}

Electricity Line Construction & Other Related Works For Issued Of New Electricity Connections Under Deposit Scheme In The Jurisdiction Of Edsd-Ii, Hastpur Under Edd-Iv, Iglas.- 1 Cartage Of Followingpoles From Store Centre Or From Any Other Place To , iglas-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Electricity Line Construction & Other Related Works For Issued Of New Electricity Connections Under Deposit Scheme In The Jurisdiction Of Edsd-Ii, Hastpur Under Edd-Iv, Iglas.- 1 Cartage Of Followingpoles From Store Centre Or From Any Other Place To . Submission Date for this Tender is 03-10-2022. Bolts Tenders in iglas Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

34140364
Electricity Line Construction & Other Related Works For Issued Of New Electricity Connections Under Deposit Scheme In The Jurisdiction Of Edsd-Ii, Hastpur Under Edd-Iv, Iglas.- 1 Cartage Of Followingpoles From Store Centre Or From Any Other Place To
Open Tender
Indian
Uttar Pradesh
iglas
03-10-2022

Tender Details

Electricity Line Construction & Other Related Works For Issued Of New Electricity Connections Under Deposit Scheme In The Jurisdiction Of Edsd-Ii, Hastpur Under Edd-Iv, Iglas.- 1 Cartage Of Followingpoles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Roadincluding The Work Of Its Loading & Unloading At The Respective Ends, Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 2 Pcc / Stp Poles 8.5 / 11 Mtr. 3 Cartage Of Line Material Viz Cable, Conductor / Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps, Cable, Stone Pad & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective End, Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 4 Erection Of Single Support Including Complete H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 5 Pcc / Stp Poles 8.5 / 11 Mtr. 6 Erection Of Double Pole On Following Poles Including The Work Of Complete Line As Per Respo Norm Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 7 Pcc / Stp Poles 8.5 / 11 Mtr. 8 Installation & Fixing Of 11 Kv Tpmo. 9 ( A ) Erection & Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work. 10 ( B ) Providing And Fixing Of Stay Insulator. 11 Laying, Sagging, Stringing, Binding And Jumpering Etc. Of Old Line Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 12 Acsr Weasal Conductor. 13 Acsr Dog Conductor. 14 Abc Conductor 3X50+1X35+1X16 Sq.Mm. / 3X95+1X70+1X16 Sq.Mm. / 3X120+1X95+1X16 Sq.Mm. 15 Laying Of 4X16 / Sq.Mm Lt Cable Jumphering From L.T. Site Transformer To Line. 16 Grouting Of Pcc / Stp Poles 8.5 / 11 Mtr. Long As Per Respo Norms 17 Making The Plinth Of Steel Poles. 18 Fixing Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 19 Chopping Of Tree Branches Which Are Touching To Ht / Lt Lines. 20 Complete Chemical Earthing Of 11 / 0.4 Kv, Distribution Transformer By Digging Pits 6” Dia Upto 3 Mtr. Deep Including Chemical Filled Pipe In Between ( Pipe-In-Pipe ) Isi Mark B Grade & Connecting With G.I Strip Of Size 50Mm X 6Mm With Neutral / Body Of 11 / 0.4 Kv Distribution Transformer To Above Pipe-In-Pipe ( Pip ) And Filling Of Chemical Crystalline Conductive Mixture Containing Highly Conductive Material Around The ( Pipe-In-Pipe ) Up To 3 Mtr. Including Making Of Chamber At The Top Of The Earthing. Other Details Are As Below:-1. Earth Pipe Material – Mild Steel, Galvanized.2-Main Electrode Diameter – 42.4Mm.3-Auxiliary Electrode Pipe, Diameter – 76Mm. 4-Wall Thickness Of Main Electrode: - 2.6Mm.5-Wall Thickness Of Auxiliary Hole: - 3.2Mm.6- Length Of Earthing Electrode ( Pip ) :- 3 Meter. 21 Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms. 22 Providing & Fixing Ofclamps Of Lt, Cross Arm Holding, F-Clamp, Stay Clamp, Danger Board Clamp With Nut & Bolts. 23 Drilling And Cutting Of Tee Off Channel, V Cross Arms, Top Channel, Cross Bracing Angle, Ms Garding Angle, Dropper Chanel. As Per Specification Of Uppcl Construction Manual Including Including Loading And Unloading At The Both Ends. 24 Providing Of Fixing Of Lt Shackle Insulator. 25 Providing / Fixing Of Missing Nut Bolts And Washer 26 Dismentling Of Oldpcc / Stp Poleafter Dismentling Of All Accessories. 27 Dismantling And Removal Of Existing Conductor / Cable / Gi Wire From The Various Area Preparing Their Coils And Then Stacking In The Respective Je’S ( Store ) As Per Direction Of Supervising Engineer. It Includes The Work Of Cartage, Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 28 Re-Sagging Of Ht / Lt Line Conductor As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour T&P Carrier Etc. Required For Proper Completion Of Work. 29 Straightening Of Tilted Pcc / St Poles At Various Places As Per Direction Of Je. 30 Installation Of Extra “T”Onthe Old Erected Poles Wherever Required Alongwith All Fitting As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. The “T”Pole Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement. 31 Carriage & Mounting From Site To Store / Store To Site Following Capacity Transformer Including The Work Of Its Loading & Unloading, Dragging Etc. And Also Including The Cost Of Labour And T&P Etc. Required For Proper Completion Of Work. 32 10 / 16 Kva T / F 33 25 Kva T / F 34 63 Kva T / F 35 100 Kva T / F 36 Safe Carriageof Lt Distribution Box ( Three Phase ) From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Respo Norms. 37 Providing & Fixing Of 3X70 / 3X120 / 3X185 Sq.Mm. 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor & Outdoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. 38 Providing & Fixing Of 3X300 Sq.Mm. 33 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor & Outdoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. 39 Safe Carriageof 3X70 / 3X120 / 3X185 / 3X300 Sq.Mm.33 Kv / 11 Kvxlpe Cable From Store Center To Respective Site Of Work Including Loading & Unloading At Both Ends For Proper Completion Of Work. 40 Laying Of 3X70 / 3X120 / 3X185 / 3X300 Sq.Mm.33 Kv / 11 Kv Under Ground Cable By Straight Through After Digging Trench Of 600 Mm. Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable. The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling. Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. All Material ( Except Cable ) , Labour, T&P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost. 41 Guarding Of 11 Kv Lineby Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings ( Tilli ) At A Distance At 2-3 Mtr. As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T & P Etc. Required For Proper Completion Of Work. 42 Carriage & Installation Of 33Kv / 11 Kv Ct-Pt Pole Mountedmetering Unit On Double Pole After Fixing Of Channel With M.S. Clamps And Nuts Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Size 1 / 8X1 Finally Connected To Earthing Rod Of Size 20Mm X2540 Mm. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo / Ae ( M ) . The M.S. Strip & Earth Rod Shall Be Included In The Scope Of Work. 43 Safe Carriage & Installation Of 33Kv / 11 Kvpilfer Proof Metering Cubicle From Store Centre, Sarsol To Site Of Work. 44 Providing & Fixing Wearing Gi Pipe 6” Dia On The Feeder Cable Before Mounting The Cable On The Double Pole Lifting, Mounting And Clamping Of 11 Kv Feeder Cable With Boxes On The Feeder Double Pole Structure And Making Connections Including Supply. 45 Road Restoration Charges For Pucca Road Crossing. 46 Road Cutting For Laying 33Kv / 11 Kv Under Ground ( Size 3X70 / 3X120 / 3X185 / 3X300 Sq.Mm ) Inside Pipe Afterdigging Trench Of 600 Mm. Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable. The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling. Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. All Material ( Except Cable ) , Labour, T&P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost.

Key Value

Document Fees
INR 1180 /-
EMD
INR 5000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:Electricity Line Construction & Other related Works for Issued of new electricity connections under deposit scheme in the jurisdiction of EDSD-II, Hastpur under EDD-IV, Iglas.
Sl. No. Item Description
1Cartage of followingpoles from Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
2PCC/STP poles 8.5/11 Mtr.
3Cartage of line material viz Cable,Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable, Stone pad & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
4Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
5PCC/STP poles 8.5/11 Mtr.
6Erection of double pole on following poles including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
7PCC/STP poles 8.5/11 Mtr.
8Installation & fixing of 11 KV TPMO.
9(a) Erection & Grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work.
10(b)Providing and fixing of stay insulator.
11Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
12ACSR Weasal Conductor.
13ACSR Dog Conductor.
14ABC Conductor 3x50+1x35+1x16 Sq.mm./3x95+1x70+1x16 Sq.mm./ 3x120+1x95+1x16 Sq.mm.
15Laying of 4x16/Sq.mm Lt Cable Jumphering from L.T. site transformer to line.
16Grouting of PCC/STP poles 8.5/11 Mtr. Long as per RESPO norms
17Making the plinth of Steel poles.
18Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.
19Chopping of tree branches which are touching to HT/LT lines.
20Complete chemical earthing of 11/0.4 KV,Distribution Transformer by digging pits 6” dia upto 3 mtr. deep including chemical filled pipe in between (pipe-in-pipe) ISI mark B Grade & connecting with G.I strip of size 50mm X 6mm with neutral/body of 11/0.4 KV distribution transformer to above pipe-in-pipe (PIP) and filling of chemical crystalline conductive mixture containing highly conductive material around the (pipe-in-pipe) up to 3 Mtr. including making of chamber at the top of the earthing. Other details are as below:- 1. Earth pipe material – mild steel, Galvanized. 2-Main Electrode diameter – 42.4mm. 3-Auxiliary Electrode pipe, Diameter – 76mm. 4-Wall Thickness of main Electrode: - 2.6mm. 5-Wall thickness of auxiliary hole: - 3.2mm. 6- Length of earthing electrode (PIP):- 3 Meter.
21Erection of section Tee pole including fixing of all fittings as per RESPO norms.
22Providing & Fixing ofClamps of LT,Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts.
23Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel. as per specification of UPPCL construction manual including including loading and unloading at the both ends.
24Providing of Fixing of LT shackle insulator.
25Providing/Fixing of missing Nut bolts and washer
26Dismentling of oldPCC/STP poleafter dismentling of all accessories.
27Dismantling and removal of existing conductor/cable/GI Wire from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
28Re-sagging of HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work.
29Straightening of tilted PCC/ST poles at various places as per direction of JE.
30Installation of extra “T”onthe old erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc. required for proper completion of work. The “T”pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.
31Carriage & Mounting from site to Store/store to site following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
3210/16 KVA T/F
3325 KVA T/F
3463 KVA T/F
35100 KVA T/F
36Safe carriageof LT distribution box (three phase) from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms.
37Providing & Fixing of 3x70/3x120/3X185 Sq.mm. 11 KV XLPE heat shrinkable cable jointing kits indoor & outdoor type including the cost of labour T&P carrier etc for proper completion of work.
38Providing & Fixing of 3x300 Sq.mm. 33 KV XLPE heat shrinkable cable jointing kits indoor & outdoor type including the cost of labour T&P carrier etc for proper completion of work.
39Safe carriageof 3x70/3x120/3X185/3x300 Sq.mm.33 KV/11 KVXLPE Cable from Store Center to respective site of work including loading & unloading at both ends for proper completion of work.
40Laying of 3x70/3x120/3X185/3x300 Sq.mm.33 KV/11 KV under ground cable by straight through after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
41Guarding of 11 KV Lineby laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work.
42Carriage & Installation of 33KV/11 KV CT-PT Pole Mountedmetering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
43Safe carriage & Installation of 33KV/11 KVpilfer proof metering cubicle from store centre, Sarsol to site of work.
44Providing & Fixing Wearing GI pipe 6” dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 KV feeder cable with boxes on the feeder double pole structure and making connections including supply.
45Road Restoration charges for pucca road crossing.
46Road Cutting for laying 33KV/11 KV under ground (Size 3x70/3x120/3X185/3x300 Sq.mm) inside pipe afterdigging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail