}

Tender For Extending Of 100 Mtrs Of Street Light Line From Complex Towards Garage And Relaying Of 100 Mtrs Of Collapsed Lt Line Connected To Tc No.3 At Gerusoppa Project-Karnataka

Karnataka Power Corporation Limited has published Tender For Extending Of 100 Mtrs Of Street Light Line From Complex Towards Garage And Relaying Of 100 Mtrs Of Collapsed Lt Line Connected To Tc No.3 At Gerusoppa Project. Submission Date for this Tender is 29-10-2022. Bolts Tenders in Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

34376533
Tender For Extending Of 100 Mtrs Of Street Light Line From Complex Towards Garage And Relaying Of 100 Mtrs Of Collapsed Lt Line Connected To Tc No.3 At Gerusoppa Project
Open Tender
Indian
Karnataka
29-10-2022

Tender Details

Supply And Shifting Of Pscc Poles, Acsr Conductors, Lt 2 Pin Gi Cross Arms With Bolt & Nuts, Strain Insulators, Pin Insulators, Gauy Sets, Led Street Light Fittings Of 70W And 90W With Bend Pipes And Suitable Clamps And All The Materials Required To Complete The Work To Work Spot.2.Digging Of Pits For Pscc Poles / Gauys And Erection Of Poles Along With Cross Arms, Single Top Supports, Pole Clamps And Gauys. 3.Fixing Of Pin / Strain Insulators. Stringing Of Conductors Including Pin Binding, Winding Jumps And Terminating At Strain Insulators Etc.4.Fixing Of Gauy Set To Erected Poles With Break Insulators Making Use Of 7 / 3.15Mm Galvanized Steel Wire With Turn Buckle And Anchoring Arrangement.5.Fixing Of 70W And 90W Led Street Light Fittings With Surge Protectors With Bend Pipes And Suitable Clamps, Bolts, Nuts And Wiring To Erected Poles. 6.The Contractor Has To Establish The Lt Network In Complete To Extended Part Of Existing Lt Lines Of Tc No.3 And Test Charge The Lines Before Handing Over To Kpcl.7.It Is The Responsibility Of The Contractor To Store The Supplied The Materials / Equipments Till The Completion Of The Work. It Is The Responsibility Of Contractor To Make Compensation To Public In The Case Of Damages Caused To Public Property While Execution Of The Work.8.The Contractor Has To Work In Co-Ordination With The Concerned Kpcl Staff For Line Clearance On Line. He Shall Plan And Co-Operate Accordingly While Executing The Works.9.The Tools And Tackles Required To Execute And Complete The Work Like Chain Pulley / Rope Etc. Has To Be Supplied By Contractor.10.Contractor Has To Take All The Safety Precautions While Executing The Work And To Provide Necessary Safety Equipments And To Ensure Usage By Their Workers Wherever Necessary. He Has To Deploy The Workmen Only After Confirmation Of Line Clearance On Lt Line. The Safety Of The Workmen And Timely Completion Of The Work Is The Responsibility Of The Contractor. 11.The Scope Of Work Covers Any Other Material / Works Whether Included Or Not To Complete The Work Of Extending Of 100 Mtrs Of Street Light Line From Complex Towards Garage And Relaying Of 100 Mtrs Of Collapsed Lt Line Connected To Tc No.3 At Gerusoppa Project. Extending Of 100 Mtrs Of Street Light Line From Complex Towards Garage And Relaying Of 100 Mtrs Of Collapsed Lt Line Connected To Tc No.3 At Gerusoppa Project

Key Value

Document Fees
INR 500 /-
EMD
INR 2680.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail