Uttarakhand Power Corporation Limited-UPCL has published Repair Of Electricity Lines And Transformers Damaged In Natural Disaster In Between 07.10.2022 To 10.10.2022 At Kanarichina, Takula, Barechina Section Of Edsd 2Nd, Almora. Submission Date for this Tender is 15-03-2023. Transformer Supply Tenders in Bageshwar Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Top Channel Clamp SP 23 with N&B |
2 | Stay Clamp S/E Sp 23 with N&B |
3 | Top Bracing set Clamp for Sp23 with N&B |
4 | Bottom Bracing set Clamp for Sp23 with N&B |
5 | LT Shackle Insulator with N&B |
6 | LT Clamp for SP-21 with N&B |
7 | LT Stay Clamp for SP-21 with N&B |
8 | LT Clamp for SP-10 with N&B |
9 | LT Stay Clamp for SP-10 with N&B |
10 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 50 KmST pole SP 23 (bottomPortion hot Dip) |
11 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 50 Km ST pole SP 21 (bottomPortion hot Dip) |
12 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 50 Km ST pole SP 10 (bottomPortion hot Dip) |
13 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 50 Km 11/0.4 KV 25 KVA New |
14 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 50 Km 11/0.4 KV 63 KVA New |
15 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 50 Km Small materials |
16 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 23 (bottomPortion hot Dip) |
17 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 21 (bottomPortion hot Dip) |
18 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km ST pole SP 10 (bottomPortion hot Dip) |
19 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km 11/0.4 KV 25 KVA New (Upto 1 to 3 Km) |
20 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km 11/0.4 KV 63 KVA New (upto 0 to 1 Km) |
21 | Head load cartage of following materials from Dump store to pit site ava. Lead distance 3 Km Small materials (upto 1 to 3 Km) |
22 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorSingle Pole SP 10 |
23 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorSingle Pole SP 21 |
24 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorSingle Pole SP 23 |
25 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorDouble Pole Sp 23 |
26 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor11 KV ACSR weasel |
27 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorLT 3 PH 4 wire Weasel / AB cable |
28 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductorLT 1 PH 2 Wire Weasel / AB Cable |
29 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor11/0.4 KV 25 KVA New |
30 | Dismentling of Existing LT/HT line including Disc Fitting, Insulator, clamp, Nut bolt Etc. Including rolling of conductor11/0.4 KV 63 KVA New |
31 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 23 pole |
32 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 21 pole |
33 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 10 pole |
34 | Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr |
35 | Erection of Double Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23. |
36 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23. |
37 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21 |
38 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-10 |
39 | Grouting of pole in size 0.45x0.45x1/9 of the support in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual (mid span new pole) ST Pole SP-10(0.178) |
40 | Grouting of pole in size 0.45x0.45x1/9 of the support in cc ratio 1;4:8 block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction manual (mid span new pole) ST Pole SP-21(0.190) |
41 | Muffing of poles size 0.45x0.60 cm radious with cc 1:3:6 block size 45 cm height from ground level including cost of cement, stone and sand etc. |
42 | Fixing, tightening and nozzaling of stay with pole as per RESPO |
43 | Fabrication of Cross Arm with cutting of MS Channel/MS Angle making proper hole as per norms complete |
44 | Looping Chooping and cutting of tree which fallen on line |
45 | Laying, Re stringing and Resagging of 11 KV line in Weasel Conductor Complete including Fixing of all accessories including Binding and Jumpering as per RESPO (1ph or 3 Ph) |
46 | Laying, Resagging & Restringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing LT 3 PH 4 wire Weasel / AB cable |
47 | Laying, Resagging & Restringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing LT 1 PH 2 Wire Weasel / AB Cable |
48 | Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 11/0.4 KV 25 KVA New |
49 | Installation/mounting of new T/F in DP structure with fixing of angle/channel and making all HT& LT connections and its complete comissioning 11/0.4 KV 63 KVA New |
50 | Head load cartage of following materials from pit site to Dump store ava. Lead distance 3 Km 11/0.4 KV 25 KVA New (Upto 1 to 3 Km) |
51 | Head load cartage of following materials from pit site to Dump store ava. Lead distance 3 Km 11/0.4 KV 63 KVA New (upto 0 to 1 Km) |
52 | Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 60 Km 11/0.4 KV 25 KVA New |
53 | Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 60 Km 11/0.4 KV 63 KVA New |
54 | Motarable cartage of Material from road side dump store to Almora Including Loading & Un-loading both End.Dist 60 Km MS Scrap |