Border Roads Organisation-BRO has published Providing, Laying And Compaction Of 75 Mm ( Double Layer ) Thick Wet Mix Macadam ( Wmm ) , 75 Mm Thick Dense Bituminous Macadam And40 Mm Thick Bituminious Concrete Conforming To Clause 406, 505 And 507 Of Mort&H Specifications. Submission Date for this Tender is 06-02-2023. Bolts Tenders in durbuk Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Providing, laying and compaction of Wet Mix Macadam (WMM) layer compacted thickness 75 mm (Double layer) conforming to Section 406 of MORT&H Specifications for Road and Bridge Works (5th Revision) on road Durbuk – Tangtse between km 74.360 to Km 81.600. |
2 | Providing and applying of Prime coat with bitumen emulsion on WMM surface including cleaning of road surface and spraying primer @7.5 Kg/10 Sqm (Using BPD with manual labour) confirming to Section 502 of MORT&H Specifications for Road and Bridge Works (5th Revision) for surfacing work on road Durbuk – Tangtse between km 74.360 to Km 81.600. |
3 | Providing and applying of Tack coat with Cationic bitumen emulsion or bitumen VG-10 grade using bitumen pressure distributor @ 2.5 Kg/10 Sqm on prepared Primed and Bituminous surface cleaned with mechanical broom conforming to section 503 of MORT&H specifications (5th Revision) for surfacing work on road Durbuk – Tangtse between km 74.360 to Km 81.600 |
4 | Providing, laying and compaction of DBM layer compacted thickness 75 mm thick conforming to section 505 of MORT&H specifications (5th Revision) for surfacing work on road Durbuk – Tangtse between km 74.360 to Km 81.600. |
5 | Providing, laying and compaction of BC layer compacted thickness 40 mm over Dense Bituminous Macadam layer conforming to section 507 of MORT&H specifications (5th Revision) for surfacing work on road Durbuk – Tangtse between km 74.360 to Km 81.600. |
6 | Road Marking with Thermoplastic Paint (2.50 mm thick) conforming to Section 803 of MORT&H Specifications for Road and Bridge Works (5th Revision) and IRC:35-2015 for surfacing work on road Durbuk – Tangtse between km 74.360 to Km 81.600. |
7 | Providing and Fixing of road stud 100x100 mm, dia cast in aluminum, resistance to corrosive effect of salt and grit, fitted with lens reflectors, installed in concrete or asphaltic surface by drilling hole 30mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS :873 (part-4)1973, all complete as per clause 804 of MORT&H (5th Revision) specification for surfacing work on road Durbuk – Tangtse between km 74.360 to Km 81.600. |