of bought out materials such as new single music note rubber seal of 50 dia x100mm width and bottom seal Flat type of 100 mm width and 15mm thick, hex bolts and nuts, fixing of seals properly, supply, fabrication and erection of seal base plates and seal clamp plate of 12mm thick having total weight of approximately 439.8744Kg of each gatein complete shape as per direction of the Engineer-in-charge including contractor profit@7.5%, over head@2%and labour cess@1%. , supply, fabrication and erection of 12 mm thick of MS flat for mounting of rubber seal, 12 mm thick of MS flat clamp plate, flat type 100mm X 15mmbottom rubber seal confirming to IS:11855, single music type 50mm Side Seal confirming to IS:11855, Hexagonal nut & bolt etc. of total weight of approximately 439.8744Kg in all respect as per direction by the Engineer-in-charge including contractor profit@7.5%, over head@2%.and labour cess@1%. |
6 | Charges towards painting of gates which includes a)Labour cost towards surface cleaning by sand blasting as per specification, painting of all gates having total area of approximately 1452.24sqm. b) Cost of paint material for applying 1 coat epoxy primer of 40 micron, epoxy paints 2 coats 100 micron each c) Cost towards tools, tackels, consumables etcin all respect as per direction by the Engineer-in-charge. : including contractor profit@7.5%, over head@2%.and labour cess@1% |
7 | Cost towards supply and repairing of Hand drive unit such as wheel,sprocket,chain,dog clutch and hand lever for 13 No.of gates and cost towards supply of 8 Nos of sperical roller bearing along with cost of Labour charges for fitting of bearings in all respect as per the direction of Engineer-in-charge including contractor profit@7.5%, over head@2%and labour cess@1%. |
8 | Charges towards transportation of bought out materials, machineries, consumables, tool tackles for the work of a)Change of Rubber seals b)Renovation of electrial components c)Painting of gate and hoist d)Supply of machines cover for drum gear box etc. e)Greasing of all movable components etc. from work shop to work site (198 km approximately). |