Public Works Department-PWD has published Tender For Improvement Of The Office Of The Employment Exchange, Meghalaya For The Person With Disabilities Under Accessible India Campaign. Submission Date for this Tender is 09-03-2023. Building Work Tenders in shillong Meghalaya. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-Jan-2023 | EMD amount | Financial Bid | 06-02-2023 |
2 | 25-Jan-2023 | Technical bid and Form of Financial Bid | Technical Bid | 06-02-2023 |
3 | 06-Feb-2023 | Extension of dates | Date | 09-03-2023 |
Sl. No. | Item Description |
1 | Civil works |
2 | Improvement of the Office of the Employment Exchange, Meghalaya for the person with disabilities under Accessible India Campaign |
3 | Item Rate |
4 | External Environment |
5 | PARKING |
6 | Parking bays for PWDsWith paveron ParkingLot, asquare with a dimension of at least 5000mm x3600mm |
7 | (a)Including aisle way 1200mm(from main entrance to parking) |
8 | (b)Including aisle way 1200mm( parking to lift) |
9 | ©International symbol of acessibility (wheelchair sign) at approaches and entrances to car parks ……….height 2100mm of size 600mm X 600mm |
10 | ALIGHTING POINT |
11 | Based on recomendation with tactile pavers and sinage should be clearly marked. |
12 | (a)Alighting area |
13 | ©Tactile pavers route (from gate to building entrance) |
14 | (a)Directional and Identificationsinage |
15 | (b)Directional and Identification braille sinage |
16 | ACCESSIBLE ROUTE |
17 | (a)Tactile pavers route (from gate to parking for PwD) |
18 | (b)Tactile pavers route near to building compound wall |
19 | (c)Warning Block to be installed 300mm from top and bottom of the Stairs(for main entrance)onestaircase. |
20 | ©Colouring constarsting stripes forSteps(for 5 floors)onestaircase |
21 | (d)provision of chair lift including fitting,fixing and installation(in this case two for each stairs as it exceeded 5m,and ramp provision cannot be accomodated)) |
22 | Internal Environment |
23 | ACCESSIBLE ENTRANCE |
24 | (b)Directional and Identificationsinage |
25 | (c)Directional and Identification braille sinage |
26 | RECEPTION AND LOBBY |
27 | (a)Directional and Identificationsinage |
28 | (b)Directional and Identification braille sinage |
29 | ©Security counter(lower down to 800mm) |
30 | STEPS/STAIRS |
31 | FRONT BLOCK |
32 | (b)Warning Block to be installed 300mm from top and bottom of the Stairs(for 5 floors)onestaircase. |
33 | ©Colouring constarsting stripes forSteps(for 5 floors)onestaircase |
34 | ELEVATOR/LIFT |
35 | (a) Conventional Lift (13 passengers) |
36 | (b)Rear mirror |
37 | (c)Directional and Identificationsinage |
38 | (d)Directional and Identification braille sinage |
39 | (d)grab bars |
40 | (e)sign indicating the number of floors |
41 | (f) Announcement system (5% oftotal cost,included) |
42 | CORRIDORS |
43 | (a)Tactile floor mat(Width=1.20m) |
44 | first floor |
45 | second |
46 | third |
47 | fourth |
48 | (c)Directional and Identificationsinage |
49 | (d)Directional and Identification braille sinage |
50 | DOORS AND DOORWAYS |
51 | D handles fitted with lever action locks and of circular section |
52 | first |
53 | second |
54 | third |
55 | fourth |
56 | Vision Panel(As per Market Rate) |
57 | first |
58 | second |
59 | third |
60 | fourth |
61 | kick plates |
62 | first |
63 | second |
64 | third |
65 | fourth |
66 | ACESSIBLE TOILET( for 5 nos) |
67 | Construction of Accessible Toilet for Persons with disabilities |
68 | Door outward open(Included in Estt in Annexure) |
69 | Horizontal pull-bar for door |
70 | Locking systen |
71 | Grab bars for w.c |
72 | L shaped grab bar(as per market price) |
73 | Hinged type grab bar |
74 | Emergency alarm cum switch(=5%of) |
75 | hand dryer(As per Market Rate for Hygiene Stainless steel) |
76 | waste bin (As per Market Rate for Stainless steel)) |
77 | Drinking water |
78 | (a)Sinage |
79 | (c)Directional and Identificationsinage |
80 | (d)Directional and Identification braille sinage |
81 | Cafeteria |
82 | (a)Sinage |
83 | (c)Directional and Identificationsinage |
84 | (d)Directional and Identification braille sinage |
85 | CONTROL & OPERATING MECHANISMS |
86 | 5% from the total cost (INCLUDED) |
87 | SIGNAGE |
88 | As per recomendation Signages with auniform colour (preferably blue & white) provided with braille and tactile supplements at a height of |
89 | FOR DOORS(60mm) |
90 | (a)900mm |
91 | (b)1500mm |
92 | AT MAINENTRANCES and all floors lobby(200mm)sign board with braille text |
93 | corridors(110mm) |
94 | EMERGENCY EVACUATION |
95 | (a)Arrow Sinage |
96 | Ground |
97 | first |
98 | second |
99 | third |
100 | fourth |
101 | (b)Flashing beacons |
102 | Ground |
103 | first |
104 | second |
105 | third |
106 | Bridge connecting to Main Secretariat |
107 | fourth |
108 | (d)Evacuation plans.P(Of the size 4ftx6ft) |
109 | Ground |
110 | first |
111 | second |
112 | third |
113 | fourth |