Repair / Replacement Of Central Ac Plant And Connected Works At Af Adampur

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 05-Dec-2022 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 12-12-2022

Key Value

Document Fees
INR 500 /-
EMD
INR 40000.0 /-
Tender Value
INR 20 Lakhs /-

BOQ Items

Name of Work: REPAIR / MAINTENANCE OF CENTRAL AC PLANTAND CONNECTED WORKS AT AF STN ADAMPUR.
Sl. No. Item Description
1Dismantling and taking out unserviceable reciprocating type compressorincluding opening complete unit, repairing the crank shaft, remetaling, grinding and polishing , reaming of cylinder bore and replacement of unserviceable parts and reassembling of the complete compressor unit testing and commissioning, completeas following capacity and make:-.
25 to 7.5 TR (Make- ACCEL)
310 to 15 TR (Make- Voltas)
4NOTE:- :- (i)Cost of replacement of minor parts such as nuts, bolts washers, etc to make the plant functional as required shall be deemed to be included in the unit rate quoted by contractor. (ii) Spares required for replacement shall be measured and paid for separately as supply only under serial item No-2 of BoQ here-in-after as directed by Engineer-in-charge. Cost of fixing of parts is deemed to be included in the unit rate quoted by the contractor against this item. (iii)Rates for draining out the compressor oil and refilling the same with fresh compressor oil as required shall also be deemed to be included in this item. (iv) Repair of compressor shall be done through authorised OEM. (v) After repair of compressor testing will be done on contractor own arrangment & cost.
5Supply only of the following items:-
6Gasket Set suitable for Model SMC-2-65
7Gasket Set suitable for Model SMC-4-65
8Connecting Rod
9Piston bare
10Cylinder linner with suction valve
11Piston Ring
12Scaper Ring
13Oil pump
14S V Ring plate
15D V Ring plate
16Valve spring
17Half section bearing 0.25mm
18Half section bearing 0.50mm
19Split pin
20Shaft seal assembly
21Dowty ring
22Neoprene "O" ring set
23Discharge flange bolt size 10mm
24Bushing with collar 0.25mm
25Bushing with collar 0.50mm
26Special carbob ring
27Slide ring (Cast iron)
28C R bolt
29Castel nut
30Discharge valve bolt (screw) with nut
31Rocker spring
32Spring holder
33Rocker arm
34Bearing cup
35Cup washer
36Crank shaft IN REPLACEMENT including all necessary arrangements/ items to match all as required for Make-ACCEL complete as directed offollowing capacity / model of compressor.
37SMC-2-65
38SMC-4-65
39Shifting of Crank shaft to workshop, re-metaling, grinding, turning, polishing and make suitable size to match the serviceable all as required for compressor complete of following.
40SMC-2-65 Model (Make- ACCEL)
41SMC-4-65 Model (Make- ACCEL)
42Disconnecting, cutting and taking out unserviceable sealed unit compressor of package type air conditionerany make & model including removal, fitting/fixing of serviceable sealed unit compressorsoldering, welding, brazing as required including charging of refrigerant gas and oil in the exchanged compressor, making electric & mechanical connections at site and testing on load,complete of thefollowing capacity:-.
435.5 Ton
447.5 to 8.5 Ton
45Supply only with provision of clean exchange of unserviceable compressor with company made new one compressor of package type air conditionercomplete of the following capacity:- (Make : Kirloskar / Copland / Danfoss.) NOTE:- (i) Micro processor based control comprising for following features- (a) Automatic capacity control reducing energy consumption. (b) Micro processor based sequence of starting / stopping of equipment with fixed time delay. (c) Alarm history giving cause of tripping. (d) LP/HP cut out. (ii) Fail safe features comprises the following:- (a) Under voltage protection (b) Single phase protection (c) Over load protection (d) Phase inbalance protection (e) Anti freeze protection (f) Power loss trip and shut down (iii) Set of water flow switches in condenser and chiller water line at intel and oulet. (iv) First charge of refrigerant gas and compressor oil as per manufacturer"s recommendation.
465.5 Ton
477.5 to 8.5 Ton
48Disconnecting, cutting and taking out unserviceable sealed unit compressor of central type air conditionerany make & model including removal, fitting/fixing of serviceable sealed unit compressorsoldering, welding, brazing as required including charging of refrigerant gas and oil in the exchanged compressor, making electric & mechanical connections at site and testing on load,complete of thefollowing capacity:-.
497.5 Ton
5012.5 Ton
51Supply only with provision of clean exchange of unserviceable compressor with company made new one compressor of central type air conditionercomplete of the following capacity:- (Make : Kirloskar / Copland / Danfoss.) NOTE:- (i) Micro processor based control comprising for following features- (a) Automatic capacity control reducing energy consumption. (b) Micro processor based sequence of starting / stopping of equipment with fixed time delay. (c) Alarm history giving cause of tripping. (d) LP/HP cut out. (ii) Fail safe features comprises the following:- (a) Under voltage protection (b) Single phase protection (c) Over load protection (d) Phase inbalance protection (e) Anti freeze protection (f) Power loss trip and shut down (iii) Set of water flow switches in condenser and chiller water line at intel and oulet. (iv) First charge of refrigerant gas and compressor oil as per manufacturer"s recommendation.
527.5 Ton
5312.5 Ton
54Pre filterin sheet metal frame IN REPLACEMENT complete. of following size:-
5524? x 24? x 2?
5621"x21.5"x2""
57Expansion valve, Capacity 5/7.5/11/15/25 Ton IN REPLACEMENT complete all as directed.
58Solenoidvalve, Capacity 5/7.5/11/15/25 Ton IN REPLACEMENT complete all as directed.
59V belt, IN REPLACEMENT complete. of following size:-
60A-32
61A-65
62B-78
63B-105
64PVC float valve with PVC float.alluminium stem, fly nut complete screw for iron pipe IN REPLACEMENT of following size:-
6515 mm bore
6620mm bore
67Gun metal gate valve with iron wheel ISI marked IN REPLACEMENT of following size:-
6825mm bore
6940mm bore
7050mm bore
7180mm bore
72HP / LP control switch IN REPLACEMENT complete.
73Oil failureswitch IN REPLACEMENT complete.
74Charging refrigerant F-22/R-22 (Mefron/Refron) gas (to be brought by contractor at site from authorised dealer /manufacturer in sealed cylinder of 61 Kgs) in plant after detection/rectificationof any leakage in the system by usingCO2 gas and flushing the complete system thoroughly with Nitrogen gas, complete all as specified and directed. Note: The cost ofNitrogen/ CO2 gas used for leakage test and pressure tests prior to filling /charging gas F-22/R-22 shall be deemed to be included in the unit rates.
75Charging refrigerant R-407 (Mefron/Refron) gas (to be brought by contractor at site from authorised dealer /manufacturer in sealed cylinder of 45 Kgs) in plant after detection/rectificationof any leakage in the system by usingCO2 gas and flushing the complete system thoroughly with Nitrogen gas, complete all as specified and directed by Engineer-in-charge. Note:- The cost ofNitrogen/ CO2 gas used for leakage test and pressure tests prior to filling /charging gas R-407 shall be deemed to be included in the unit rates.
76Oil pressure gauge, range 30-0-150 PSI having 100mm dia IN REPLACEMENT complete.
77De-scaling and cleaning with the help of mechanical pump system through well qualified thchnician/mistry for entire chocked water and gas circulatin system like condensor unit, chiller unit, AHU colis and pipes with all chiller and condensor refrigent piping system complete including, condenser (heat exchanger) to cooling tower, circulating concentrated servicing of valves de-scaling by chemical solution (ORISCALE BLASTER) mixed with water in suitable proportion including full filling it on cooling tower system till the time and storage in system minimum 24 hrs their whichever is later and as ordered by EIC, up to completion of deposit/scale is removed on system their after it circulating through pump, cooling tower, water spray assembly and cleaning with suitable size of drill rod, wire brush including connecting all dismantled components in proper position after serving/overhauling /greasing etc including replacement of new one packing seal/gasket of pump and chiller unit/condensor unit, valve etc with 3mm thick an nuts, bolts with washer, and make it leakage proof system and testing on load complete of following capacity / size:-
7803 Nos condensing UPTO 15 Ton
7903 Nos condensing above15 Ton to 50 Ton
80Compressor oil IN REPLACEMEMTas directed. NOTE:- Compressor oil shall be brought by the contractor in sealed barrelprocured from the authorized dealer and produce test certificate thereof.
81Dismantling & taking out the starter of electric motor, 3 phase, 415 Volts, 50 C/Sand rewinding the starter of motor with super enameled copper winding wire of same size & gauge as of existing copper winding wire and insulation material including varnishing, drying, banking, reassembling after the complete winding has been carried out and testing on load, complete of following capacity:-
822 - 3 hp
835 hp
847.5 hp
8510 - 12 hp
8620 hp
87PVC honey comb fins suitable for horizontal type FRP cooling tower IN REPLACEMENT complete.
88Air duct made out of galvanized sheet 22 gauge, insulated with fiber glass 50 mm thick covered with wire mesh and aluminiumfoil and providing air grills adjustable type of size 500 mm x 150 mm, spot including MS work for supporting and painting with two coats of synthetic paint IN REPLACEMENT including errecting & testing complete all as specified and directed.
89Water sprinkler comprising of 4 Nos branch pipes, inlet and outlet connectionsIN REPLACEMENT complete all as specified and directed.
90MCCBwith thermal magnetic release, ICS=ICU=100%, 4 Pole, 415 volts, AC, 35 kArupturing capacity IN REPLACEMENT complete as following size:-
9163 Amp
92100 Amp
93125 Amp
94MCB SPN 240 volt,50 HZ, 10 KA rupturing capacity "C" seriesIN REPLACEMENT complete as following size:-
956-32 Amp
9640 Amp
97Auxiliary contact IN REPLACEMENT complete all as specified.
98Mechenical interlock kitIN REPLACEMENT complete all as specified.
99Over load relay IN REPLACEMENT complete as following range:-
1001.2-2.0 Amp
1013-5 Amp
102Electronic timer ST100 IN REPLACEMENT complete all as specified. Make:- L&T cat part No ST803280000 or equivalent in Appendix ""B""
103Power contactor 3 pole415volts, confirming to IEC60947-4-1 & IEC60947-4-1 IN REPLACEMENT complete as following size:-
10425 Amp Make:- L&T cat part No CS94106 type MNX 9A or equivalent in Appendix ""B""
10530 Amp Make:- L&T cat part No CS94108 type MNX 12A or equivalent in Appendix ""B""
10645 Amp Make:- L&T cat part No CS94110 type MNX 25A or equivalent in Appendix ""B""
10755 Amp Make:- L&T cat part No CS94111 type MNX 32A or equivalent in Appendix ""B""
108Auxiliary contact blockIN REPLACEMENT complete all as specified. Make:- L&T cat part No CS94112 type MNX 4NO or equivalent in Appendix ""B""
109Fully automatic star delta starter 3 phase, 15 hp capacity IN REPLACEMENT complete.
110DOL starter 3 phase, 7.55 hp capacity IN REPLACEMENT complete.
111Suction stop valve 1.5"" with fully assembly IN REPLACEMENT complete.
112Discharge stop valve 1.5"" with fully assembly IN REPLACEMENT complete.
113Cooling tower fan motor of capacity 2 HP 3 Phase 415 Volt 1395 RPM alongwith long shaft and locking accessories as per existing model/sample suitable for cooling tower of central AC plant and duly fixed on existing system by any fixing method and making electrical connection IN REPLACEMENTcomplete all as direted by Engineer-in-charge.
114Dismantling of electric connection form monoblock motor with pump from the existing foundation/location and supply and fixing new one electric monoblock centrifugal type motor with pump set complete 3 Phase 440 Volt as per existing model/size with required cable connection including duly fixed with existing position of system with the help of any method including checking and testing on full load complete pump with motor complete as following capacity:-
1153 hp
1165 hp
1177.5 hp
118Hand shut down/butterfly valveas per existing model IN REPLACEMENT complete as following size:-
11940mm dia
12050mm dia
12180mm dia
122PVC insulated4 core unarmoured cable FRLSH multi stranded copper conductor 1100 volt grade IN REPLACEMENT complete as following size:-
1236 Sq. mm
12410 Sq. mm
125Taking out shaft assembly from air handling unit and blower assembly including bearing and bearing housing and shift to workshop for repair and re-assembling after repair/replacement of defective parts as per following, complete all as specified and directed:- (a) Re-metaling the shaft grinding, turning and make suitable size to match with existing system including gas leakage detections from fins and cooling coil repair fins by brazing welding etc. (b) Supply & fixing canvas assembly complete. (c)Repairing blower assembly by fixing MS flat iron 35mm x 6mm on both sides, welding etc support to make the system functional including riveting, grinding, turning complete. (d)Supply & fixing bearing housing assembly including bearing of suitable size. (e)Cleaning the filters and washing with caustic soda and rewire the dirt. (f) Repairing the duct and damper of air handling unit.
126Repair of PCB control panel of chilling unit of package / central unit / hot water generator of any capacity / make including checking the components, replacing damaged components with new one, making the PCB fully functional entire satisfaction of Engineer-in-charge.
127Heating rod of pan type humidifier, 3 phase, capacity 6kwas per existing model / size including cable connection, fixed with existing position of system with the help of any method including checking and testing IN REPLACEMENT complete.
128Heating rod of hot water generator, 3 phase, capacity 7kwas per existing model / size including cable connection, fixed with existing position of system with the help of any method including checking and testing IN REPLACEMENT complete.
129Chiller unit sensor of central type AC plant as per existing model / size including cable connection, fixed with existing position of system with the help of any method including checking and testing IN REPLACEMENT complete.
130Bearing P-205/207 of package type AC plant duly fixed on existing system / make IN REPLACEMENT complete.
131Drayer of package type AC plant fixed on existing system / make IN REPLACEMENT complete.
132PCB along with all accessories as per existing model/sample suitable for cooling tower of central AC plant and duly fixed on existing system by any fixing method and making electrical connection including taking down existing PCB, complete all as specified and directed. Make- Voltas (Packaged type AC plant 3x 11 TR) Engine Model No. ACOPUASC110R407 Sr. No. 000139 PCB Model No:-PACMPDLTW Sr No.34/SAPL-PACL/PNL/2K/23 Location - Signal section AC plant
133PCB along with all accessories as per existing model/sample suitable for cooling tower of central AC plant and duly fixed on existing system by any fixing method and making electrical connection including taking down existing PCB, complete all as specified and directed. Make- Voltas (Packaged type AC plant 3x 8.5 TR) Engine Model No. ACOPUWSC875DR407 Sr. No. D000100 PCB Model No:- PACMPDSINGLE Sr No.233/SAPL-PACI/PNL/2A Location - Bldg No 10 WSA-I AC Plant
134Fitting / shifting in ceiling ductable / type of air conditioner 7.5 / 8.5 Ton capacity any make type & model including all accessories hanging rod / fastners, copper pipe as per suitable size with sleaves upto 10m long each as required including charging of refrigerant gas (R-22/407) & making all electric connection complete all as spcified. NOTE:- Refrigerant gas (R-22/407) & cable for connection shall be measured and paid separately.
135Triple pole and neutral enclosure with a two pin and earth plug and socket complete with one TPN MCB 32 Amp, 240 volt, breaking capacity not less than 10 kA, complete all as specified..
136NOTE FOR SERAL ITEM 1 to 52 :- Not withstanding with the provision of "Compensation for Delay" envisaged under condition 50 of IAFW-2249, General Conditions of Contracts, additional compensation@ Rs. 500/- day will be charged from contractor in case he fails to make the functional to the entire satisfaction of Engineer-in-Charge within 24 hour of receiving of complaint from the MES regarding non working above items.
137Note :Amount ofcredit for retrieved materials is mentionedin Sch "A" Section-II of tender documents in pdf form which will be deducted while acceptance of tender offline.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail