Supply, Installation, Commissioning, Operation And Transfer Of Effluent Treatment Plants (Etp) Of The Following Capacities For The Corresponding Government District Hospitals. Supply, Installation, Commissioning, Operation And Transfer Of Effluent Treatment Plants (Etp) Of The Following Capacities For The Corresponding Government District Hospitals. , A. 10 Kld Capacity: Civil Units: , Screen Chamber & O &G Size : 0.5 M X 0.5 M X 0.5 M & 1M X 0.5M X 0.8 M , Effluentcollection Tank / Equalization Tank Size : 5 M3 , Flash Mixture& Flocculation Tank & P-T- Primary Tube Settling Or Settling Tank Size : 100 Ltr Tank& 100 Ltr Tank, P-T -2 M3 ( Primary Tube Settler)- , Fab Reactor/Mbbr Tank Size: 4 M3 , Secondary Settling Tank Size: 2 M3 , Filter Feed Tank/Permeate Tank Size: 1 M3 , Treated Water Tank Size: 1 M3 , Sludge Bed Size: 1 M3 , B. 10 Kld Capacity: Mechanical Equipment: , Bar Screen Size/Capacity 500Mm X 500 Mm , Raw Sewage Transfer Pump- Submersible Pump Size/Capacity 0.5 M3/Hr @ 10-12 M Head , Sludge Transfer Pump To Transfer The Sludge From Tube Settler To Sludge Drying Bed. Size/Capacity 0.5 M3/Hr @ 10 M Head , Filter Feed Pump Providing, Fixing, Testing & Commissioning Of Horizontal, Centrifugal Pump. Size/Capacity 1M3/Hr @ 30 M Head , Pressure Sand Filter (Psf) Size/Capacity 13 Inch Dia X 54 Inch Ht. , Activated Carbon Filter (Acf) Size/Capacity 13 Inch Dia X 54 Inch Ht. , Chlorine Dosing Tank With Dosing Pump Having Capacity Of 0-6 Lph. Size/Capacity 100 Litres Capacity , Air Blower - Twin Lobe Air Cooled Blower Size/Capacity 40 M3/Hr @4000 Mm Wc , Motor For Air Blower Size/Capacity 2 Hp /1450 Rpm , Air Diffusers Coarse, 4 No. In Mbbr Tank Epdm On Pvc Pipe, 3 No. Disc Type In Collection Tank-80Mm. Size/Capacity Disc Base 80 Mm 5 M3/Hr Air Flow & 63 Mm Od & 610 Mm Length Epdm , Fab Media & Tube Deck Media Size/Capacity Size 16 X 22 Mm& 710 Mm Height , Panel Design, Fabrication, Assembling, Wiring, Supply, Installation, Testing And Commissioning Fabricated Out Of 16 Guage Crca Sheet Size/Capacity All Wiring Should Be Run Through Suitable Gland & Conduit Pipe. , Providing And Fixing All Piping (As Described Below) And Isolation Control Valves A) Upvc Epoxy (Schedule 40 )-All Pipeline Size/Capacity Schedule 40 , Canopy & Stand Size/Capacity All Blower, Pump, Sholud Be Covered By Canopy, And Stand To Avoid Raining Loss. , Flow Line Marking Size/Capacity All Line Sholud Be Marked With Red & Blue Sticker. , Dosing Tank -100 Ltr – Manual Tap Dosing For Alum & Poly Size/Capacity Frp/Hdpe , Ph Meter As Per Pcb Norms Size/Capacity Standard , Amc Cost After Warranty Period Of 2 Years