}

Carrying Out The Electrification Work Against Sanctioned Package No. 23, 25, 26, 27, 28 &29/2022-23 Under Deposit Head In The Area Of Eudd-Iii, Aligarh, aligarh-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited has published Carrying Out The Electrification Work Against Sanctioned Package No. 23, 25, 26, 27, 28 &29/2022-23 Under Deposit Head In The Area Of Eudd-Iii, Aligarh. Submission Date for this Tender is 01-03-2023. Clamps Tenders in aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

36436002
Carrying Out The Electrification Work Against Sanctioned Package No. 23, 25, 26, 27, 28 &29/2022-23 Under Deposit Head In The Area Of Eudd-Iii, Aligarh
Tender
Indian
Uttar Pradesh
Aligarh
01-03-2023

Tender Details

Carrying Out The Electrification Work Against Sanctioned Package No. 23, 25, 26, 27, 28 &29 / 2022-23 Under Deposit Head In The Area Of Eudd-Iii, Aligarh- 1 Safe Carriage Of Following S.T Poles / Pcc Poles From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Repective Ends. 2 11 Mtrs. Long S.T.Pole 3 9 Mtrs. Long S.T.Pole 4 8.5 Mtrs. Long Pcc Pole 5 Erection & Grouting Of 11 Mtrs. St Double Pole Including Fixing Complete Ht / Lt Fitting As Per Resspo Manual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. 6 Erection Of Following Single Support Including Fixing Complete Ht / Lt Fittings As Per Resspo Munual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. 7 11.0 Mtrs. Long S.T. Pole 8 9 Mtrs. Long S.T.Pole 9 8.5 Mtrs. Long Pcc Pole 10 Erection & Grouting Of 11 Mtrs. St Double Pole Including Fixing Complete Ht / Lt Fitting As Per Resspo Manual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. 11 11.0 Mtrs. Long S.T. Pole 12 9 Mtrs. Long S.T.Pole 13 8.5 Mtrs. Long Pcc Pole 14 Laying Sagging Stringing And Binding Of Acsr Dog Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 15 Laying Sagging Stringing And Binding Of Acsr Weasel Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 16 Laying Spreading, Lifting And Final Sagging Of Aerial Bunched Cable Size3x50+1X35+1X16 Sq.Mm. Including Fixing Of All Accessories As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. : 17 Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work As Per Resspo Manual. 18 Fixing & Connecting Of Earthing Rods As Per Resspo Manual Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 19 Fixing Of Lt Distribution Box Including Making Connections Of Distribution Box With Lt Mains By Piercing Clamps For Aerial Bunched Cable.The Work Will Also Include The Opening Of The Service Connection Of The Consumer And Its Connecting In Distribution Box. 20 Safe Carriage Of 25 Kva Distribution Transformer Fromelectricity Store Centre, Aligarh Or From Any Other Place To The Respective Site Of Work Including Loading & Unloading At The Respective Ends And Mounting On Double Pole Including Proper Jumpering From 11 Kv Line To The Transformer And Also Connecting The Lt Site Cables As Per Resspo Manual. 21 Fabrication Of T-Off Channel As Per Resspo Norms. 22 Fabrication Of Top Channel As Per Resspo Norms. 23 Fabrication Of Dropper Channel As Per Resspo Norms. 24 Fabrication Of F Braket As Per Resspo Norms. 25 Fabrication Of V-Type Cross Arm S Per Resspo Norms. 26 Safe Carriage Of 11 Kv Xlpe Cable 3X120 Sq.Mm. From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Respective Ends. 27 Laying Of 11 Kv Xlpe Cable 3X120 Sq.Mm. Including Making Proper Connections At Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 28 Safe Carriage Of 11 Kv Xlpe Cable 3X70 Sq.Mm. From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Respective Ends. 29 Laying Of 11 Kv Xlpe Cable 3X70 Sq.Mm. Including Making Proper Connections At Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. 30 Providing 3X70sq.Mm. 11 Kv Cable Jointing Kit Size 3X120sq.Mm. ( O / D & I / D ) And Its Filling As Per Resspo Norms. 31 Providing 3X70sq.Mm. 11 Kv Cable Jointing Kit Size 3X70sq.Mm. ( O / D & I / D ) And Its Filling As Per Resspo Norms.

Key Value

Document Fees
INR 1180 /-
EMD
INR 5000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail