| 1 | Excavation and trenching up to a depth of 1.65 m and back filling the excavated trenches after laying the HDPE/PLB pipe with or without protection as per Tender specification. |
| 2 | i) In Kuchcha soil (manually) |
| 3 | ii) In pucca soil |
| 4 | iii) In Rocky soil (Soft) |
| 5 | iv) In Rocky soil (Hard) |
| 6 | Excavation & trenching including tunneling or boring and reinstatement as per construction specification of the tender to a depth of 2.0 meter or more in Bituminized/Concrete/Set Stone(rate per meter) for Single PLB pipe. |
| 7 | Laying of PLB HDPE duct by HDD method at a depth of 2.0 m or more (for single PLB pipe). |
| 8 | Laying of PLB HDPE Pipe/G.I. Pipe/RCC Pipe/DWC |
| 9 | Laying of single PLB HDPE Pipes/Coils, coupled with coupler |
| 10 | Laying and fixing of G.I, pipes(Medium duty class having inner diameter of 50mm, as per ISI Specifications) in trenches with PLB HDPE Pipes/Coils inside |
| 11 | Laying and fixing G.I pipes (Medium duty class having inner diameter of 50mm, as per ISI Specifications)in trenches on Bridges and Culverts withPLB HDPE Pipes /Coils inside |
| 12 | Laying of full round RCC(ISI mark) DWC pipe (as per existing TEC GR no. GR/DWC.34/01 Sep.2007 with latest amendments) in trenches over PLB HDPE pipes/coils, on Culverts/Bridges/Nulla and for cases where cable is laid at less depth (wherever required). |
| 13 | Laying ofsplit RCC(ISI Mark)/DWC pipe (as per existing TEC GR no. GR/DWC.34/01 Sep.2007 with latest amendments) in trenches over PLB HDPE pipes/coils, onCulverts/Bridges/Nulla and for cases where cable is laid at less depth (wherever required). |
| 14 | Providing cement concrete 1:2:4 at Wheel guard of bridge/culvert over the toe or in the trench for protection. |
| 15 | Providing cement concrete 1:2:4 over the PLB HDPE Pipe with wire mesh in the trenches for protection, where the depth is less than 120 Cms.(Cement Concrete as per specification) |
| 16 | Cable laying by pulling/blowing |
| 17 | Laying of OF Cable by Pulling/blowing method including opening of Manhole, Sealing of PLB HDPE Pipes by |
| 18 | Splicing of Cable |
| 19 | Splicing of Fibers in Existing/New Joint Chambers for making Straight/Branch joints on new routes or at FPOI and end to end testing of all Fibers after Splicing. Installation rate is included. |
| 20 | 288 Fiber |
| 21 | 96 Fiber |
| 22 | 48 Fiber |
| 23 | 24 Fiber |
| 24 | 12 Fiber |
| 25 | 6 Fiber |
| 26 | 2F/4F OF cable |
| 27 | Splicing of all the fibers of 24 F OF cable in the Fiber Termination Box at the Gram Panchayats and testing all the fibers for continuity. This will also include installation/mounting of the FTB as specified. |
| 28 | 288 Fiber |
| 29 | 96 Fiber |
| 30 | 48 Fiber |
| 31 | 24 Fiber |
| 32 | 12 Fiber |
| 33 | 6 Fiber |
| 34 | 2F/4F OF cable |
| 35 | Jointing Chamber |
| 36 | Construction of Bricks joints chamber as per specification and the construction practice as specified in the tender document. |
| 37 | Construction of pre fabricated RCC joints chamber as per specification and the construction practice as specified in the tender document. |
| 38 | Route Indicator |
| 39 | Supply and fixing of RCC/Stone route/joint indicator by |
| 40 | Restoration of Road Surface |
| 41 | Road restoration work with bituminous macadam for semi grouting 50 mm thick and premix carpet surfacing 25 mm including supply of asphalt etc to evenly match the road, including consolidation and rolling as per standard specification of DSR 1997. |
| 42 | Road restoration work with cement concrete 1:4:8 mix for thickness varying from 150 mm to 225 mm, including supply of concrete to evenly match the road. |
| 43 | Route Index Diagram |
| 44 | Supply of route index diagram in hard as well as soft copy on CD for complete Block. |
| 45 | Videography of the route on which cable is laid. |
| 46 | Laying OF Cable in building (Leading in work) |
| 47 | Laying of OF Cable in corridor/rises/exchange premises with material |
| 48 | Installation of Splitter Box/FTB |
| 49 | Installation of splitter box/fibre termination box inside the Building/Tower/Complex |
| 50 | Recovery of Store |
| 51 | Recovery of empty 24 F Cable Drum |