| 1 | Binding wire |
| 2 | Portland Cement |
| 3 | Cleat angles |
| 4 | Labour charges for lifting and placing in position and making connection at 7% on Material |
| 5 | Brass stop cock |
| 6 | Add Cement sand and grit 1% on Material |
| 7 | Add watering charges at 1 % on Material |
| 8 | Table moulded bricks of class designation 50( non modular ) |
| 9 | Granite/trap broken metal 100 mm and down size |
| 10 | Size stone 20 x 20 x 25 cms |
| 11 | 5mm PVC sheet |
| 12 | Ceramic tiles of size 30 x 30 cms |
| 13 | C.I manhole cover with frame |
| 14 | White glazed/viterous china clay 10lts low lwvwl flushingcistern, with fittings and brackets and 40 mm white C.P. flush pipe |
| 15 | Transportation/loading and unloading of material/lifting of material/centering charges wherever necessary /Over head/Wastage/Unforeseen charges/Miscellaneous which are necessary during execution. |
| 16 | Add White lead paint, gasket, cement, sand for making good the wall and floor at 2% on Material |
| 17 | Solvent cement adhesive |
| 18 | Fabricator |
| 19 | European type water classet of specific make |
| 20 | Add sundries charges at 1 % on Material |
| 21 | Silver oak or equivalent planks 38 mm thick |
| 22 | White cement |
| 23 | Add watering charges at 1 % on Labour |
| 24 | water proofing cement paint |
| 25 | Foreman Grade 1 |
| 26 | Granite metal 20 mm |
| 27 | Add Brush, putty, sand paper at 2% on cost of paint |
| 28 | Coarse sand (zone III) |
| 29 | Add Handling , loading and unloading at 1% on Material |
| 30 | G.I. Overflow pipe 20mm dia |
| 31 | Add Tools Transportation and machinaries 1% on Material |
| 32 | PVC beading |
| 33 | C.I. / M.S. brackets for flushing cistern |
| 34 | Mathi/Nandi wood planks for panels 25 mm thick |
| 35 | Rubble stones |
| 36 | Add Handling , loading and unloading at 2% on Material |
| 37 | Bond stone 20 x 20 x 45 cm |
| 38 | Mild Steel 6 mm dia |
| 39 | Plasticizer / super plasticizer |
| 40 | HOM of Machinaries for planing |
| 41 | Licenced Plumber with tools |
| 42 | Mason Class I (with tools) |
| 43 | Boulders |
| 44 | Handling loading and unloading 3% on Material |
| 45 | Whitening |
| 46 | Black plastic seat with lid as specified |
| 47 | Broken stone aggregate 40 mm size |
| 48 | Mixer (concrete small used in culvert) |
| 49 | Add sundries charges at 1 % on Labour |
| 50 | TMT bars Fe 500 |
| 51 | Chrominum plated screws |
| 52 | Granite metal 40 mm |
| 53 | Alluminium handles - 15 mm |
| 54 | Vitrified tiles 600x600 mm |
| 55 | Copper plated brass piller tap 15mm |
| 56 | Mason Class II (with tools) |
| 57 | Add cutting and other wastage 5% |
| 58 | Mathi/Nandi wood scantling |
| 59 | Add |
| 60 | Dry distemper |
| 61 | MS Tube |
| 62 | Add 15% wastage for glass |
| 63 | HOM of Vibrator 0.71 days |
| 64 | Plumber |
| 65 | Broken stone aggregate 20 mm size |
| 66 | Add sundries charges at 2 % on Material |
| 67 | Aluminium window frame section 1.20 mm thick |
| 68 | CP brass chain with plug |
| 69 | Add Brush, putty, glue at 5% on cost of paint |
| 70 | Add providing and removing scaffolding at 3% on Labour |
| 71 | Polyenthylene water storage tank of specified capacity L |
| 72 | Casurina Poles 75 - 100 mm dia |
| 73 | Casurina poles 100 - 150 mm |
| 74 | Burnt bricks class 35 (non modular) |
| 75 | Lime |
| 76 | Lead or PVC connection pipe 32mm dia (for wash basin) |
| 77 | Cost of centering at 1% on material |
| 78 | CP brass waste 32 mm of standard pattern |
| 79 | Painter Class I |
| 80 | Alluminium tower bolt - 20 cm |
| 81 | Broken stone aggregate 12 mm to 10 mm size |
| 82 | Mixer (concrete) - 1 cum Capacity |
| 83 | 5.50 mm Thick plain glass |
| 84 | White vitreous china clay flat back wash basin size 630x450mm |
| 85 | Rubber beading for shutters beading |
| 86 | Add HOM of welding and grinding machine @ 2% on Material |
| 87 | Polyethylene pipes high density 32 mm dia external dia |
| 88 | Unit Cost as per the Specification |
| 89 | Nylon rollers |
| 90 | Mosquito proof coupling 25mm |