| 1 | Name of Work : Construction of Milk Producer\"s Co-operative Society Building at Vavikadai H/O Thiruvachi |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay,black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation complete as per standard specification. |
| 3 | Sand Filling using Filling Sand including the cost and conveyance of all materials and labour charges for laying etc. complete |
| 4 | Cement concrete in 1:4:8 mix using 40mm ISSHBG metal including all Cost and conveyance of labour charges etc.,Complete., |
| 5 | Cement concrete in 1:2:4 mix using 20mm ISSHBG metal including all Cost and conveyance of labour charges etc.,Complete., |
| 6 | Filling the Basement with Excavated earth other than sand complying with standard specification etc. Complete. |
| 7 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc., complete - For Foundation and Basement |
| 8 | For Super Structure in Ground Floor |
| 9 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., |
| 10 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc., Complete., |
| 11 | Supply of door of size of 0.90 x 2.10 including all cost and conveyance etc., |
| 12 | Supply of Window of size of 1.20 x 1.30 including all cost and conveyance etc., |
| 13 | Supply of steel Ventilator including cost and conveyance of all materials & Labour charges etc., Complete., - Steel Ventilator V |
| 14 | Steel Ventilator |
| 15 | Paving the Floor with designed ceramic tiles size 305x305x6mm in CM 1:3 20mm thickincluding cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 16 | Weathering coarse with Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete |
| 17 | Finishing the roof with one course to pressed tiles of size of 23cm X 23cm X 2cm and top of pointing with CM 1:3 mix including all cost and conveyance of labour charges etc., |
| 18 | Plastering with CM 1:5 mix 12mm thick including all cost and conveyance of labour charges etc., complete. |
| 19 | Dadooing walls with printed design color glazed ceramic tiles including cost and conveyance of all materials charges etc complete |
| 20 | Distempering two coats using best quality and approved colour oil bound distemper over one coat of cemet paint including all cost of labour charge etc., |
| 21 | Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labour charges etc complete. |
| 22 | Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc. |
| 23 | Supplyof Indian type water closet with P-Trap including of all chargesetc complete |
| 24 | Plastering with CM 1:3 mix using 10 mm thick including all cost and conveyance of labour charges etc., |
| 25 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc., complete as per standard specification. - BGL |
| 26 | Roof slab ,lintel & beam |
| 27 | Provision for Rolling shutter 3.0mx3.0m including all cost and conveyance etc., |
| 28 | Supplying and fixing of 110mm dia PVC pipe for rainwater down fall pipe including cost and labour charges etc.,complete. |
| 29 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |