| 1 | Providing and displaying of Raphes palm having ht. 45 cm to 60 cm with 5 to 7 suckers, well developed, full of fresh and healthy leaves in 25 cm size of Earthen pot/Plastic pot & as per direction of the officer-in-charge. |
| 2 | Providing and Displaying Ficus Retusa topiary well developed with fresh & healthy 5 to 6 big ball specific size and shape 180 to 210cm ht in 40 cm Cement Pot as per direction of the officer-in-charge. |
| 3 | Providing and Displaying Golden Bottle brush Topiary well developed with fresh & healthy foliage 5 to 6 big ball 115 to 180 cm ht in 40 cm Cement Pot as per direction of the officer-in-charge |
| 4 | Providing and Displaying Cyprus golden well shaped developed with good colored foliage fresh & healthy 60 to 75 cm ht in 30 cm Earthen Pot as per direction of the officer-in-charge. |
| 5 | Providing and displaying of Areca Palm having ht. 2.40 m to 2.70 m with 12 to 14 suckers, well developed, fresh and healthy with lush green foliage in 35 cm size of Bucket type cement pots & as per direction of the officer-in-charge. |
| 6 | Providing and stacking of Plumeria rubra of height 120-150 cm. with 3-4 branches and thick stem in big size HDPE bags as per direction of the officer-in-charge. |
| 7 | Providing and stacking of Bottle palm of ht. 270-300 cm bottom girth 40-50 cm well developed in big HDPE bags as per direction of the officer-in-charge.E |
| 8 | Providing & laying Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge |
| 9 | Fine dressing of the ground |
| 10 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) Holes 45 cm dia, and 45 cm deep. |
| 11 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: |
| 12 | Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m.lead complete (Cattle manure measured in stacks will reduced by 8% for Payment). |
| 13 | Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water) Trees Plant |
| 14 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). |
| 15 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). |
| 16 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |