| 1 | SUPPLY OF OXYGEN ANALYSER SYSTEM FOR CCR UNIT FOR NREP PROJECTDesign, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visits, Special Tools & Tackles for OXYGEN ANALYSER SYSTEM FOR CCR UNIT as specified in Material Requisition & mentioned below. |
| 2 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visits for Supply of OXYGEN ANALYSER(TAG NO. 1P23-AT-638101) -1 Lot as specified in Material Requisition. |
| 3 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visits for Supply of OXYGEN ANALYSER(TAG NO.1P23-AT-632101) -1 Lot as specified in Material Requisition. |
| 4 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares,Mandatory Periodic Visits for Supply of OXYGEN ANALYSER (TAG NO.1P23-AT-632102)-1 Lot as specified in Material Requisition. |
| 5 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares,Mandatory Periodic Visits for Supply of OXYGEN ANALYSER(TAG NO.1P23-AT-632103) -1 Lot. as specified in Material Requisition. |
| 6 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares,Mandatory Periodic Visits for Supply of OXYGEN ANALYSER (TAG NO. 1P23-AT-632104X) 1 Lot as specified in Material Requisition. |
| 7 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visits for Supply of OXYGEN ANALYSER (TAG NO. 1P23-AT-632104Y)-1 Lot as specified in Material Requisition. |
| 8 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visits for Supply of OXYGEN ANALYSER (TAG NO. 1P23-AT-632104Z)-1 Lot as specified in Material Requisition. |
| 9 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visits for Supply of OXYGEN ANALYSER(TAG NO. 1P23-AT-638501 )-1 Lot as specified in Material Requisition. |
| 10 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visits for Supply of OXYGEN ANALYSER(TAG NO.1P23-AT-825602 ) -1 Lot as specified in Material Requisition. |
| 11 | Design, detail engineering, procurement, manufacturing, assembly, testing , inspection, packing, forwarding,and supply till site including Commissioning spares, Mandatory Periodic Visitsfor Supply of OXYGEN ANALYSER (TAG NO. 1P23-AT-825604 ) -1 Lot as specified in Material Requisition. |
| 12 | Charges for Mandatory Spares as mentioned in MRfor Oxygen Analyser System for CCR Unit |
| 13 | Charges for Training for Oxygen Analyser System for CCR Unitas per MR |
| 14 | Per diem charges for training at NRL site as per MR for 5 man-days |
| 15 | Lumpsum Charges for Trainingat OEM\"s Work as mentionedin the MRfor 5 man-days |
| 16 | Charges for SITE Supervision of Erection / Installation and Testing for Supply ofof Oxygen Analyser System for CCR Unitas per MR for 30 (Thirty) Man-Days for complete lot shall be considered for supervision of erection, testing and commissioning at site |
| 17 | Per diem charges for upto 8 hours work on normal working days. |
| 18 | Overtime rate / hour beyond normal 8 hours work on normal working days. |
| 19 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). |