| 1 | Piping System1 | Repairoverhauling and reburbishment of BUTTERFLY VV AER DA SW DN PN 10 STD MATERIAL GUN METAL 125 NB |
| 2 | Piping System2 | Repairoverhauling and reburbishment of BUTTERFLY VV MAIN SEA WATER LINE AER DN PN 10 STD MATERIAL GUN METAL 200 NB |
| 3 | Piping System3 | Repairoverhauling and reburbishment of BUTTERFLY VV DA SW MERDN PN STD MATERIAL GUN METAL 150 NB |
| 4 | Piping System4 | Repairoverhauling and reburbishment of BUTTERFLY VV FIRE PUMP BILGE SYSTEM DN PN 10 STDMATERIAL GUN METAL 125 NB |
| 5 | Piping System5 | Repair overhauling and reburbishment of BUTTERFLY VV MER SEA WATER DN PN 10 STDMATERIAL GUN METAL 150 NB |
| 6 | Piping System6 | Repairoverhauling and reburbishment of BUTTERFLY VV AER MAIN SEA WATER DN PN 10 STDMATERIAL GUN METAL 200 NB |
| 7 | Piping System7 | Repairoverhauling and reburbishment of BUTTERFLY VV MAIN SEA WATER LINE MER DN PN 10 STD MATERIAL GUN METAL 300 NB |
| 8 | Piping System8 | Repairoverhauling and reburbishment of BUTTERFLY VV MAIN SEA WATER LINE MER DN PN 10 STD MATERIAL GUN METAL |
| 9 | Piping System9 | Repairoverhauling and reburbishment of BUTTERFLY VV MAIN SEA WATER LINE MER DN PN 10 STD MATERIAL GUN METAL 250 NB |
| 10 | Piping System10 | Repairoverhauling and reburbishment of BUTTERFLY VV MAIN SEA WATER LINE MER DN PN 10 STD MATERIAL GUN METAL 250 NB |
| 11 | Piping System11 | Repairoverhauling and reburbishment of BUTTERFLY VV MAIN SEA WATER LINE MER DN PN 10 STD MATERIAL GUN METAL 200 NB |
| 12 | Piping System12 | Repairoverhauling and reburbishment of BUTTERFLY VV AER DA SEA WATER DN PN 10 STDMATERIAL GUN METAL 125 NB |
| 13 | Piping System13 | Repairoverhauling and reburbishment of GATE VV SALVAGE AER DN PN 10 STDMATERIAL GUN METAL 200 NB |
| 14 | Piping System14 | Repairoverhauling and reburbishment of GATE VV TANK SPACE FO SYSTEM DN PN 10 STD MATERIAL GUN METAL 65NB |
| 15 | Piping System15 | Repairoverhauling and reburbishment of GATE VV A and C PUMP ROOM DN PN 10 STD MATERIAL GUN METAL 100 NB |
| 16 | Piping System16 | Repair overhauling and reburbishment of GATE VV A and C PUMP ROOM DN PN 10 STDMATERIAL GUN METAL 100 NB |
| 17 | Piping System17 | Repair overhauling and reburbishment of GATE VV A and C PUMP ROOM DN PN 10 STDMATERIAL GUN METAL 100 NB |
| 18 | Piping System18 | Repairoverhaulingand reburbishment of GATE VV BALLAST TANK DN PN 10 STDMATERIALGUN METAL 200 NB |
| 19 | Piping System19 | Repairoverhauling and reburbishment of GATE VV GLAND COPTLUB OIL DN PN 10 STD MATERIAL GUN METAL 20 NB |
| 20 | Piping System20 | Repairoverhauling and reburbishment of BALL VV MER FO SYSTEM DN PN 10 STD MATERIAL GUN METAL 50 NB |
| 21 | Piping System21 | Repairoverhauling and reburbishment of BALL VV AER FO SYSTEM DN PN 10 STD MATERIAL GUN METAL 50 NB |
| 22 | Piping System22 | Repairoverhauling and reburbishment of BALL VV AER FO SYSTEM DN PN 10 STD MATERIAL GUN METAL80 NB |
| 23 | Piping System23 | Repairoverhauling and reburbishment of BALL VV MER BILGE SUCTION DN PN 10 STD MATERIAL GUN METAL 50 NB |
| 24 | Piping System24 | Repairoverhaulingand reburbishment of BALL VV MER BILGE SUCTION DN PN 10 STD MATERIAL GUN METAL50 NB |
| 25 | Piping System25 | Repairoverhauling and reburbishment of BALL VV AER FO SYSTEM DN PN 10 STD MATERIAL GUN METAL 80 NB |
| 26 | Piping System26 | Repairoverhaulingand reburbishment of BALL VV AER SEA WATER SYSTEM DN PN 10 STD MATERIAL GUN METAL50 NB |
| 27 | Piping System27 | Repairoverhauling and reburbishment of BALL VV GLAND COPTBILGE PUMPDN PN 10 STDMATERIAL GUN METAL 25 NB |
| 28 | Piping System28 | Repairoverhauling and reburbishment of SDSL VV MER 32 NB |
| 29 | Piping System29 | Repairoverhaulingand reburbishment of SDSL FIRE MAIN SEA WATER MER DN PN 10 STD MATERIAL GUN METAL 125 NB |
| 30 | Piping System30 | Repairoverhaulingand reburbishment of SDSLSEA WATER AER DN PN 10 STD MATERIAL GUN METAL 150 NB |
| 31 | Piping System31 | Repairoverhaulingand reburbishment of SDSL SEA WATER MER DN PN 10 STD MATERIAL GUN METAL 50 NB |
| 32 | Piping System32 | Repairoverhauling and reburbishment of SDSL DA SEA WATER AER DN PN 10 STDMATERIAL GUN METAL 100 NB |
| 33 | Piping System33 | Repairoverhauling and reburbishment of SDSL FIRE MAIN SEA WATER AER DN PN 10 STD MATERIAL GUN METAL 125 NB |
| 34 | Piping System34 | Repairoverhauling and reburbishment of SDSL BILGE SUCTION AER DN PN 10 STD MATERIAL GUN METAL 80 NB |
| 35 | Piping System35 | Repairoverhauling and reburbishment of SDSL RO PLANT AER DN PN 10 STD MATERIAL GUN 32 NB |
| 36 | Piping System36 | Repairoverhaulingand reburbishment of SDSL RO PLANT AER DN PN 10 STDMATERIAL GUN25 NB |
| 37 | Piping System37 | Repairoverhauling and reburbishment of SDSL MER FO SYSTEM AER DN PN 10 STDMATERIAL GUN METAL 80 NB |
| 38 | Piping System38 | Repairoverhauling and reburbishment of SDSL MER LO SYSTEM MER DN PN 10 STDMATERIAL GUN METAL 50 NB |
| 39 | Piping System39 | Repairoverhauling and reburbishment of SDSL MER OWS SYSTEM MER DN PN 10 STDMATERIAL GUN METAL 50 NB |
| 40 | Piping System40 | Repair overhauling and reburbishment of SDSL A andC PUMP ROOM DN PN 10 STDMATERIAL GUN METAL 100 NB |
| 41 | Piping System41 | Repairoverhauling and reburbishment of SDSL FO SYSTEM MER DN PN 10 STD MATERIAL GUN METAL 40 NB |
| 42 | Piping System42 | Repairoverhauling and reburbishment of SDNR MER SEA WATER DN PN 10 STDMATERIAL GUN METAL150 NB |
| 43 | Piping System43 | Repairoverhauling and reburbishment of SDNR MER BILGE SUCTION DN PN 10 STDMATERIAL GUN METAL 50 NB |
| 44 | Piping System44 | Repairoverhauling and reburbishment of SDNR MER DA SEA WATERDN PN 10 STDMATERIAL GUN METAL65 NB |
| 45 | Piping System45 | Repairoverhauling and reburbishment of SDNR A & C CHILLED WATER A and C PUMP ROOM DN PN 10 STDMATERIAL GUN METAL 80 NB |
| 46 | Piping System46 | Repairoverhauling and reburbishment of SDNR RO PLANT AER DN PN 10 STDMATERIAL GUN METAL 25 NB |
| 47 | Piping System47 | Repairoverhauling and reburbishment of SDNR A and C CILLED WATERA and C PUMP ROOM DN PN 10 STDMATERIAL GUN METAL 80 NB |
| 48 | Piping System48 | Repairoverhauling and reburbishment of SDNR A and C CILLED WATERA and C PUMP ROOM DN PN 10 STDMATERIAL GUN METAL 80 NB |
| 49 | Piping System49 | Repairoverhaulingand reburbishment of SDNR A and C PUMP ROOM DN PN 10 STD MATERIAL GUN METAL 100 NB |
| 50 | Piping System50 | Repairoverhauling and reburbishment of SDNR A and C PUMP ROOM DN PN 10 STD MATERIAL GUN METAL 100 NB |
| 51 | Piping System51 | Repairoverhaulingand reburbishment of 3 WAY VV GLAND COMPT LO SYSTEM DN PN 10 STDMATERIAL GUN METAL20 NB |
| 52 | Piping System52 | Repairoverhauling and reburbishment of STORM VV STPENGWORKSHOP DN PN 10 STD MATERIAL GUN METAL ANGLE80 NB |
| 53 | Piping System53 | Repairoverhauling and reburbishment of STORM VV STPELECSTORE DN PN 10 STD MATERIAL GUN METAL ANGLE 100 NB |
| 54 | Piping System54 | Repairoverhauling and reburbishment of SDSL VV MER LO SYSTEM DN PN 10 STDMATERIAL GUN METAL 25 NB |
| 55 | Piping System55 | Repairoverhauling and reburbishment of A and C CHILLED WATER SDSL Valve 50 NB |
| 56 | Piping System56 | Repairoverhaulingand reburbishment of FRESH WATER SYSTEM SDSL Valve 50 NB |
| 57 | Piping System57 | Repairoverhauling and reburbishment of FRESH WATER SYSTEM SDNR Valve 40 NB |
| 58 | Piping System58 | Repairoverhaulingand reburbishment of FRESH WATER SYSTEM SDSL Valve 25 NB |
| 59 | Piping System59 | Repairoverhauling reburbishment of FIRE MAIN SYSTEM GATE Valve 125 NB |
| 60 | Piping System60 | Repairoverhauling and reburbishment of FIRE MAIN SYSTEM SDSL Valve 50 NB |
| 61 | Piping System61 | Repairoverhauling and reburbishment of FIRE MAIN SYSTEM SDNR Valve 65 NB |
| 62 | Piping System62 | Repairoverhauling and reburbishment of LUB OIL SYSTEM THREE WAY Valve 20 NB |
| 63 | Piping System63 | Repairoverhaulingand reburbishment of BALLAST SYSTEM GATE Valve 200 NB |
| 64 | Piping System64 | Repairoverhauling and reburbishment of A and C SEA WATER SYSTEM SDNR Valve 100 NB |
| 65 | Piping System65 | Repairoverhauling and reburbishment of A and C SEA WATER SYSTEM SDNRValve 25 |
| 66 | Piping System66 | Repairoverhauling and reburbishment of STORM VALVES 125 Valve NB |
| 67 | Piping System67 | Repairoverhauling and reburbishment of STORM VALVES 100 ValveNB |
| 68 | Piping System68 | Repair overhauling and reburbishment of STP SYSTEM GATE 80 Valve NB |
| 69 | Piping System69 | Repairoverhauling and reburbishment of STP SYSTEM GATE 100 Valve NB |
| 70 | Piping System70 | Repair overhauling and reburbishment of STP SYSTEM GATE Valve 125 |