Tender For Minor Repair Of Departmental Building At Kavaratti -Taking Out Doors, Windows And Clerestory Window Shutters ( Steel Or Wood ) Including Stacking Within 50 Metres Lead Including Cost Of All Labour Charges, Mionor Tools Etc. Complete. 2 Dismantling Of Damaged Brick Work, Rcc, Pcc Etc.And Disposing Of The Unserviceable Materials Within A Lead Of 300 Mtrs Including Cost Of All Labour Charges, Tools Etc.Complete. 3 Earth Work Excavation In All Soils And Filling In Foundation Etc. In 150 Mm Layers Including Cost Of All Labour Charges, Tools Etc. Complete. 4 Providing And Laying C.C. 1:2:4 Mix Using 20 Mm Granite Jelly For Cc Work Of Foundation Culvert Wall And Flooring Etc.Including Cost Of All Labour Charges, Tools But Excluding Cost Of Materials Etc.Complete. 5 Providing And Laying R.C.C.1:2:4 Mix Using 20 Mm Granite Jelly For Repair Works Of Cover Slab Of Soak Pit, Drainage Pit Etc. Including Cost Of All Labour Charges, Minor Tools, But Excluding Cost Of Materials Etc.Complete. 6 Providing Form Work For Rcc Worksincluding Cost Of All Labour Charges, Tools, Cost Of All Materials, Transportation Of Materials To The Work Site Within A Lead Of 3 Kmsetc. Complete. 7 Fabrication And Placing Of M.S. Rod Grills For The Rcc Works Including Cutting, Bending, Tying And Placing Cost Of Binding Wire Etc. Including Cost Of All Labour Charges, Tools, Cost Of All Steel Etc. Complete. 8 Brick Masonry In C.M.1:6 For Foundation & Basement Works Of Septic Tank, Wall And Windows Side Wall Including All Labour Charges, Minor Tools, Transportation Charges, Etc. But Excluding Cost Of Materials Etc. Complete. 9 Providing C.C. 1:2:4 For Floor At Work Area Including Cost Of All Labour Charges, Minor Tools, Sand And Jelly Transporatation Charges, But Excluding Cost Of Materials Shuttering Charges Etc., Complete. 10 Providing And Fixing Fully Glazed Windows With 10X8 Cm Size Frame And 4 Cm Thick Framed Shutters Single Hung Made Out Of Hard Wood Timber ( Karimaruthu / Irul ) Including Cost Of Sawn Timber, All Standard Fittings And Fixtures, Cost Of All Labour Charges, Cost Of Tools Etc. Complete. 11 Providing And Fixing Wash Basin Medium Type With All Fittings Single Hose For Pillow Cap With C For Ms Brackets Etc Including Cost Of All Materials And Labour Charges Etc. Complete. 12 Plastering With Cm 1:5, 12Mm Thick With One Cement, Four M Sandfor Exposed Masonry & Rcc Works Including Cost Of All Labour Charges, Transportation Charges, Minor Tools, But Excluding Cost Of Materials Etc.Complete. 13 Repairing Damaged Window Shutter By Providing Required Timber, Glass Panel, Hinges, Handle, Tower Bolt Etc Including Cost Of All Materials Andlabour Charges Etc.Complete. 14 Repairing Damaged Door Shutter As Per Direction Of Engineer In Charge By Providing Required Hinges, Handle, Tower Bolt Etc. Including Cost Of All Materials Andlabour Charges Etc.Complete. 15 Repairing Damaged Window Shutter By Providing Required Hinges, Handle, Tower Bolt Etc. Including Cost Of All Materials Andlabour Charges Etc.Complete. 16 Steel Fabrication For Roof Truss Gindal Or Equivalent Type Coated Tubes / Sections In Various Sizes, Including Cutting, Hoisting.Fixing In Position Applying One Primer Coat Followed By Two Coats Of Paints And Welded With Bolts And Nuts Etc, Including Cost Of All Labour Charges Minor Tools, Transportation, Fixing Charges, Cost Of All Materials Etc., Complete. 17 Providing G.I. Coated Corrugated Sheet 05 Mm Thick For Roofing For Old Office Building Roof With Hooks, Bolts & Nuts.Self Drilling, Tapping Screws Etc, Including Cost Of All Labour Charges Minor Tools, Scaffolding, Cost Of Materials Etc, But Excluding Cost Of Purline, Rafters, Trusses Fabrication Which Will Be Paid Seperatly.