Supply And Fixing Of Play Equipment And Opn Gym At Different Park Lalsot , Providing And Fixing Of Double Seater Swing Having Safe Play Area -4 Mtr. X 2.5 Mtr. The Swing Required Total Area About 3 Mtr. X 1.5 Mtr. And Height Shall Be 2.4 Mtr. From Ground Level Top Bar Of Swing Is Made By 60Mm Idgi Pipe 16 Gauge And 4 Nos. Of Leg Support Pipe Should Be Made Of 60Mm Idgi Pipe 16 Gauge.Top Bar Shall Be Attached With 2 Nos. Of Alloy Steel Coating Bearings With Gi Chain. Seating Arrangement Of Swing Is Made Up Of 9Mm Thick Frp Sheet With Proper Finishing Work. Bearing Should Be Covered By Specially Design Nylon Clamp. The Pure Polyester Powder Coating Done On The Pipes To Extend The Life Of Equipments. Complete Set As Per Direction And Satisfaction Of Engineer In Charge. , Sitc Of Multi Seater See Saw For Which Required Safe Play Area Shall Be About 4Mtr X1.5Mtr The Height Of The Equipment Shall Be About 0.8Mtr.The Multi Seater See Saw Comprises Of 4 Nos. Frp Seats Having Thickness 4Mm With Proper Finishing And Paint Finished Work. The Leaverconsists Of 25Mm Idgi Pipe And 80Mm Idgi Powder Coated Pipe. The Stand For Equipment Is Made Of 50Mm Idgi Pipe With Powder Coating On Complete Surface. Complete Set As Per Direction And Satisfaction Of Engineer In Charge. , Providingand Fixing Of Frp Made Wave Slide Having Safe Play Area About 4.6Mtr X 0.9 Mtr. Thewave Slide Required Total Area 3.6 Mtr X 0.6 Mtr. Platform Height Shall Be 1.8 Mtr. From Ground Level Connected With Leg Support 60Mm Idgi Pipe And Ladder Should Be Made By Steel Frame Rectangular Square Pipe 50Mm X 25Mm. For Safety Purpose Railing Should Be Made By 25Mm Idgi Pipe Total Frp Slide Lengthshall Be 3 Mtr. With 5Mm Thickness Overall Both Side Finishing Work. All The Sharp Edges And Corners Are Properly Grinded To Give Smooth Finishing.The Pipes And Components Arepowder Coated On Surfaces. Slide Should Be Made In A Single Moulded Piece Having Wave Shape There Shall Be No Any Joint In The Slide. Frp Components Should Be Paint And Finished. Complete Set As Per Direction And Satisfaction Of Engineer In Charge. , Supply And Fixing Decorative Fiber Benches. Which Is Made By Cast Iron And Frp Sheet Plate. Bench Length 5 Feet Back Height 2’5” Front Height 16” Depth 15” And Bench Leg Is Made By Cast Iron. Including Bench Leg Earth Work And Concrete Foundation M-15 Grade Including All Material And Labor Charges. , Open Gym Surf Board Providing And Fixing Of Surf Board Of Size 910Mm ( Length ) X 860Mm ( Width ) X 1400Mm (Height ) Fabricated With A Center Pipe Of 100Mm Nominal Bore Shall Be Made From “C” Class G.I. Pipe. The Sleeve Pipe Shall Be Made Of 125Mm Od Seamless Pipe With Thickness Of 5Mm And Bolted To Main Frame With M1 Ss Bolts. The Bottom Support Shall Be Welded Of M.S. Plate Of Ø 250 Mm & 10 Mm Thickness. The Handle Frame Of 25Nb Shall Be Made From “C” Class G.I. Pipe. The Paddle Frame Of 50Nb Shall Be Made From “C” Class G.I. Pipe Supported With 70X8mm Bend M.S. Flat And Can Be Replaceable. The Foundation To Be Used For Fixing Should Be A Structure And Shall Be Made From Center Pipe Of G.I. Of 80Nb “C” Class Welded With M.S. Round Plate Of Ø250mm & 10Mm Thick. Main Pipe Shall Be Supported With 25 Mm X 25Mm M.S. Angles Of 3 Mm Thickness And 22 Mm X 40Mm Crc Square Pipes Of 3Mm Thickness. Bushes Shall Be Used Of 70 Mm Outer Diameter With5mm Thickness. The Footrests Shall Be Made From Aluminum Casting Material Of Size 320Mm X 270Mm X 5Mm. For Support To Footrest Of 200Mm X 250Mm With 3Mm Thickness M.S. Plate Shall Be Used. Closing Caps Shall Be Made Up Of High Quality Fiber Reinforced Plastic Material. The Pins To Be Used Shall Be Made Up Of Ø35 Mm Sae 8620 Bright Material. The Bearing Shall Be Used Are Of “6007Zz” Permanent Lubricatedsealed Bearing Of Reputed Brand (Skf/Fag). High Tensile Steel With Galvanized Nut Bolts Shall Be Used For Assembly. The Cerclips Shall Be Used For Assembly Of A34. The Powder Coating Shall Be Done With Pure Polyster Powder Of Ackzonoble Or Berger With 60 To 70 Micron Thickness, All Complete As Per Drawing, Design, Directions And Approval Of Engineer-In-Charge Regarding Material, Shape Of Equipment, Color Of Metal. , Cross Trainer Providing And Fixing Of Cross Trainer Of Size 1320Mm (Length) X 600 (Width) X 1750Mm. (Height) Fabricated With The Main Frame Pipes Of 80Nb Shall Be Made Of “C” Class G.I. And Pipe With Single Bend Pipe With 250Mm Radius. The Bottom Supported Of M.S. Round Plate-Of Ø250mm & 10Mm Thick. The Handle Frame Shall Be Made Up Of 25Nb “C” Class G.I. Pipe. The Foundation Should Be Used For Fixing Is A Structure And Shall Be Made From Center Pipe Of G.I. Pipe Of 80Nb “C” Class Welded With M.S. Round Plate Of Ø250mm & 10Mm Thick. Main Pipe Should Be Supported With 25 Mm X 25 Mm M.S. Angles Of 3 Mm Thickness And 20Mm X 40Mm And Crc Square Pipes Of 3 Mm Thickness. To Build Structure Bushes To Be Used Which Shall Be Made From M.S. Seamless Pipe Of 60 Mm Od With 5 Mm Thickness. The Footrests Shall Be Made From Aluminum Casting Material Of Size 130Mm X 310Mm X 5Mm Thickness And Mounted On M.S. Plate Of Diameter 35Mm, 25Mm And 17Mm Shall Be Made Up From Sae 8620 Bright. The Bearing Shall Be Used Of “6007Zz” & “6205Zz” Permanent Lubricated Sealed Bearing Of Reputed Brand (Skf/Fag). High Tensile Steel With Galvanizednuts And Bolts Shall Be Used For Assembly. The Powder Coating Shall Be Used For Assembly. Bolt M8x16 Mm And Ny Lock Nut Of M8 Shall Be Made Of Ss 304 Used On Nylon Cap Mounted On Pins To Protect Bearings And Pins From Rain And Dust, All Complete As Per Drawing, Design, Directions And Approval Of Engineer-In-Charge Regarding Material, Shape Of Equipment, Color. , Thi-Chi Spineer (2 Wheel) Providing And Fixing Of Thi-Chi-Spineer (2 Wheel) Of Size 700Mm (Length) X 1000Mm (Width) X 1280Mm (Height) Fabricated With A Center Pipeof 100Nb Shall Be Made Up Of “C” Class G.I. Pipe. The Handle Movement Round Frame Shall Be Made Up From 25Nb “C” Class G.I. Pipe. The Foundation Should Be Used For Fixing Is A Structure And Shall Be Made From Center Pipe Of G.I. Of 80Nb “C” Class, Welded With M.S. Round Plate Of Ø250mm & 10Mm Thick. Main Pipe Shall Be Supported With 25Mm X 25Mm M.S. Angles Of 3 Mm Thickness And 20Mm X 40Mm Crc Square Pipes Of 3Mm Thickness. Closing Caps Shall Be Made Up Of High Quality Fiber Reinforced Plastic Materials. The Pins To Be Used Shall Be Made Up Of Ø25mm Of Sae8620 Bright Material. The Bearing Shall Be Used Of “6205Zz” & “6205Zz” Permanentlubricated Sealed Bearing Of Reputed Brand (Skf/Fag). High Tensil S.S. Nut Boltsshalll Be Used For Assembly. Foundation Cover Closing Cap Shall Be Made From Frp Material With 0.7 Mm Thickness. The Cerclips Used For Assembly Shall Be Of A24 And A11. The Nylon Bush Shall Be Used For Handle Knob. The Powder Coating Shall Be Done With Pure Polyester Powders From Ackzonoble Of Berger Paints With 60 To 70 Micron Thickness. Bolt M8x16mm And Nylock Nut Of M8 Shall Be Made Of Ss 304 Used On Nylon Cap Mounted On Pins To Protect Bearings And Pins From Rain And Dust, All Complete As Per Drawing, Design, Directions And Approval Of Engineer-In-Charge Regarding Material, Shape Of Equipment, Color. , Seated Puller Providing And Fixing Of Seated Puller Of Size 1900Mm (Length) X 740Mm (Width) X 1920Mm (Height) Fabricated With A Center Pipe Is Of 100Nb Shall Be Made From “C” Class G.I. Pipe. Bottom Supported Of M.S. Round Plate Of Ø250 Mm & 10Mm Thickness Shall Be Welded. All Linkages Shall Be Made Up Of 25Nb “C” Class G.I. Pipe. The Handle Frame On 32Nb “C” Class G.I. Pipe. The Seat Frame Of 32Nb “C” Class G.I. Pipe, To Build Structure Bushes To Be Used Which Shall Be Made From Seamless Pipe Of 60Mm Od And 5Mm Thickness As Well As 60Mm Diameter Solid Bar Bush Shall Be Used. The Foundation Should Be Used For Fixing Is A Structure And Shall Be Made From Center Pipe Of G.I. Of80nb “C” Class Pipe Welded With M.S. Round Plate Of Ø250mm & 10Mm Thick. Main Pipe Shall Be Supported With 25Mm X 25Mm M.S. Angles Of 3Mm Thickness And 20Mmx 40 Mm Crc Square Pipes Of 3Mm Thickness. Foundation Cover Closing Cap Shall Be Made From Frp Material. The Seats And Back Rests To Be Fitted On The Outer Frames Shall Be Made Up Of M.S. Sheet Of Sizes 330Mm X 300Mm X 2 Mm Thickness And Deep Drawn And Pressed In Tools And Dies To Have Uniform Radius Of 20Mm With No Sharp Edged.Closing Caps Be Made Up Of High Quality Fiber Reinforced Plastic. , Sit Up Board Double Providing And Fixing Of Sit Up Board Double Of Sizes 1760Mm( Length) X 1140Mm (Width) X 660Mm ( Height) Fabricated With The Main Frame Of 25Mm Nb Shall Be Made From “C” G.I. Pipe. Frp Sheet Of 3Mm Thickness Shall Be Moulded On Main Frame. The Remaining Frame Of The Sit Up Board Of 32Mm Nb Shell Be Made From “C” Class G.I. Pipe. The Powder Coating Shell Be Done With Pure Polyester Powder Ackzonoble Or Berger Paints With 60 To 70 Micron Thickness. The Foundation Should Be Used For Fixing Is A Structure And Shell Be Made From Center Pipes Of G.I. Of 80Nb “C” Class Welded With M.S. Round Plate Of Ø250mm & 10Mm Thick. Main Pipe Shall Be Supported With 25Mm X 25Mmm.S. Angles Of 3Mm Thickness And 20Mm X 40Mm Crc Square Pipes Of 3Mm Thickness, All Complete Per Drawing , Design, Directions And Approvel Of Engineer-In-Charge Regarding Material, Shape Of Equipment, Color ( Of Metal, Seat And Pedal), And Fixing Of Equipment Etc. , Pommel Horse Providing And Fixing Of Pommel Horse Of Sizes 2150Mm ( Length) X 800Mm (Width) X 800Mm ( Height) Fabricated With The Main Frame Of 80Nb & 50Nb Shall Be Made From “C” Class G.I. Pipe. The Handle Frame Of 32Nb Shall Be Made From “C” Class G.I. Pipe. 40Mm X 40Mm Crc Square Pipes Frame Shall Be Plased On The 25Mm X 25Mm X3mm M.S. L Angle With 60 X 10M Thickness Flat Should Be Used For Support. Closing Caps Shall Be Made Up Of High Quality Fiber Reinforced Plastic Material. Hightensile Steel With Galvanized Nuts And Bolts Shall Be Used For Ammembly. The Powder Shell Be Done With Pure Polyester Powder Ackzonoble Or Berger Paintswith 60 To 70 Micron Thickness, All Complete As Per Drawing, Design, Directions And Approvel Of Engineer-In-Charge Regarding Material, Shape Of Equipment,Color ( Of Metal, Seat And Pedal ), And Fixing Of Equipment Etc. , Seating And Stainding Twister Providing And Fixing Ofseated & Stainding Twister Of Size 1700Mm( Length) X 540Mm (Width) X 1250Mm (Height) Fabricatied With A Center Pipe Of 100Mm Nb Shall Be Made From “C” Class G. I. Round Pipe. The M.S. Round Plate Ø250mm & 10Mm Thickness Shallbe Welded At Bottom. Handle And Bottom Sleeve Pipe Of 125Mm Od With Thickness 5Mm Should Be Provided Foreasy Assembly, Replacement And Maintenance. The Bottom Frame Of Seating And Staindingtwister Of 32 Nb, 50 Nb, & 25 Nb Shall Be Made From “C” Class G.I. Pipe.The Handle Frame Of Seating And Stainding Twister Of 25Nb And Foot Restingframe Of Seating Side Shall Be Made From “C” Class G.I. Of 25Mm Nb The Foundation Should Be Used For Fixing Is A Structure And Shall Be Made From Center Pipe Of G.I.Of 80Nb “C” Class, Welded With M.S. Round Plate Of Ø250mm & 10Mm Thick. Main Pipe Shall Be Supported With 25Mm X 25Mm M.S. Angles Of 3Mm Thickness And 20Mmx 40 Mm Crc Square Pipes Of 3Mm Thickness. The Twister Plate To Be Fitted On The Bottom Frame Shall Be Made Up M.S. Round Plate Of Size 300Mm Dia Meter And 10Mm Thickness. Closing Caps Shall Be Made Up Of High Quality Fiber Reinforced Plastic Material. The Pins To Be Used Be Shallbe Made Up Ofø35mm Sae 8620 Bright Material. The Bearingshall Be Made Of “6205Zz” Permanent Lubricated Sealed Bearing Reputed Brand (Skf/Fag). High Tensile Steel With Galvanized Nuts And Bolts Shall Be Used For Assembly. The Powder Coatingshall Be Done By Purepolyester Powder Of Berger Paint With 60 To 70 Micron Thickness All Complete As Per Drawing, Design, Directions And Approvel Of Engineer-In-Charge. , Push Up Bar .Dimensions :- 1220Mm ( Length) X 550Mm (Width) X 1700Mm ( Height) . Safe Area :- 2 Mtr. X 1 Mtr. Push Up Bar Equipment Made From “C” Class G.I. Pipe Of Different Nb. Nb Stands For Nominal Bore Sizes I.E. Internal Diameter Of Pipe In Milimeters. The Main Frame “C” Class G.I. Pipe. The M.S. Round Plate Of Ø250mm And 10Mm Thickness Is Welded At Bottom . The Handle Frame Of 25Nb Made From “C” Class G.I. Pipe. The Foundation Used For Fixing Is A Structure And Made Fromcenter Pipe Of G.I. Of 80Nb “C” Class Welded With M.S. 12 Gpp Round Plate Of Ø250mm &10Mm Thick. Main Pipe Supported With 25Mm X 25Mm M.S. Angels Of 3Mm Thickenessand20mm X 40Mm Crc Square Pipes Of 3Mm Thickness. Closing Cap Are Made Upof High Quality Fiber Reinforced Plastic Material. Foundation Cover Closing Cap Is Made From Frp Materials With 0.7Mmthickness. Heightensil Steel With Galvanizednuts And Bolts Are Used For Assembly. The Powder Done Withpure Polyester Powders Of Ackzonoble Or Berger Paints With 60 To 70 Micron Thickness.