noida metro rail corporation limited has published Tender For Rate Contract Of Automatic Linear Pneumatic Tube Detection Based Novec 1230 System For Electrical Equipments (Gas Flooding System) For 3 Years.. Submission Date for this Tender is 22-11-2022. Connectors Supply Tenders in noida Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Gas Flooding system installed in the electrical panels and transformer. |
2 | Refilling & testing of 5 lb cylinder of Novec 1230 System. |
3 | Refilling & testing of 9 kg cylinder of Novec 1230 System. |
4 | Refilling & testing of 12 kg cylinder of Novec 1230 System. |
5 | Refilling & testing of 15 Kg cylinder of Novec 1230 System. |
6 | Refilling & testing of 16 Kg cylinder of Novec 1230 System. |
7 | Refilling & testing of 101 kg System ("SEVO SYSTEM") in AFC central workstation room(test lab) room at RS Depot |
8 | Refilling & testing of 126 kg System ("SEVO SYSTEM") in CSS room at RS Depot |
9 | Refilling & testing of 105 kg System ("SEVO SYSTEM") in SDC server room at RS Depot |
10 | Supply,Installation, Testing and commissioningof Master control unit set (MCU) of make SVS buildwell pvt ltd or equivalent compatible with existing system complete etc as required. |
11 | Nitrogen gas Charging and maintain pressure (195 psi)as per requirement |
12 | Supply, Installation, Testing and commissioning of Hooter cum flasher of SVS Buildwell pvt ltd or equivalent make compatible with existing system complete etc as required. |
13 | Supply, Installation, Testing and commissioning of straight connector compatible with existing system complete etc as required. |
14 | Supply, Installation, Testing and commissioning of Pressure switch compatible with existing system complete etc as required. |
15 | Supply, Installation, Testing and commissioning of Pressure Gauge as per IS 3624-1987 complete etc as required. |
16 | Supply, Installation, Testing & commissioning of polymer/polyamide Linear heat detection tube (Fire Trace/Sevo systems or equivalent make)compatible with existing system complete etc as required. |
17 | Supply, Installation, Testing & commissioning of Tee Connector and/or Jointer compatible with existing system complete etc as required. |
18 | Supply,Installation, Testing & commissioning of End plug compatible with existing system complete etc as required. |
19 | Supply,Installation, Testing & commissioning of End of line adaptor compatible with existing system complete etc as required. |
20 | Supply,Installation, Testing & commissioning ofdifferential valve which is UL/FM/CE listed and UL/FM/CE marked with the following specifications: - It should operate on sensing the drop in the pressure. –The valve shall have provision for connecting pressure switch, Pressure gauge, filling in adapter. UL/FM/CE listed & UL/FM/CE marked |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy