|
| 1 | Maintenance of domestic and protected water supply daily to the Power House and Camp premisesand gardening and allied worksin all applicable days including all T& P\"s and safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., |
| 2 | Cleaning the toilet & utilities including toilet floor area in Power House, office and dispensary building including safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc.,but excluding cost of T&P and consumbales. |
| 3 | Sweeping and cleaning the open space in the Power house, Camp and Office areas once in a week as directed by the engineer in charge including all lead, lift etc complete.clear away the debris from the location includingsafety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., but excluding cost of T&P and consumbales. |
| 4 | Sweeping and cleaning entire floor area inside the Power house, Office areas daily exceptHolydays as directed by the engineer in charge including all lead, lift etc complete and clear away the debris from the location includingsafety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., complete. but excluding cost of T&P and consumbales. |
| 5 | Mopping and cleaning inside the power house tiled floor area in Control roomlabour, lead, lift etc., complete.but excluding cost of T&P and consumbales. |
| 6 | Thorough Cleaning of cobweb and dirts on the walls inside and ceiling of PH building once in two month as directed by the Engineer in charge etc., including safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., complete, but excluding cost of T&P and consumbales. |
| 7 | Cleaning of open drain in Power House, Office(once in a month) and Camp area ( once in a week) etc, and clearing away the debris from the location including safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc.,complete., but excluding cost of T&P and consumbales. |
| 8 | Cleaning ofground level water tanks and over head water tanks by removing and placing in position of cover slabs and through cleaning of inner wall surfaces using bleaching powder etc.,once in a month as directed by the Engineer in charge etc., complete including all safety appliances as required.but excluding cost of T&P and consumbales. |
| 9 | Cleaning of silt traps with inspection chamber/man holes clear away the debris from the location including safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., complete.( 4 Operations per year) but excluding cost of T&P and consumbales. |
| 10 | Cleaning of sewer line including removing the block wherever required and clear away the debrisfrom the location including all safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc.,complete but excluding cost of T&P and consumbales. |
| 11 | Attending Masonry work / carpentry works including all safety appliances such as helmet, facemask, ear plugs, gloves, shoes required etc., |
| 12 | Supplying and servicing with materials such as Filters, Chemicals, Membrane to 500LPHRO plant for supplying protected water to PH and camp areas including running cost of all materials, service charges etc., complete. 5 micron x 20\" PP Filter |
| 13 | Supplying and servicing with materials such as Filters, Chemicals, Membrane to 500LPHRO plant for supplying protected water to PH and camp areas including running cost of all materials, service charges etc., complete. 5 micron x 20\" PP spun Filter |
| 14 | Wash chemical |
| 15 | Membrane 4040 |
| 16 | Supplying and servicing with materials such as Filters, Chemicals, Membrane to 12LPHRO plant for supplying protected water to PH including running cost of all materials, service charges etc., complete 5 micron x 10\" PP Filter - |
| 17 | Carbon filter per year |
| 18 | Membrane per year |
| 19 | Pump |
| 20 | Adaptor |