Urban Local Bodies has published Tender For Laying Water Distribution Rising Main Pipe Line For New Pump House At Ward No-05. Submission Date for this Tender is 18-02-2023. Rising Mains Tenders in habra West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost.Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion ......viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (i) Laying of pipe line including cost of pipe only excluding cost of specials/fittings & valvesf) 160 mm(OD) |
2 | h) 200 mm(OD) |
3 | Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in RCC cover slab with necessary opening for operation of valve all complete including cost of labour & materials as per Departmental Dwg. [Reinforcement type:- Other manufactuerers not specified] i) 80 mm to 150 mm dia pipe |
4 | i) 200 mm dia pipe Each |
5 | Making flange joint to CIDF pipe, specials, valves etc.with supply of necessary nuts and bolts, rubber insertion of 6kg/m2 (3mm gauge) and materials required including dewatering if any tools and plants, labour cost etc. as per specification and direction of EIC (Nut and bolts shall be of TATA/GKW make) fori) 150 mm dia |
6 | ii) 200 mm dia |
7 | Supply and delivery of CIDF sluice valve (Special type) PW-1.00 of different dia make with CI double flanged non rusting spindle sluice valves conforming to IS 14846 -2000 with latest emended having body dome/bonnet and cover of C.I.Gr-F.G 210mtr. spindle of IS-6603 G.R- 12/Gr-13 non-magnetic, nuts seat rings are of Gunonetal as per IS:318 LTB-2 flanges and drilled to IS:1538 Part IV & VI valves are suitable for max. working pressure of 10kg/cm2(seat test) and body tested to 15kg/cm2. a) 150 mm dia |
8 | b) 200 mm dia |
9 | Supply and delivery of C.I plain ended specials (Class-10) as per IS 5531/1988 including the cost of loading transportion unloading and stacking at site properlywith S.T all other taxes and charges all complete |
10 | Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3 , if contractor used water from deptt. source). B) For UPVC/HDPE Pipe f) 160mm dia (OD) |
11 | h) 200mm dia (OD) |
12 | Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source) B)For UPVC/HDPE Pipe f) 160mm dia (OD)) |
13 | h) 200mm dia (OD) |
14 | Add G.S.T @18% |
15 | Add Cess @ 1% |