Basis Semi Turnkey Deposit Work Village Barthari Under Edd Jhansi , Cartage Of Poles From Esc Store Centre Or From Any Other Place In There Rspective Site Of Work Including The Work Of Its Loading & Unloading. Note:- All Required Material To Be Supplied As Per Gtp Approved By Se Mm Dvvnl Agra. , Pcc Pole 8.5 Mtr. Long , St Pole 11 Mtr. Long , St Pole 13 Mtr. Long , Cartage Of Required Line Material From Store Center Or From Any Other Place To The Respective Site Of Work. Including The Work Of Loading & Unloading At The Respective Ends. , Carrige Of Following Capacity Transformer From Esc Store Center Hasari Or From Any Other Place To There Rspective Site Of Work Or Carriage Of Following Capacity Transformer From Resopective Site Of Work To Esc Store Center Hasari Or From Any Other Place Including The Work Of Its Loading & Unloading At Respoective Of Work. , 25 Kva Transformer. , 5 Mva Transformer ( Provided By The Department ) , Errection Work Of Line. , Erection And Grouting Of Single Support Pcc Pole 8.5 Mtr. Longincluding Complete H.T / L.T Fitting As Per Direction Ofengineer Incharge Including The Cost Of Labour , T&P, Etc. Required For Propoer Completion Of Work. , Erection And Grouting Of Single Support Pcc Pole 11 Mrt. Longincluding Complete H.T / L.T Fitting As Per Direction Ofengineer Incharge Including The Cost Of Labour , T&P, Etc. Required For Propoer Completion Of Work. , Erection And Grouting Of Single Support St Pole 13Mtr. Longincluding Complete H.T / L.T Fitting As Per Direction Ofengineer Incharge Including The Cost Of Labour, T&P, Etc. Required For Propoer Completion Of Work. , Erection And Grouting Of Double Support Pcc Pole 8.5 Mrt. Longincluding Complete H.T / L.T Fitting As Per Direction Ofengineer Incharge Including The Cost Of Labour, T&P, Etc. Required For Propoer Completion Of Work. , Erection And Grouting Of Double Support Pcc Pole 11 Mtr. Longincluding Complete H.T / L.T Fitting As Per Direction Ofengineer Incharge Including The Cost Of Labour , T&P, Etc. Required For Propoer Completion Of Work. , Erection And Grouting Of Tri Support St Pole 11 / 13Mtr. Longincluding Complete H.T / L.T Fitting As Per Direction Ofengineer Incharge Including The Cost Of Labour, T&P, Clamp, And Nut , Bolt Etc. Required For Propoer Completion Of Work. , Erection And Grouting Of Stay Including The Work Ofnozelling, Clamp Etc. As Per Respo Manual And As Per Direction Of Enginner Of Work. , Fixing Of Earthing Rod In H.T. / L.T Line For Pole Earthing Or 10 / 16 Kva T / F Structure As Per Respo Maual And As Per Direction Of Engineer Incharge. , Laying, Sagging. Striging And Binding And Jumpering Etc. Of H.T. / L.T Line By Weasel Conductor On Newly Erected Pole And Old Pole As Per Respo Maual And Including Costof Labour , Etc. , Weasel Conductor , Dog Conductor , Installation Of Extra T On The Erected Poles Wherever Required Along With All Fitting As Per Direction Of Engineer Incharge. , Installation Of Following Capacity Transformeron The On Single Pole / Double Pole / Plinth Structure In Proper Aligment And As Per Respo Manual Andincluding Costof Labour , Etc. , 25 Kva Transformer. , 5 Mva Transformer ( Provided By The Department ) , Guarding Of11kv Line At Road Crossingand Htline Inside Of Village By Laying Two Nos. G.I Wire Paraller And Fixing Of Lacing Till At A Distance At 2-3 Mtr. As Per Respo Manual And As Per Direction Of Engineer Incharge. , Laying Of 11 Kv Xlpe3x120 Cable As Per Respo Maual And Including Costof Labour , T & P. ( Includig Cost Of Sand & Bricks ) , Laying Of 11 Kv Xlpe3x185 Cable As Per Respo Maual And Including Costof Labour , T & P. ( Includig Cost Of Sand & Bricks ) , Fixing Of 11 Kv 3X120 I / D And O / D Cable Boxes , Fixing Of 11 Kv 3X185 I / D And O / D Cable Boxes , Carriage Of 11 Kv Metering Cubical Different Ratio , Instalation Of Ctpt Combind Unit , Instalation Of Pilfer Proof Metering Cubical , Nomber Marking On New Erected Pole . , Danger Board , Barbed Wire , Number Plate , Gi Pipe ( 8 Inch Dia 6 Mtr Length ) , Increasing Capacity Of Moth S / S For Terminal Gantry , Main Bus Bar Complete With Structure , 33 Kv Pin Insulator With Pin , 33 Kv Bus Isolater , Structure For 33 Kv Bus Isolater , 33 Kv Post Isolater , Structure For 33 Kv Post Isolater , 33 Kv Lightening Arresters , Strucure For 33 Kv Lightening Arresters , 5 Mva Transformer ( Provided By The Department ) , 90 Lbs Rail Pieces For Transformer , Plinth Of 5 Mva Transformer , 33 Kv Vcb With Single T / F Control Pannel & Ct 200 / 100 / 1A With Structure , 24 V Battery & Battery Charger With Cabinet , 600 / 300 / 5A 350 Mva I / C , Outgoing 200 / 100 / 5A ( With Spare ) , 300 Sqmm Xlpe Cable ( Double Circuit ) , Cable Box 3X300 Sqmm , 180 Sqmm Xlpe Cable ( Double Circuit ) , Cable Box 3X180 Sqmm , 11 Kv Cable Jointing Kit Outdoor 300 Sqmm , 4*2.5 Sqmm Control Cable , 2*2.5 Sqmm Control Cable , Earthing Of Outdoor Equipment ( Earth Met ) , Earthing Of Indoor Equipment , 25 Kva Transformer. , Cost Of Accessories For Mounting 25 Kva T / F , Painting Of S / S Structure , Sundry Store , Extension Of Control Room

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 07-Feb-2023 DateCorrigendum Date 14-02-2023
2 10-Feb-2023 Other Corrigendum Other 14-02-2023

Key Value

Document Fees
INR 5900 /-
EMD
INR 511805.0 /-
Tender Value
INR 5.11 Crore /-

BOQ Items

Name of Work :- lseh VuZdh ds vk/kkj ij iw.kZ tek ;kstuk ds en esa fo|qr forj.k [k.M] >kalh ds {ks=kUrxZRk fo|qr forj.k mi[k.M] eksaB esa 20 ux xzkeksa ds fo|qrhdj.k@{kerko`f) dk dk;ZA
Sl. No. Item Description
1Cartage of Poles from Esc store centre or from any other place in there rspective site of work including the work of its loading & unloading. NOTE:- All required material to be supplied as per GTP Approved by SE MM DVVNL AGRA.
2PCC Pole 8.5 Mtr. Long
3ST Pole 11 Mtr. Long
4ST Pole 13 Mtr. Long
5Cartage of required line material from store center or from any other place to the respective site of work. Including the work of loading & unloading at the respective ends.
6Carrige of following capacity Transformer from Esc store center Hasari or from any other place to there rspective site of work or carriage of following capacity Transformer from resopective site of work to Esc store center Hasari or from any other place including the work of its loading & unloading at respoective of work.
725 KVA Transformer.
85 MVA Transformer (Provided by the department)
9Errection work of Line.
10Erection and grouting of single support PCC pole 8.5 Mtr. Longincluding complete H.T/L.T fitting as per direction ofEngineer incharge including the cost of labour ,T&P, etc. required for propoer completion of work.
11Erection and grouting of single support PCC pole 11 Mrt. Longincluding complete H.T/L.T fitting as per direction ofEngineer incharge including the cost of labour ,T&P, etc. required for propoer completion of work.
12Erection and grouting of single support ST pole 13Mtr. Longincluding complete H.T/L.T fitting as per direction ofEngineer incharge including the cost of labour, T&P, etc. required for propoer completion of work.
13Erection and grouting of double support PCC pole 8.5 Mrt. Longincluding complete H.T/L.T fitting as per direction ofEngineer incharge including the cost of labour, T&P, etc. required for propoer completion of work.
14Erection and grouting of double support PCC pole 11 Mtr. Longincluding complete H.T/L.T fitting as per direction ofEngineer incharge including the cost of labour ,T&P, etc. required for propoer completion of work.
15Erection and grouting of Tri support ST pole 11/13Mtr. Longincluding complete H.T/L.T fitting as per direction ofEngineer incharge including the cost of labour, T&P, Clamp, and nut ,bolt etc. required for propoer completion of work.
16Erection and grouting of stay including the work ofnozelling, clamp etc. as per RESPO manual and as per direction of Enginner of work.
17Fixing of earthing rod in H.T./L.T Line for pole Earthing or 10/16 KVA T/F structure as per RESPO maual and as per direction of Engineer incharge.
18Laying, sagging. Striging and binding and jumpering etc. of H.T./L.T Line by weasel conductor on newly erected pole and Old pole as per RESPO maual and including costof labour , etc.
19Weasel Conductor
20Dog Conductor
21Installation of extra "T" on the erected poles wherever required along with all fitting as per direction of Engineer incharge.
22Installation of following capacity Transformeron the on Single Pole /double pole /plinth structure in proper aligment and as per RESPO manual andincluding costof labour , etc.
2325 KVA Transformer.
245 MVA Transformer (Provided by the department)
25Guarding of11KV line at road crossingand HTline inside of village by laying two nos. G.I wire paraller and fixing of lacing till at a distance at 2-3 Mtr. As per RESPO manual and as per direction of Engineer incharge.
26Laying of 11 KV XLPE3x120 cable as per RESPO maual and including costof labour ,T & P.(includig cost of Sand & Bricks)
27Laying of 11 KV XLPE3x185 cable as per RESPO maual and including costof labour ,T & P.(includig cost of Sand & Bricks)
28Fixing of 11 KV 3x120 I/D and O/D Cable Boxes
29Fixing of 11 KV 3x185 I/D and O/D Cable Boxes
30Carriage of 11 KV Metering cubical different Ratio
31Instalation of CTPT Combind Unit
32Instalation of Pilfer Proof Metering Cubical
33Nomber Marking on New erected pole .
34DANGER BOARD
35BARBED WIRE
36NUMBER PLATE
37GI Pipe(8 inch dia 6 Mtr length)
38Increasing capacity of moth s/s for Terminal Gantry
39Main bus bar complete with structure
4033 KV pin insulator with pin
4133 KV bus Isolater
42Structure for 33 KV bus Isolater
4333 KV Post Isolater
44Structure for 33 KV Post Isolater
4533 KV Lightening arresters
46Strucure for 33 KV Lightening arresters
475 MVA Transformer (Provided by the department)
4890 lbs rail pieces for transformer
49Plinth of 5 MVA Transformer
5033 KV VCB with single t/f control pannel & CT 200/100/1A with structure
5124 V battery & battery charger with cabinet
52600/300/5A 350 MVA I/C
53Outgoing 200/100/5A (with spare)
54300 sqmm XLPE Cable ( Double Circuit)
55Cable box 3x300 sqmm
56180 sqmm XLPE Cable ( Double Circuit)
57Cable box 3x180 sqmm
5811 KV cable jointing kit outdoor 300 sqmm
594*2.5 sqmm control cable
602*2.5 sqmm control cable
61Earthing of outdoor equipment (earth met)
62Earthing of indoor equipment
6325 KVA Transformer.
64Cost of accessories for mounting 25 KVA T/F
65Painting of S/S Structure
66Sundry store
67Extension of Control Room
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail