|
| 1 | S.I.T.C. of Submersible Pumping Plant with Accessories for existing tubewells |
| 2 | Supply of Submersible pump and motor set:700 L.P.M. discharge at 50 mts. NEH. With Suitable motor |
| 3 | Supply ofFully automatic start delta Starter cum panel of 15 HP as per spacifications and site Requirment. |
| 4 | Supply ofMainpiping andvalvesas per specification and site Requirment |
| 5 | Supply ofof 6 sq.mm. 3 core Copper conductor P.V.C. insulated submersible cable |
| 6 | Supply of30KVA automatic voltage regulator (compact) servo controlled stabilizer with accessoriesas per specifications and site Requirment |
| 7 | Supply of chain pulley 3.0 tonne capacity with 4.5mt.lift . |
| 8 | Supplyof Gauges as per specifications |
| 9 | Supply & Fixing of Earthing materialsas per specifications and site Requirment |
| 10 | Supply of Rubber Insulation sheet 1mt. x 2mt.x 0.025 mtr. |
| 11 | Supply of 63 Amp. TPN Main Switch |
| 12 | Intelligent GSM based Mini Remote Terminal Units/PLC with analog and digital parameters and features as specified mini T.W. and transmit data on GSM backbone. GSM based wireless Communication system capable to transfer and gather data from remote sites to master Control Stations (Voltage, Current, Power factor,Pumping running Hour etc.) with 6 Amp. Automatic Voltage stabilizer including high and low cut and isolation transformer. |
| 13 | Erection, testing and commissioining and modification of starter with AC and DC relays and necessary wiring complete in all respect. |
| 14 | Tools and Spanners – |
| 15 | Installation, commissioning and Testing of pumping plant & Accessoriees complete |
| 16 | Internal & External Electrification of pump house as per specification for existing tubewells |
| 17 | Stage-I |
| 18 | Supply of high head horizontal multi stage CENTRIFUGAL pumping plant to deliver 1400LPM 410 Mtr. Head as per specifications |
| 19 | Supply of Induction motor T.E.F.C 1450 RPM operating at 415± 10% volts 3 phase 50C/S A.C. pump suitable for above pumpas per specifications |
| 20 | Supply of M.S. fabricated base plate for above pump and motor set, coupling and coupling guard. |
| 21 | Supply of Fully automatic Auto Transformer starter as per Specification and site requirement. |
| 22 | Supply of Control Panel as Per Specification and site requirement. |
| 23 | Supply ofPower wiring. |
| 24 | 185 mm² Single core copper cable |
| 25 | Jointing material such as lugs, tape etc. |
| 26 | MAIN PIPING AND VALVES ( Suction / Delivery side/ By pass) as per Specifications and site requirement. |
| 27 | GAUGES as per Specification and site requirement. |
| 28 | main switch 630 Amp |
| 29 | Chainpully Block 5 Ton capacity and lift upto 6 Mtr. as per Specification and site requirement. |
| 30 | Supply of400KVA automatic voltage regulator (compact) servo controlled stabilizer with accessoriesas per specifications and site Requirment |
| 31 | Stage-II |
| 32 | Supply of high head horizontal multi stage CENTRIFUGAL pumping plant to deliver 1400LPM 410 Mtr. Head as per Specifications mentioned in tender document. |
| 33 | Supply of Induction motor T.E.F.C 1450 RPM operating at 415± 10% volts 3 phase 50C/S A.C. supply for above pump. |
| 34 | Supply of M.S. fabricated base plate for above pump and motor set, coupling and coupling guard. |
| 35 | Supply of Fully automatic Auto Transformer starter as per Specifications in tender document |
| 36 | Supply of Control Panel as Per Specifications and site requirement. |
| 37 | Supply of Power Wiring material as per Specification and site requirement as below. |
| 38 | 185 mm² Single core copper cable |
| 39 | Jointing material such as lugs, tape etc. |
| 40 | MAIN PIPING AND VALVES ( Suction / Delivery side/ By pass) as per Specifications in tender document. |
| 41 | GAUGES as per Specification and site requirement. |
| 42 | Supply & Fixing of main switch 630 Amp |
| 43 | Chainpully Block 5 Ton capacity and lift upto 6 Mtr. as per Specification and site requirement. |
| 44 | Supply of400KVA automatic voltage regulator (compact) servo controlled stabilizer with accessoriesas per specification and site Requirment |
| 45 | RUBBER RESISTANCE SHEET – (ForStage-I,Stage-II) |
| 46 | Fire extinguishers (6 kg) as per site requirments- One Set For Each Stage |
| 47 | EARTHING – (ForStage-I,Stage-II) – One Job For Each stage as per Specifications |
| 48 | ERECTION & COMMISSIONING of pump set (ForStage-I,& Stage-II)– One Job for Each stage. |
| 49 | TESTING of pump set (ForStage-I,Stage-II) – |
| 50 | At manufacturer works |
| 51 | At site |
| 52 | PAINTING (ForStage-I,Stage-II)– One Job for Each |
| 53 | Transformer and Accessories |
| 54 | Supply of 400KVA Transformer for Stage-1st as Per Specifications and site requirement. |
| 55 | Supply of 400KVA Transformer for Stage-2nd as Per Specifications and site requirement. |
| 56 | ERECTION & COMMISSIONING of Transformer (ForStage-I,& Stage-II)– One Job for Each stage. |
| 57 | TESTING of Transformer (ForStage-I,Stage-II) – |
| 58 | At manufacturer works |
| 59 | At site |
| 60 | S.I.T.C of H.T. Panel as per specifications and site requirement. |
| 61 | 120sq. mm H.T. XLPE cable armoured from H.T. panel to 11/0.44KV Tranformer side including cable jointing material stage 1st & Stage Iind |
| 62 | 11KV jointing kit complete (Indoor + Outdoor) for each nos. sub station. |
| 63 | Making of earth station for transformer, HT Panel including all material as per IE rules for tubewell Stage-I & Stage-II, Staff quarters and campus. |
| 64 | Complete internal and external electrification of all Pump Houses, staf Quarters and campus with LED lightning. |
| 65 | Carting of Pumping Plants, Transformerwith all accessories for all stages. ( Raw Water Stage-1st , Stage-II) |
| 66 | TRIAL, RUN and MAINTENANCE (For Tubewell, Stage I& Stage II ) Rates for six months. |