Numaligarh Refinery Limited has published Design, Engineering, Manufacturing, Procurement Of Materials And Bought Out Components, Assembly At Shop, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Ultasonic Flowmeters , Ultrasonic Flowmeter ( Clamp On ) , Ultra. Submission Date for this Tender is 29-12-2022. Clamps Tenders in Golaghat Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-Sep-2022 | Corrigendum 1 | Date | 20-10-2022 |
2 | 20-Oct-2022 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 27-10-2022 |
3 | 28-Oct-2022 | BDD Extension | Date | 10-11-2022 |
4 | 11-Nov-2022 | Corrigendum 3 | Date | 24-11-2022 |
5 | 18-Nov-2022 | Corrigendum 4 | Technical Bid | 24-11-2022 |
6 | 25-Nov-2022 | Corrigendum 5 | Date | 08-12-2022 |
7 | 07-Dec-2022 | Corrigendum 6 | Technical Bid | 08-12-2022 |
8 | 09-Dec-2022 | Corrigendum 7 | Date | 29-12-2022 |
Sl. No. | Item Description |
1 | Ultrasonic Flowmeter (Clamp On) |
2 | Ultrasonic Flowmeter (Clamp On) |
3 | Ultrasonic Flowmeter (Clamp On) |
4 | Ultrasonic Flowmeter (Clamp On) |
5 | Ultrasonic Flowmeter (Clamp On) |
6 | Ultrasonic Flowmeter (Clamp On) |
7 | Ultrasonic Flowmeter (Clamp On) |
8 | Ultrasonic Flowmeter (Clamp On) |
9 | Ultrasonic Flowmeter (Clamp On) |
10 | Ultrasonic Flowmeter (Clamp On) |
11 | Ultrasonic Flowmeter (Clamp On) |
12 | Ultrasonic Flowmeter (Clamp On) |
13 | Ultrasonic Flowmeter (Clamp On) |
14 | Ultrasonic Flowmeter (Clamp On) |
15 | Ultrasonic Flowmeter (Clamp On) |
16 | Ultrasonic Flowmeter (Clamp On) |
17 | Ultrasonic Flowmeter (Clamp On) |
18 | Ultrasonic Flowmeter (Clamp On) |
19 | Ultrasonic Flowmeter (Clamp On) |
20 | Ultrasonic Flowmeter (Clamp On) |
21 | Ultrasonic Flowmeter (Clamp On) |
22 | Ultrasonic Flowmeter (Insertion / Clamp On) Flare Gas Flow Meter |
23 | Maintenance support/ Supervisory service during warranty/ defect liability period (LUMPSUM) During warranty/ defect liability period after successful commissioning of the Instruments, Two (2) periodic visits of the expert of OEM/ OEM"s representative is mandatory for performance monitoring/ observation/ calibration, troubleshooting, advisory service on improvement etc. (For more details refer MR documents) |
24 | Site Supervision & Trainign Charges, (other details as per the material requisition) Unit rate forSite Supervision Sevices of erection and commissioning / Performance testing & Training Chrages as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Per Diem charges upto 8 hrs on normal working days. ( BIDDERS TO QUOTEUNIT RATE FOR DIEM CHARGES ) |
25 | Unit rate forSupervision Sevices of erection and commissioning / Performance testing & Training Chrages as per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Overtime rate per hour (beyond normal 8 hours on normal working days). ( BIDDERS TO QUOTE OVER TIMERATE PER HOUR ) |
26 | Unit rate forSupervision Sevices of erection and commissioning / Performance testing & Training Chragesas per details mentioned in material requisition for quoted items as per enclosed instructions to vendor Overtime rate per hour for work on weekly off days / holidays (as applicable to Refinery Site). ( BIDDERS TO QUOTE OVER TIMERATE PER HOUR ) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail