Kerala Minerals And Metals Limited has published Amc For Ac / Frp / Polymer / Mettallic Sheet Roofing And Re-Roofing Works In Plant And Non Plant Areas 2022-2023 Dismantling Ac / Frp Sheet Roofing, Fixing Ac / Frp / Polymer / Metallic Corrugated Roof Sheets, Fixing Side Cladding, Repalcing Damaged Bolt. Submission Date for this Tender is 15-10-2022. Bolts Tenders in chavara Kerala. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Demolish AC/FRP/PVC sheet in roofing/cladding/walling/louvers partly or completely including removal of debris away from the site to scrap yard , all type polycoated bolts,nuts and washer, labour charges,scaffolding charges,tools, tackles etc complete at all heights and upto a lead of 500m] |
2 | Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and lowering and stacking reusable material within 500 metres lead including tools & tackles, labours, scaffolding etc all. Up to 10m level. |
3 | Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and loweringand stacking reusable material within 500 metres lead including tools & tackles, labours, scaffolding etc all. From 10mtr to 20mtr level |
4 | Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and lowering and stacking reusable material within 500 metres lead including tools & tackles, labours, scaffolding etc all. from 20mtr to 30mtr level |
5 | Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and loweringand stacking reusable material within 500 metres lead including tools & tackles, labours, scaffolding etc all. from 30mtr to 40mtr level |
6 | Dismantlingexisting AC/FRP sheet walling carefully including removal ofall type polycoated bolts,nuts and washer etc; all labour charges,scaffolding charges etc; clearing the debris away from the site to scrap yard and loweringand stacking reusable material within 500 metres lead complete.;For level upto 10m from GL, including tools ; tackles, labours, scaffolding etc all. |
7 | Dismantlingexisting AC/FRP sheet walling carefully including removal ofall type polycoated bolts,nuts and washer etc; all labour charges,scaffolding charges etc; clearing the debris away from the site to scrap yard and loweringand stacking reusable material within 500 metres lead complete.;For level from 10 m upto 20 m from GL, including tools tackles, labours, scaffolding etc all. |
8 | Dismantlingexisting AC/FRP sheet walling carefully including removal ofall type polycoated bolts,nuts and washer etc; all labour charges,scaffolding charges etc; clearing the debris away from the site to scrap yard and loweringand stacking reusable material within 500 metres lead complete.;For level from20 to 30 from GL, including tools ; tackles, labours, scaffolding etc all. |
9 | Dismantlingexisting AC/FRP sheet walling carefully including removal ofall type polycoated bolts,nuts and washer etc; all labour charges,scaffolding charges etc; clearing the debris away from the site to scrap yard and loweringand stacking reusable material within 500 metres lead complete.;For level from 30 m upto 40m from GL, including tools ; tackles, labours, scaffolding etc all. |
10 | Dismantlingexisting AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers and stacking the material within 500 mlead.For level upto 10 m from GL including tools, tackles, labours, scaffolding etc all. |
11 | Dismantlingexisting AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers and stacking the material within 500 mlead.<br>For level from 10m upto 20 m from GL including tools, tackles, labours, scaffolding etc all. |
12 | Dismantlingexisting AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers and stacking the material within 500 mlead.;For level from 20m upto 30 m from GL including tools, tackles, labours, scaffolding etc all. |
13 | Dismantlingexisting AC/FRP/PVC Valley gutters/Ridges/barge boards/louvers and stacking the material within 500 mlead.;For level from 30m upto 40 m from GL including tools, tackles, labours, scaffolding etc all. |
14 | Dismantling old plaster or skirting raking out joints and cleaning the surface for re plaster including disposal of rubbish to the dumping ground within 500 metres lead including tools & tackles, labours, scaffolding etc all..;For level upto 10m from GL |
15 | Dismantling old plaster or skirting raking out joints and cleaning the surface for re plaster including disposal of rubbish to the dumping ground within 500 metres lead including tools & tackles, labours, scaffolding etc all..For level from 10m upto 20m from GL |
16 | Dismantling old plaster or skirting raking out joints and cleaning the surface for re plaster including disposal of rubbish to the dumping ground within 500 metres lead including tools & tackles, labours, scaffolding etc all..;For level from 20m upto 30m from GL |
17 | Dismantling old plaster or skirting raking out joints and cleaning the surface for re plaster including disposal of rubbish to the dumping ground within 500 metres lead including tools & tackles, labours, scaffolding etc all..;For level from 30m upto 40m from GL |
18 | Dismantling and removing existing damaged tar felt over the roofing area and cleaning the surface neatly and dispode the waste within 500 metres lead and supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports as per the specifications directed by the company representatives and ensure leak proofincluding cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.<br>For level upto 10m from GL |
19 | Dismantling and removing existing damaged tar felt over the roofing area and cleaning the surface neatly and dispode the waste within 500 metres lead and supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports as per the specifications directed by the company representatives and ensure leak proofincluding cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete. ;For level From 10m to 20mtr |
20 | Dismantling and removing existing damaged tar felt over the roofing area and cleaning the surface neatly and dispode the waste within 500 metres lead and supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports as per the specifications directed by the company representatives and ensure leak proofincluding cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.For level From 20m to 30mtr |
21 | Dismantling and removing existing damaged tar felt over the roofing area and cleaning the surface neatly and dispode the waste within 500 metres lead and supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports as per the specifications directed by the company representatives and ensure leak proofincluding cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete ;For level From 30m to 40mtr |
22 | Fixing asbestos corrugated sheets (New/Old) upto any pitch in horizontal /vertical / curved surfaceswith polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers etc. complete (excluding the cost of purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)including shifting, lifting, cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.;For level upto 10m from GL |
23 | Fixing asbestos corrugated sheets (New/Old) upto any pitch in horizontal /vertical / curved surfaceswith polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers etc. complete (excluding the cost of purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)including shifting, lifting, cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.;For level from 10m to 20mtr |
24 | Fixing asbestos corrugated sheets (New/Old) upto any pitch in horizontal /vertical / curved surfaceswith polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers etc. complete (excluding the cost of purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)including shifting, lifting, cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.;For level from 20m to 30mtr |
25 | Fixing asbestos corrugated sheets (New/Old) upto any pitch in horizontal /vertical / curved surfaceswith polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers etc. complete (excluding the cost of purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)including shifting, lifting, cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.;For level from 30m to 40mtr |
26 | Fixing FRP/poly carbonate/PVC /metallic sheets upto any pitch in horizontal /vertical / curved surfaces and fixing with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers or sheets shall be fixed using self drilling / self tapping<br>screw of size (5.5X55mm) with EPDM seal complete , but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required. etc. complete (excluding cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company), including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.;For level upto 10m from GL |
27 | Fixing FRP/poly carbonate/PVC/metallic sheets upto any pitch in horizontal /vertical / curved surfaces and fixing with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers or sheets shall be fixed using self drilling / self tapping<br>screw of size (5.5X55mm) with EPDM seal complete , but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required. etc. complete (excluding cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company), including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.;For level from 10mtr to 20mtr. |
28 | Fixing FRP/poly carbonate/PVC /metallic sheets upto any pitch in horizontal /vertical / curved surfaces and fixing with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers or sheets shall be fixed using self drilling / self tapping<br>screw of size (5.5X55mm) with EPDM seal complete , but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required. etc. complete (excluding cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company), including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc. For level from 20mtr to 30mtr. |
29 | Fixing FRP/poly carbonate/PVC /metallic sheets upto any pitch in horizontal /vertical / curved surfaces and fixing with polymer coated J, or L hooks, bolts and nuts 8mm dia. G.I. plain and bitumen washers or sheets shall be fixed using self drilling / self tapping<br>screw of size (5.5X55mm) with EPDM seal complete , but excluding the cost of purlins, rafters, trusses, and including cutting to size and shapes where ever required. etc. complete (excluding cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company), including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.;For level from 30mtr to 40mtr. |
30 | Fixing AC/FRP/PVC/metallic ridges and hips AC/FRP/PVC/metallic valleys and bargesfixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers including shifting,lifting,tools & tackles, labours, scaffolding etc inroofing with suitable fixing accessories or self drilling fastener and EPDM washer etc.(excluding the cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)<br>Corrugated serrated adjustable ridges including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.;Level upto 10 m |
31 | Fixing AC/FRP/PVC/metallic ridges and hips AC/FRP/PVC/metallic valleys and bargesfixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers including shifting,lifting,tools & tackles, labours, scaffolding etc inroofing with suitable fixing accessories or self drilling fastener and EPDM washer etc.(excluding the cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)<br>Corrugated serrated adjustable ridges, including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 10mtr to 20mtr |
32 | Fixing AC/FRP/PVC/metallic ridges and hips AC/FRP/PVC/metallic valleys and bargesfixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers including shifting,lifting,tools & tackles, labours, scaffolding etc inroofing with suitable fixing accessories or self drilling fastener and EPDM washer etc.(excluding the cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)<br>Corrugated serrated adjustable ridges, including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.;For level from 20mtr to 30mtr |
33 | Fixing AC/FRP/PVC/metallic ridges and hips AC/FRP/PVC/metallic valleys and barges fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers including shifting,lifting,tools & tackles, labours, scaffolding etc in roofing with suitable fixing accessories or self drilling fastener and EPDM washer etc.(excluding the cost of sheet, purlins, rafters and trusses.The required sheet and fixtures shall be supplied by the company)Corrugated serrated adjustable ridges, including shifting, lifting,cutting sheets to size and shape wherever required,all tools,tackles, labours, scaffolding etc.For level from 30mtr to 40mtr |
34 | Replacing thedamaged L/J bolts , polycoated bolts of AC / FRP sheet roofing, side cladding ridges, barge board with new special type polycoated bolts, nuts,washers ctc. After rearranging the required overlap as per the instruction of the company representatives and collecting reusable poly coated bolts including all labour charges, scaffolding charges etc.complete (excluding cost of special type poly coated bolts, nuts washers etc.)including tools & tackles, labours, scaffolding etc all.For level upto 10m from GL |
35 | Replacing thedamaged L/J bolts , polycoated bolts of AC / FRP sheet roofing, side cladding ridges, barge board with new special type polycoated bolts, nuts,washers ctc. After rearranging the required overlap as per the instruction of the company representatives and collecting reusable poly coated bolts including all labour charges, scaffolding charges etc.complete (excluding cost of special type poly coated bolts, nuts washers etc.)including tools & tackles, labours, scaffolding etc all.;For levelfrom 10mtr to 20mtr |
36 | Replacing thedamaged L/J bolts , polycoated bolts of AC / FRP sheet roofing, side cladding ridges, barge board with new special type polycoated bolts, nuts,washers ctc. After rearranging the required overlap as per the instruction of the company representatives and collecting reusable poly coated bolts including all labour charges, scaffolding charges etc.complete (excluding cost of special type poly coated bolts, nuts washers etc.)including tools & tackles, labours, scaffolding etc all.For levelfrom 20mtr to 30mtr |
37 | Replacing thedamaged L/J bolts , polycoated bolts of AC / FRP sheet roofing, side cladding ridges, barge board with new special type polycoated bolts, nuts,washers ctc. After rearranging the required overlap as per the instruction of the company representatives and collecting reusable poly coated bolts including all labour charges, scaffolding charges etc.complete (excluding cost of special type poly coated bolts, nuts washers etc.)including tools & tackles, labours, scaffolding etc all. For levelfrom 30mtr to 40mtr |
38 | Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall with 12 mm cement plaster of mix. 1:3 (1 cement : 3 fine sand). including tools & tackles, labours, scaffolding etc all.For level upto 10m from GL(Cement shall be supplied by the company) |
39 | Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall with 12 mm cement plaster of mix. 1:3 (1 cement : 3 fine sand). including tools & tackles, labours, scaffolding etc all.;For level from 10m to 20mtr(Cement shall be supplied by the company) |
40 | Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall with 12 mm cement plaster of mix. 1:3 (1 cement : 3 fine sand). including tools & tackles, labours, scaffolding etc all. For level from 20m to 30mtr(Cement shall be supplied by the company) |
41 | Plastering the sides of sorrounding structural column support or edge between AC sheet with masonry wall with 12 mm cement plaster of mix. 1:3 (1 cement : 3 fine sand). including tools & tackles, labours, scaffolding etc all. ;For level from 30m to 40mtr(Cement shall be supplied by the company) |
42 | Clearing away disposal over roofs at different levels including disposal of debris within 500m including tools & tackles, labours, scaffolding etc all. ;For level upto 10m from GL |
43 | Clearing away disposal over roofs at different levels including disposal of debris within 500m including tools & tackles, labours, scaffolding etc all.;For level upto 20m from 10m level |
44 | Clearing away disposal over roofs at different levels including disposal of debris within 500m including tools & tackles, labours, scaffolding etc all.;For level upto 30m from 20m level |
45 | Clearing away disposal over roofs at different levels including disposal of debris within 500m including tools & tackles, labours, scaffolding etc all. For level upto 40m from 30m level |
46 | Fixing AC/FRP louvers fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 1.60 mm thick with zinc coating not less than 350 gm/ m2, including shifting,lifting, tools & tackles, labours, scaffolding etc all.(excluding the cost of sheet, purlins, rafters and trusses,the required sheet and fixtures shall be supplied by the company);For level upto 10m from GL |
47 | Fixing AC/FRP louvers fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 1.60 mm thick with zinc coating not less than 350 gm/ m2, including shifting,lifting, tools & tackles, labours, scaffolding etc all.(excluding the cost of sheet, purlins, rafters and trusses,the required sheet and fixtures shall be supplied by the company) . For level from 10mtr to 20mtr |
48 | Fixing AC/FRP louvers fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 1.60 mm thick with zinc coating not less than 350 gm/ m2, including shifting,lifting, tools & tackles, labours, scaffolding etc all.(excluding the cost of sheet, purlins, rafters and trusses,the required sheet and fixtures shall be supplied by the company); For level from 20mtr to 30mtr |
49 | Fixing AC/FRP louvers fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 1.60 mm thick with zinc coating not less than 350 gm/ m2, including shifting,lifting, tools & tackles, labours, scaffolding etc all.(excluding the cost of sheet, purlins, rafters and trusses,the required sheet and fixtures shall be supplied by the company) ;For level from 30mtr to 40mtr |
50 | Clearing away the deposit over the valley gutters at all levels including disposal of debris within 500m.; Level upto 10 m |
51 | Clearing away the deposit over the valley gutters at all levels including disposal of debris within 500m. ;Level upto 20 m from 10 mtr |
52 | Clearing away the deposit over the valley gutters at all levels including disposal of debris within 500m.;Level upto 30 m from 20 mtr |
53 | Clearing away the deposit over the valley gutters at all levels including disposal of debris within 500m. ;Level upto 40 m from 30 mtr |
54 | Extra for circular cutting in AC/FRP corrugated sheet roofing for making openings for any height for making openings of area exceeding 40 square decimeter. |
55 | Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports after surface preparation as per the specifications directed by the company representatives and ensure leak proofincluding cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.;For level upto 10m from GL |
56 | Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports after surface preparation as per the specifications directed by the company representatives and ensure leak proofincluding cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.;For level from 10mtr to 20mtr |
57 | Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports after surface preparation as per the specifications directed by the company representatives and ensure leak proofincluding cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete.;For level from 20mtr to 30mtr |
58 | Supply and apply tar felt with roofing compounds on sides, surroundings of structural column supports after surface preparation as per the specifications directed by the company representatives and ensure leak proofincluding cost and conveyance of all materials,all labour charges, scaffolding charges etc. complete ;For level from 30mtr to 40mtr |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail