Andaman Lakshadweep Harbour Works-ALHW has published Tender For Maintenance Of Departmental Building At Kochi For The Year 2022-2023. Submission Date for this Tender is 30-11-2022. Building Work Tenders in kochi Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 21-Nov-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 25-11-2022 |
2 | 25-Nov-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 28-11-2022 |
3 | 28-Nov-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 30-11-2022 |
Sl. No. | Item Description |
1 | Dismantling of damaged brick work, RCC, PCC etc. and disposing of the unserviceable materials within a lead of 300 mtrsincluding cost of all labour charges, tools etc. complete. |
2 | Cleaning the site/jungle including uprooting of vegitation brush wood, trees and levelling the grounds as per direction of engineer in charge etcincluding cost of all labour charges minor tools etc complete |
3 | Earth work excavation in all soils and filling in foundation etc. in 150 mm layers including cost of all labour charges, tools etc. complete. |
4 | Providing and laying CC 1:4:8 mix using 40 mm granite jelly forrepair work of compound wall of foundation culvert walletc. including cost of all labour charges, tools,cost of materials transportation of materials to the work site within a lead of 3 kms providing shuttering and centering wherever necessaryetc. complete. |
5 | Providing and laying RCC 1:2:4 mix using 20 mm granite jelly for repair works of cover slab of soak pit, drainage pit etc.etc. including cost of all labour charges, tools, cost of materials ,transportation of materials to the work site within a lead of 3 kms providing shuttering and centering wherever necessary , etc. complete. |
6 | Providing form work for RCC worksincluding cost of all labour charges, tools, cost of all materials, transportation of materials to the work site within a lead of 3 kmsetc. complete. |
7 | Fabrication and placing of m.s. rod grills for the RCC works including cutting, bending, tying and placing cost of binding wire etc.including cost of all labour charges, tools,cost of all steeletc. complete. |
8 | Brick masonry in C.M.1:6 for foundation & basement works of compound wall and culvert wall including all labour charges, cost of all materials,transportation charges, minor toolsetc. complete. |
9 | Providing C.C. 1:2:4 forfloor at office back side including cost of all materials , cost of all labour charges minor tools, transportation charges, shuttering charges etc, complete. |
10 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead,including cost of all labour charges, minor tools etc complete |
11 | Providing and fixing fully panelled door with 10 x 8 cms size frame and 4 cms shutters single hung made out of hard wood timber (Karimarithu / irul) including cost of all labour charges, tools, cost of timber, all standard fittings and fixtures as directed by the Engineer -in-charge, etc., complete. |
12 | Providing and fixing fully glazedwindow with 10 x 8 cms size frame and 4 cms shutters single hung made out of hard wood timber (Karimarithu / irul) including cost of all labour charges, tools, cost of timber, all standard fittings and fixtures as directed by the Engineer -in-charge, etc., complete. |
13 | Dismantling and removing of damaged EWC pan along with the complaint flushing cyctern without causing any damages to the connections to the septic Tankand disposing the dismantling materials with in a lead of 50 m including cost of all labour charges minor tools etc.complete. |
14 | Providing and fixing wash down water closet (European type WC) with integral "P" or "S" trap including jointing the trap withpipe in cement mortar 1:1 (one cement and one fine sand) and making good the same and connecting the EWC with the septic tank connect pipe , including cost of EWC and all connected materials , cost of all labour charges , minor tools and plants etc .complete. |
15 | Providing and fixing 12.5 ltrs low level flushing cistern with a pair of C.I or M.S. brackets complete with fittings such as lead valve 15mm nominal size ball valve with polythene float, unions and couplings for connection with inlet, outlet and over flow pipes, 40 mm dia porcelain enameled fush bend including cuttings holes in walls where ever necessary and making good the same and connecting the flush bend with cistern and closet , including cost of flushing cycstern and all connected materials , cost of all labour charges , minor tools and plants etc .complete. |
16 | Providingand fixing wash basin midium type with all fittings single hose for pillow cap with c for MS Brackets etc including cost of all materials and labour charge etc complete. |
17 | Cleaning over head water tank of departmental quarters and office including removing the water, cleaning the inside etc.as directed by the EIC including cost of all labour charges, tools etc. complete. 500/1000litre capacity |
18 | Providing and fixing of PVC Door Shutter with PVC Chowket to the existing opening using Hold fast/anchor bolt/ screws etcincluding cost of allmatirials cost of PVC Doors shutter and chowket, all labour charges, minor tools and plants etc.complete. |
19 | Cleaning rain water harvesting tanksof departmental quartersincluding removing the water, filter media, cleaning and refiling th filter media with fresh materials like coconut husk fibre, 20mm gravel, charcol made out of coconut shell etc.as directed by the EIC including cost of all labour charges, tools, all materials etc. complete. |
20 | Plastering with C.M. 1:3, 6mm thick with one cement, four river sand for exposed masonry & R.C.C. works including cost of all labour charges, transportation charges, minor tools,cost of materialsetc. complete. |
21 | Dismantling and removing tiles in floor and wall tile including disposing of the debris within 50 mtrs lead including cost of all labour charges, cost of minor tools and plants etc complete. |
22 | Painting two coats with exterior Emulsion paint on the wall at office building and residential building including scaffolding, cost of all labour charges, tools cost of all materialsetc. complete. |
23 | Painting two coats with enamelpaint on the doors and windows at office building and residential building including scaffolding, cost of all labour charges, tools cost of all materialsetc. complete. |
24 | Dadoing Ist quality Ceramic glazed wall tiles confirming to IS 13753 of minimum thicknes10mm of approved make like Nitco, Orient, Somany, Kajaria, or equivalent make in all colours for flooringover CM 1:3, 12 mm thick including intermediate filling of the tiles with matching pigment etc., as directed by the Engineer-in-charge, including transportation of all materials to work site, all labour charges, tools cost of all materials, placing of cement mortor, laying tiles etc., complete |
25 | Repairing damaged window shutter by providing required timber, glass panels, hinges, Handle tower bolt etc including cost of all materials and labour charge etc complete. |
26 | Repairing damaged Door shutter as per direction of engineer in charge by providing required hinged, handle, tower bolt etc including cost of all materials and labour charge etc complete. |
27 | Repairing damaged window shutter by providing required hinged,handle,tower bolt etc including cost of all materials and labour charge etc complete. |
28 | Removingdamaged A.C. sheet / G.I. sheet roofing with L hooks and washer including cost of all labour charges, tools, transportation stacking of removed sheetswithin a lead of 3 kmsetc. complete. |
29 | Steel fabrication for roof truss Gindal or equivalent type coated tubes / sections in various sizes, including cutting, hoisting.Fixing in position applying one primer coat followed by two coats of paints and welded with bolts and nuts etc, including cost of all labour charges minor tools, transportation, fixing charges cost of all labour charges all materials etc, complete. |
30 | Providing G.I. coated corrugated sheet 05 mm thick for roofing forold office building roof with hooks, bolts & nuts.Self drilling, tapping screws etc, including cost of all labour charges minor tools, scaffolding.cost of materials etc, but excluding cost of purline, rafters, trusses fabrication which will be paid seperatly. |
31 | Replacing Existing water supply syntex tank 750 ltr to 1000 ltrat office building including cost of all labour charges minor toolscost of 1000 ltr syntex tank with all fittings etc complete |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail