| 1 | A. 1 KLD Capacity: Civil Units: |
| 2 | Screen Chamber & O &GSize : 0.5 M x 0.5 M x 0.5 M &1M X 0.5M X 0.8 M |
| 3 | EffluentCollection Tank / Equalization TankSize : 2 m3 |
| 4 | Flash Mixture&Flocculation Tank &P-T- Primary Tube settling or settling tank Size : 100 Ltr tank &100 Ltr Tank, P-T -200 LTR ( Primary tube settler) |
| 5 | FAB Reactor/MBBR Tank Size:1 m3 |
| 6 | Secondary Settling tankSize:200 LTR |
| 7 | Filter feed Tank/permeate tankSize:200 LTR |
| 8 | Treated Water TankSize:500 LTR |
| 9 | SLUDGE BEDSize:200 LTR |
| 10 | B. 1 KLD Capacity: Mechanical Equipment: |
| 11 | Bar screenSize/Capacity500mm x 500 mm |
| 12 | Raw Sewage Transfer Pump- Submersible Pump Size/Capacity0.5 m3/hr @ 10-12 m head |
| 13 | Sludge Transfer Pump to transfer the sludge from tube settler to sludge drying bed.Size/Capacity0.5 m3/hr @ 10 m head |
| 14 | Filter feed PumpProviding, Fixing, Testing & Commissioning of horizontal, centrifugal pump. Size/Capacity1m3/hr @ 30 m head |
| 15 | Pressure Sand Filter (PSF) to transfer filter feed tank water into Sand filter Size/Capacity10 Inch dia x 54 Inch ht. |
| 16 | Activated Carbon Filter (ACF)- to remove the color of treated water Size/Capacity10 Inch dia x 54 Inch ht. |
| 17 | Chlorine Dosing Tank Size/Capacity100 litres capacity |
| 18 | JET AERATORSize/Capacity0.5 HP |
| 19 | PanelDesign , Fabrication, Assembling, Wiring, supply, Installation, testing and commissioning Size/CapacityAll wiring should be run through suitable gland & conduit pipe. |
| 20 | Providing and fixing all piping and isolation control valves a) UPVC Epoxy (Schedule 40 )-All PipelineSize/CapacitySchedule 40- make Ashirvad/Astral |
| 21 | Canopy & Stand Size/CapacityAll Blower, pump, sholud be covered by canopy |
| 22 | Flow Line marking Size/CapacityAll line sholud be marked with Red & blue sticker. |
| 23 | Dosing tank -100 ltr – Manual tap dosing for alum & PolySize/CapacityFRP/HDPE |
| 24 | pH meter as per PCB normsSize/CapacityStandard |
| 25 | AMC cost after warranty period of 2 years |