E-Tender For Loading, Unloading And Stacking Of Materials Shenbagapudur Sub Stores To Field In Sathy Division -Loading ( Or ) Unloading Of Transformers From Lorry To The Stores Yard / Section And Stacking Various Capacitiesup To40 Kva 2 Loading ( Or ) Unloading Of Transformers From Lorry To The Stores Yard / Section And Stacking Various Capacities 63 Kva To 200 Kva 3 Loading ( Or ) Unloading Of Transformers From Lorry To The Stores Yard / Section And Stacking Various Capacities Above 200 Kva 4 Loading ( Or ) Unloading Of Metering Sets From Lorry To The Stores Yard / Section And Stacking Various Capacities In 11Kv And 22Kv 5 Unloading Of Conductor Drum From Lorry Leading And Stacking In Stores Yard / Section 6 Loading Of Conductor Drum To Lorry 7 Uncoiling The Conductor Drum, Bundling , Weighing And Transporting To Stores Yard And Stacking 8 Uncoiling The Condctor Drum, Bundling , Weighing And Loadingin The Lorry And Unloading At Section 9 Loading ( Or ) Unloading Of Rs Joist / Rails From Lorry Or Truck 10 Loading ( Or ) Unloading Of Iron & Steel Materials 11 Lifting , Leading , Weighing And Stacking Of Iron & Steel Materials 12 Loading ( Or ) Unloading Of All Other Line Materials Such As Structure Materials , X-Arm, Stay Sets, G.I. Wire, Stay Wire, Earth Pipes And Consumable Items 13 Unloading Of Cement From Lorry Or Truck / Loading Of Cement To Lorry . 14 Loading ( Or ) Unloading Of Meters Sq, 3Q, Tube Light Fitting, 15 Loading ( Or ) Unloading Of Chokes, Ltct Coil , Lt Las, Fuse Unit, Hut Service Kit And Other Items With Individual Packing 16 Loading ( Or ) Unloading Of L.T.Pin Insulators, Guy Shackle, L.T.Shackle 17 Loading ( Or ) Unloading Of Crates With 11Kv / 22Kv Disc, 11 / 22 Kv.Pin Insulators Verifying And Stacking 18 Loading ( Or ) Unloading & Stacking Of Oil Drums With Oil 19 Loading ( Or ) Unloading Of Bags With 11 / 22 / 33Kv Polymer Disc, 11 / 22 / 33Kv Polymer Pin Insulators & Pt Insulators Verifying And Stacking 20 Loading ( Or ) Unloading & Stacking Of Paint Container With Paint Of Maximum 5 Ltrs Capacity 21 Loading ( Or ) Unloading Of L.T.Open Type Fuse Unit, 11Kv / 22Kv H.G. Fuse Set 22 Unpacking, Verifying, Counting And Repacking, Stacking Of Meters, Las, Chokes, Fuse Unit And Others 23 Loading ( Or ) Unloadig Of Single Pole 11Kv 22Kv H.G.Fuse Set 24 Loading ( Or ) Unloading Of All Size Of Tyres, Lt / Ht. Trivector Meters, Indoor C.T And Stacking 25 Lifting, Leading , Weighing, And Stacking Of All Scrap Materials Including Copper, Aluminum , Etc. 26 Unloading Of All Kinds Of Scraps From Lorry Weighing And Stacking 27 Loading Of All Kinds Of Scraps To Lorry 28 Unpacking, Verifying, And Repacking, Stacking Of M.S. Bolt & Nut, And Others 29 Uncoiling , Measuring, Recoiling, And Stacking Of Pvc Cable 2.65 Sq.Mm , 6.00 Sq.Mm And Others 30 Uncoiling , Measuring, Recoiling, And Stacking Of Pvc Cable, 50, 95, 120 Sq.Mm And Others 31 Loading ( Or ) Unloading & Stacking Of Pvc Cable -2.65Sq.Mm, 6.00 Sq.Mm And 25 Sq.Mm 32 Loading ( Or ) Unloading & Stacking Of Pvc Cable50sq.Mm, 95.00 Sq.Mm And 120 Sq.Mm 33 Loading ( Or ) Unloading & Stacking Of 11Kv / 22Kv Ab.Switch Double Pole 34 Loading ( Or ) Unloading & Stationary Items Attransport Lorrybundles- Upto 30 Kgs 35 Loading ( Or ) Unloading & Stationary Items Attransport Lorry Bundle -30 To 50 Kgs 36 Loading ( Or ) Unloading & Stationary Items Attransport Lorrybundle Above 50 Kgs 37 Loading ( Or ) Unloading Of Empty Drums A ) Wooden Drum 38 Loading ( Or ) Unloading Of Empty Drumssteel Drum 39 Loading ( Or ) Unloading , Stacking Of 11Kv 22Kv Single Pole Ab Switch 40 Loading ( Or ) Unloading & Stacking Of 11Kv 22Kv 33Kv Center Rotating Type Ab Switch 41 Loading ( Or ) Unloading Of Shunt Capacitor 42 Unpacking, Of Gunny Bags , Verifying, & Stacking Of Sec. Wires, Sea Alu.Wire Up To 30.0 Kgs 43 Unpacking, Of Gunny Bags, Verifying, & Stacking Of Tc. Fuse Wires 44 Unpacking Counting Verifying And Stacking Of Numberedlead / Hologram Seals 45 Loading ( Or ) Unloading & Stacking Of Cables In Drums Wooden Drums 46 Loading ( Or ) Unloading & Stacking Of Cables In Drums Steel Drums 47 Loading ( Or ) Unloading Of 6Way Pillar Box 48 Loading ( Or ) Unloading Of 4Way Pillar Box 49 Loading ( Or ) Unloading Of Mini Pillar Box 50 Loading ( Or ) Unloading Of Frb Pillar Box 51 Loading Of V-Trough 52 Unloading And Stacking Of V-Trough 53 Loading ( Or ) Unloading& Stacking Of Straight Joint Kit / End Termination Kit 54 Transporting Of Materials By Private Vehicle With Load Up To 8Km ( Plains ) 55 Transporting Of Materials By Private Vehicle With Load Up To 8Km ( Hills ) 56 Transporting Of Materials By Private Vehicle With Load Beyond 8Km For Every Additional Km 57 Loading Of Poles Upto 27 58 Loading Of Poles Upto 30 59 Unloading Of Poles Upto 27 60 Unloading Of Poles Upto 30 61 Loading ( Or ) Unloading Outdoor Ct , Pt And Indoorct, Pt 62 Loading ( Or ) Unloading Of Transformer Oil Drums, Leading, Weighing And Stacking Yard. 63 Loading ( Or ) Unloading, Stacking Of Various VcbS11 / 22 / 33Kv By Engaging Crane 64 Loading ( Or ) Unloading, Stacking Of Various Sizes Of Battery Set For 55Cells 65 Loading ( Or ) Unloading, Stacking Of Station Type Las Of Various Sizes