Indian Oil Corporation Limited-IOCL has published Tender For Annual Rate Contract For Maintenance Of Fire And Safety Equipment At Srpl Chennai Pump Station, Manali. Submission Date for this Tender is 01-03-2023. Safety Equipment Tenders in Chennai Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 23-Feb-2023 | Date Corrigendum -I | Date | 01-03-2023 |
Sl. No. | Item Description |
1 | ARC for Maintenance of F&S Equipment |
2 | Maintenance and Inspection of DCP and CO2 Fire Extinguishers which includes Checking the Weight of Cartridge, Condition of Threads o f Cap, Discharge Tube, Sharpness of Piercing Pin and Cylinder Body, Refilling of DCP (supplied by Owner) if required and Submission of Reports |
3 | 9 kg DCP Extinguisher |
4 | 75 kg DCP Extinguisher |
5 | 2 Kg Clean Agent Extinguisher |
6 | 2 kg CO2 Extinguisher |
7 | 4.5 kg CO2 Extinguisher |
8 | 6.5 kg CO2 Extinguisher |
9 | 9 kg CO2 Extinguisher |
10 | Maintenance of Fire Hydrant, Water and Foam Monitors which includes Greasing and Servicing of Valves, Oiling of lugs,Inspection ofPick Up Tubes and Submission of Reports |
11 | Fire Water Header Valves |
12 | Fire Water Hydrant Valves |
13 | Foam, Water Monitor Valves |
14 | Supply of CO2 and Refilling of CO2 gas in Cartidges for using in 10 kg/9 kg DCP Extinguishers including all and labour, transportati on etc. complete as per specification and direction of EIC/SiteEngineer Note : CO2 Cartridge of 200 g |
15 | Supply of Clean Agent and Refilling in Clean Agent Extinguisher |
16 | Hydrostatic Testing, Inspection of Safety Valve, and Refilling of High Pressure Cylinder through CCoE Approved Party (as applicable)and Charging upto required Pressure including taking Delivery of the Cylinder from the Station and returning the same, inclusive ofall labour material, transportation and all the other incidental expenses (The Cylinder is to be returned to the Station within 15 days from the date of receiving from the Station) and Submission of Reports and Test Certificates. |
17 | 9 kg DCP Extinguisher |
18 | 75 kg DCP Extinguisher |
19 | 2 Kg Clean Agent Extinguisher |
20 | 2 kg CO2 Extinguisher |
21 | 4.5 kg CO2 Extinguisher |
22 | 6.5 kg CO2 Extinguisher |
23 | 9 kg CO2 Extinguisher |
24 | Hydrostatic Testing of Fire Hoses |
25 | Hydrotesting and Refilling of Breathing Apparatus Set Cylinder from CCoE Approved Vendor and Filling with Dry Compressed Air up to aPressure of 200/300 bar as per direction of EIC, inclusive of transportation, handling charges complete in all respect, (Cylinders to be returned to Station in 20 days from date of despatch/handing over) Submission of Reports and Test Certificates. |
26 | Hydrotest of Breathing Apparatus |
27 | Refilling as per the Statutory Norms |
28 | Service Assistance in Checking the UV/ IR Flame Detectors provided in Pump Shed by using Intrinsically Safe UV/IR Flame Torch (suppl ied by Owner) in every Quarter inclusive of necessary tools, tackles, labour charges etc. and Submission of Reports. (Rate Per Pump Shed) (Flame Detectors - CTMPL Pump Shed - 06 Nos ; CBPL Pump Shed - 10 Nos; ATFPL Pump Shed - 8 Nos) |
29 | CTMPL Pump Shed |
30 | ATFPL Pump Shed |
31 | CBPL Pump Shed |
32 | Service Assistance in Checking of Rate of Rise Heat Detectors installed in Pump Sheds by using Heat Gun (supplied by Owner) in each Quarter inclusive of labours tools tackles and Submission of Reports. (Rate Per Pump Shed) (Heat Detectors - CTMPL Pump Shed - 06 No s ; CBPL Pump Shed - 10 Nos; ATFPL Pump Shed - 10 Nos) |
33 | CTMPL Pump Shed |
34 | ATFPL Pump Shed |
35 | CBPL Pump Shed |
36 | Checking of MCPs, Heat and Smoke Detectors (Multi-Sensor Detector) installed in Control Building, MCC Rooms, Cable Trenches in Stati on using Heat Gun and Aerosol (supplied by Owner) in each Quarter inclusive of labours tools tackles and Submission of Reports (MCPs- 7 Nos; MSD - 146 Nos) |
37 | Carrying out Surface Preparation by hand tool cleaning confirming to St 2 Standard and Painting Extinguishers/Hydrants with one coatof Red Oxide Primer and two coats of Fire Red Synthetic Enamel Paint, Hose Boxes, Monitor and Hydrant Outlets shall be painted withtwo coats of Luminous Yellow Synthetic Enamelinstead of Fire Red, including all consumables, tools, tackles etc. Prior to Paintin g old stickers to be removed and surface preparation to be done by Contractor at his own cost. Subsequent to Painting, Stickers to b e pasted back and numbers and/or letters to be re-written by the Contractor at his own cost. |
38 | 9 Kg DCP Extinguisher |
39 | 75 Kg DCP Extinguisher |
40 | 2 Kg Clean Agent Fire Extinguisher |
41 | 2 Kg CO2 Extinguisher |
42 | 4.5 Kg CO2 Extinguisher |
43 | 6.5 Kg CO2 Extinguisher |
44 | 9 Kg CO2 Extinguisher |
45 | Fire Water Hydrant |
46 | Water / Foam Monitor |
47 | Hose Boxes |
48 | Painting of Sand Buckets including Stand with one coat of RedOxide Primer and two coats of Synthetic Enamel Paint (Fire Red from out side and White from inside), writing letters on sand buckets complete in all respect including labour charges, material, removing ofold sand filling back the sand after painting etc. as per direction of EIC. |
49 | Maintenance of CO2 Flooding System at Station inclusive of transportation, handling charges complete in all respect.(Cylinders shallbe taken from the Station andbe returned to Station in 20 days from date of despatch/handing over) and Submission of Reports and Test Certificates. |
50 | Inspection and Maintenance of Complete System which includes Removal of Valve Leversfrom the CO2 Cylinders to prevent accidental release of CO2 gas. Visual Checking for defects of broken /missing parts, nozzle, loading, piping, CO2 level etc. Checking the Operation of Heat Detectors, Solenoid Valves and Manual Release Points. Greasing the Weighing Device of the Cylinder.Checking the Batteries of the Panelfor corrosion and renewed if necessary. Checking Fire Control Panelfor Alarm Persistance /Manual Actuation (by test gas), its power supply system, batteries etc. Checking the Operation of Audio Visual Alarm Devicesduring system operation. Cleaning the spray nozzles." |
51 | Hydrotesting 02 Nos N2 Cylinders each 3 L Water Capacity at 250 bar and Refilling the N2 Cylinders of Water Capacity 3 L at 150 bar as and when directed by Site Engineer and EICthrough CCoE Approved Party and Charging upto required pressure including taking deli very of the cylinder from the Station and returning the same inclusive of all labour material, transportation and all the other inci dental expenses and Submission of Reports and Test Certificates |
52 | Hydrotesting CO2 Cylinders each 68 L Water Capacity at 250 bar and Refilling the CO2 Cylinders of Water Capacity 68 L at 0.667 kg/L density at pressure 60 bar as and when directed by Site Engineer and EIC, through CCoE Approved Party and Charging upto required pre ssure including taking delivery of the Cylinder from the Station and returning the same inclusive of all labour material, transporta tion and all the other incidental expenses and Submission of Reports and Test Certificates |
53 | Maintenance and Inspection of DCP and CO2 Fire Extinguishers at RCP Locations which includes checking the Weight of Cylinder, Condit ion of Threads of Cap, Discharge Tube, Sharpness of Piercing Pin and Cylinder Body, Refilling of DCP (supplied by Owner) if requiredand Submission of Reports. Transportation of Manpower, Tools and Tackles is under the Scope of Contractor |
54 | 10 kg/9 Kg DCP Cylinder |
55 | 2 or 4.5 or 6.8 or 9 kg Carbon Dioxide Type Cylinder |
56 | Checking of MCPs, Heat and Smoke Detectors (Multi-Sensor Detector) installed in Control Building, MCC Rooms, Cable Trenches in each RCP using Heat Gun and Aerosol (supplied by Owner) in each Quarter inclusive of labours tools tackles, transportation and boarding c harges and other incidental expenses and Submission of Reports |
57 | Servicing, Load Test and Certification (Certification shall be obtained from an Authorized and Competent Person recognized by Govern ment of Tamil Nadu) as per direction of EIC, inclusive of transportation, handling charges complete in all respect, Submission of Re ports and Test Certificates |
58 | HOT Crane with 8 ton Chain Pulley Block-1 Nos HOT Crane with 5 ton Chain Pulley Block-1 Nos HOT Crane with 7.5 ton Chain Pulley Block-1 Nos Chain Pulley Block 1 ton - 1 Nos Chain Pulley Block 2 ton - 1 Nos 10 mm dia Steel Wire Rope Sling -750 Kg-1 Nos D Shackle - 5.0 ton - 1 Nos Circuit Breaker Lifter - 350 Kg - 2 Nos Full Body Harness - 2 Nos 2.0 T Nylon Flat Webbing Sling - 1 Nos" |
59 | MISCELLANEOUS SERVICES |
60 | Supply and Fitting of Blank Cap (as per IS 5290 , red colour with GI chain) suitable for 63 mm hydrant outlet as per direction of EI C |
61 | Repair of Adoptor Lug of Hydrant/Hose |
62 | Supply and Fitting of new Windsock (floroscent in two colour),Removing of old Wind sock, made out of Synthetic Cloth in Buildings, upto height of 10 M,/Evictee Wind sock should be made from strong and durableanticorrosive anti-agening polyurethane coating t o increase tear resistance. Warrenty of 12 Months shall be given as per direction of Site Engineer/ EIC. Approval to be obtained fro m EIC for Wind sock Prior to Supply and Installation |
63 | Supply and Erection of Stand Post for Wind sock in place of Damaged Stand Post (in case) as per instructions of EIC/Site Engineer in cluding tools and tackle , labour charges etc complete in all respect |
64 | Complete Overhauling of Hand Operated Siren including oiling, greasing, painting and testing as per direction of Site Engineer/EIC i nclusive all tools ,tackles etc. |
65 | Testing of AFFF as per BIS 4989:2018 or latest revision through NABL Accredited or Government Approved Laboratory including transpor tation, manpower and other incidental expenses complete in all respect and Submission of Reports |
66 | SPARES |
67 | Spares for 9 kg DCP Extinguisher along with Test Certificates |
68 | Discharge Hose with Nozzle; Hose shall not burst or show leakage before 50 kgf/cm2 |
69 | Safety Clip/Pin (Metal) with Nylon thread |
70 | DCP Extinguisher Cap Washer |
71 | Discharge Tube Washer |
72 | Spares for 75 kg DCP Extinguisher along with Test Certificates |
73 | Discharge Hose (6.5 m length) with shut off nozzle , Hose shall not burst or show leakage before 50 Kgf/cm2 |
74 | Trolley Wheel Size 12" * 2" * 1" |
75 | Spares for CO2 Fire Extinguishers along with Test Certificates |
76 | HDPE Discharge Horn for 4.5 Kg Capacity CO2 Extinguisher with fittings |
77 | HDPE Discharge Horn for 6.5 Kg Capacity CO2 Extinguisher with fittings |
78 | High Pressure Discharge Hose for 4.5 Kg CO2 Extinguisher with fittings |
79 | High Pressure Discharge Hose for 6.5 Kg CO2 Extinguisher with fittings |
80 | Trolley Wheel Set for 6.5 Kg CO2 Extinguisher along with handle complete with fittings |
81 | CO2 Valve Open Wheel |
82 | Safety Pin with Nylon String for CO2 Extinguisher |
83 | Spares for Fire Hydrant Valves, MCPs, Hose Boxes and Detectors |
84 | Supply and Fitting Fire Hydrant Disc Washer |
85 | Fire Hydrant/ Fire Hose Coupling Washer |
86 | Supply and Fitting of Rubber Beeding of the complete one hose box (bothdoors) as per direction of EIC including removing of worn outrubber beeding,labour charges, tools and tackles complete in all respect |
87 | Supply and Fitting of glass of Hose Box wherever required complete in all respect inclusive of material, labour,consumables etc.(Con sider Rate for One Door Glass Only) |
88 | Supply and Fitting of glass of Manual Call Points wherever required complete in all respect inclusive of material, labour,consumable s etc |
89 | Supply of Hammer for breaking glass of Manual Call Points / Hose Boxes / Emergency Tool Box |
90 | Fixing up of Clamps of Extinguisher in wall including supply of clamps, screws etc and drilling, fitting extinguisher to complete th e work in all respect as per direction of EIC / Site Engineer |
91 | Supply and Fitting of clamps for hanging 2 kgand 4.5 kg CO2 Extinguisher on wall including labour charges, tools, tackles and cons umables complete in all respect as per direction of EIC. |
92 | Supply of Fire Hydrant Spindle Assembly (Gun Metal) |
93 | Supply of PVC Pick Up tube for foam cum water monitors 4 M lengh as per sample |
94 | Supply of Steel Strainer of pick up tube of water cum foam monitor as per sample. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy