| 1 | Excavation of foundation in ordinary soil loam, clay and sand including lift upto 1.50 m. and lead 30 m. including filling, watering and ramming of excavated earth into the space between building and side of foundation trenches etc. all complete as per D.A.R. No. 2.8.1. G.S.T. will be paid extra as per preveling rules. |
| 2 | Providing and Laying in cement concrete 1:5:10 with cement, coars sand and 40 mm brick ballast including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-4.1.10. G.S.T. will be paid extra as per preveling rules. |
| 3 | M-150 class brick work in 1:6 with cement and coarse sand mortar in foundation and plinth including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No. 6.1.2. G.S.T. will be paid extra as per preveling rules. |
| 4 | R.C.C. work in 1:1.5:3 with cement, coarse sand and 20 mm stone grit including supply of all the materials, labour and T & P etc. all complete G.S.T. will be paid extra as per preveling rules. |
| 5 | (a) Plinth Band as per D.A.R. No.-5.2.2 |
| 6 | (b) Lintal as per D.A.R. No.-5.2.2 |
| 7 | (c) Slab as per D.A.R. No.-5.3 |
| 8 | (d) Column as per D.A.R. No.-5.2.2 |
| 9 | Mild Steel or Iron Work in the reinforcement including cutting, bending and binding etc. all complete as per C.H. No.-01, S.L. No.-13(a) & D.A.R. No.-5.22.6.G.S.T. will be paid extra as per preveling rules. |
| 10 | Fabrication of M.S. Angle Iron Door including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-10.31 G.S.T. will be paid extra as per preveling rules. |
| 11 | Fabrication of M.S. Angle Iron for Ventilator including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-10.31 G.S.T. will be paid extra as per preveling rules. |
| 12 | Class-150 brick work in 1:6 with cement and fine sand mortar in the super structure including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-6.4.2 G.S.T. will be paid extra as per preveling rules. |
| 13 | 12 mm thick plaster in 1:4 with cement and fine sand mortar including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-13.1.1 G.S.T. will be paid extra as per preveling rules. |
| 14 | 12 mm thick plaster in 1:6 with cement and fine sand mortar including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-13.1.2 G.S.T. will be paid extra as per preveling rules. |
| 15 | Providing and Laying Vitrified Floor Tiles in the different sizes (thickness to be specified by manufacture) with water absorption less than 0.08% and confirming to the IS:15622 of approved make in all colours and shades laid in 20 mm thick cement mortar in 1:4 with cement and coarse sand mortar including grouting joints with white cement and matching pigments etc. all complete as per D.A.R. No.-11.47.2 G.S.T. will be paid extra as per preveling rules. |
| 16 | Supply and Fixing of 35 mm thick flush board for Door including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-9.21.1 G.S.T. will be paid extra as per preveling rules. |
| 17 | Supply and Fixing of 25 mm thick Veneered Particle Board for Window and Ventilation and including supply of all the materials, labour and T & P etc. all complete as per S.I. No.-14(8), S.O.R. Kheri 2020 G.S.T. will be paid extra as per preveling rules. |
| 18 | Painting or Varnishing on Iron Work in small areas or new wood work with one coat of readymixed priming paints and one coat of the approved superiour quality readymixed paint of varnish including supply of all the materials, labour and T & P etc. all complete as per S.I. No.-641 & 642 G.S.T. will be paid extra as per preveling rules. |
| 19 | Providing and Applying White cement Based Putty of the average thickness 1 mm of approved brand and manufacture over the plasterd wall surface even and smooth surface etc. all complete as per D.a.R. No.-13.80 G.S.T. will be paid extra as per preveling rules. |
| 20 | One Priming Coat and Two Coat of Oil Bound Distemper on new work including supply of all the materials, labour and T & P etc. all complete as per S.I. No.-649 & 650 G.S.T. will be paid extra as per preveling rules. |
| 21 | Finishing Wall with Water Proofing Cement Paint of the approved make and quality on new work with three coat to give an even shade including supply of all the material labour and T & P etc. all complete as per S.I. No.-660 & 661 G.S.T. will be paid extra as per preveling rules. |
| 22 | Supply & Fixing of A.C. Down Pipe with Collar including and supply of all the materials, labour and T & P etc. all complete G.S.T. will be paid extra as per preveling rules. |
| 23 | Supply and Fixing of Commode including supply of all the materials, labour and T & P etc. all complete G.S.T. will be paid extra as per preveling rules. |
| 24 | Plumbering Work in Bath Room and Toilet G.S.T. will be paid extra as per preveling rules. |
| 25 | Providing and Laying of the cement based waterproofing treatment including preparation of surface as required for treatment roofs, balconies, terraces etc. consisting of following operating (a) Applying a slurry coat of neat cement using 2.75 Kg. per Sqm of cement readymixed with waterproofing compound confirming to IS;2645 and approved by Engineer-In-Charge over R.C.C. slab and including adjoining walls up to 300 mm length including cleaning surface before treatment, (b) Laying O.B. brick bats with moter using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar in 1:5 with cement and coarse sand mortar admised with water proofing compound confirming to IS:2646 and approved by Engineer-In-Charge to required slope and treatment similarly adjointing walls upto 300 mm height including routing of junctions of walls and slabs etc. all complete as per C.H. No.-11, S.I. No.-11, S.O.R. Kheri Date-09/07/2020G.S.T. will be paid extra as per preveling rules. |
| 26 | Supply and Fixing of 500 Litre Syntex Water Storage Tank of approved quality including supply of all the materials, labour and T & P etc. all complete as per D.A.R. No.-18.48 G.S.T. will be paid extra as per preveling rules. |
| 27 | Earth Work in embankment in ordinary soil excavation to be done from regular pits 20 cm. layers including ramming and dressing pulverzation surface to required levels and slope as directed by Engineer-In-Charge as per D.A.R. No.-2.25 |