| 1 | Earthwork in excavation in all types of soil for site leveling, foundation, pits, trenchesand other civil works upto and including 2.0metre depth and stacking the soil upto a lead of 100 metre and including dewatering, removing slush, shoring and strutting (as required), complete as per specification and as directed by the Engineer-In-Charge. |
| 2 | All kind of soils. |
| 3 | Road |
| 4 | Boundary wall |
| 5 | Warden room |
| 6 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-In-charge. |
| 7 | Road |
| 8 | Boundary wall |
| 9 | Warden room |
| 10 | Supplying and filling sand in foundation and over areas including watering, ramming, consolidating and dressing, labours, tools, taxes etc. all complete as per the specification and direction ofEngineer-In-charge. |
| 11 | Road |
| 12 | Boundary wall |
| 13 | Warden room |
| 14 | Diluting and injecting chemical emulsion (to be supplied free of cost at site of work) for PRE CONSTRUCTIONAL Anti-termite treatment and creating a continuous chemical barrier under and all-round the column pits, wall trenches, basement excavation, top perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surroundings of pipes and conduits etc. complete as per specifications (plinth area of the building at ground floor only shall be measured for payment). |
| 15 | Warden room |
| 16 | Providing and laying plain cement concrete 1:3:6 (1 cement : 3 sand : 6 stone agregate 12mm nominal size) as levelling course in foundation and plinth etc. including tempering, curring, shuttering etc. complete all depth and height. |
| 17 | Warden room |
| 18 | Providing and laying plain cement concrete 1:4:8 (1 cement : 4 sand : 8 stone agregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curring, shuttering etc. complete all depth and height. |
| 19 | Road |
| 20 | Boundary wall |
| 21 | Warden room |
| 22 | Providing and laying plain cement concrete 1:3:6 (1 cement : 3 sand : 6 stone agregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curring, shuttering etc. complete all depth and height. |
| 23 | Road |
| 24 | Boundary wall |
| 25 | Sports cum Innovation Block/warden |
| 26 | First class Fly ash Brick masonry usingbricks of size 25cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Foundation & Plinth including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-In-Charge. at all floors and all heights. |
| 27 | Boundary wall |
| 28 | Warden room |
| 29 | First class Fly ash Brick masonry usingbricks of size 25cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Super stracture including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-In-Charge. at all floors and all heights. |
| 30 | Ground Floor |
| 31 | Kitchen |
| 32 | Girls Hostel |
| 33 | Boys Hostel |
| 34 | Boundary wall |
| 35 | Warden room |
| 36 | First Floor |
| 37 | Girls Hostel |
| 38 | Boys Hostel |
| 39 | Warden room |
| 40 | 2nd Floor |
| 41 | Girls Hostel |
| 42 | Boys Hostel |
| 43 | First class Fly ash Brick masonry usingbricks of size 25cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:4) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Super structure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-In-Charge. |
| 44 | Ground floor |
| 45 | Warden room |
| 46 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 25 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed andcleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portlandslag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. |
| 47 | a) Footings |
| 48 | Road |
| 49 | Kitchen |
| 50 | Warden room |
| 51 | Boundary wall |
| 52 | b) Grade Beam/Tie beam |
| 53 | Boundary wall |
| 54 | Warden room |
| 55 | c) Column |
| 56 | Column up to plinth |
| 57 | d)Ground floor |
| 58 | Boundary wall |
| 59 | Warden room |
| 60 | First floor |
| 61 | a) Column |
| 62 | d) Lintel |
| 63 | Ground floor |
| 64 | Warden room |
| 65 | First floor |
| 66 | Warden room |
| 67 | e) Chajja / Platform slab |
| 68 | Ground floor |
| 69 | Warden room |
| 70 | First floor |
| 71 | Warden room |
| 72 | f) Roof Beam |
| 73 | Ground floor |
| 74 | Warden room |
| 75 | First Floor |
| 76 | Warden room |
| 77 | g) Roof slab |
| 78 | Ground floor |
| 79 | Warden room |
| 80 | First floor |
| 81 | Warden room |
| 82 | h) Staircase |
| 83 | Warden room (ground floor) |
| 84 | (first floor) |
| 85 | i) RCC shelves |
| 86 | Ground Floor |
| 87 | Girls Hostel |
| 88 | Boys Hostel |
| 89 | First Floor |
| 90 | Girls Hostel |
| 91 | Boys Hostel |
| 92 | Supplying, straightening, cutting, bending, placing in position and binding reinforcement steel work in RCC/reinforced brick works as per drawing and specification including preparation of respective bar bending schedule and binding (Bindingwire to be used as per the IS code) etc. all complete as per direction of Engineer-In-charge. Cold Twisted bars, Thermo-Mechanically-treated bars. |
| 93 | Ground floor |
| 94 | Kitchen |
| 95 | Boundary wall |
| 96 | Girls Hostel |
| 97 | Boys Hostel |
| 98 | Warden room |
| 99 | First floor |
| 100 | Girls Hostel |
| 101 | Boys Hostel |
| 102 | Warden room |
| 103 | 12mm cement plaster on external RCC/brick surfaces incement plaster 1:6 (1 cement : 6 coarse sand) including necessary scaffolding, curing etc. all complete at all floors and all heights. |
| 104 | Ground floor |
| 105 | Girls Hostel |
| 106 | Kitchen |
| 107 | Boys Hostel |
| 108 | Warden room |
| 109 | First floor |
| 110 | Girls Hostel |
| 111 | Boys Hostel |
| 112 | Warden room |
| 113 | 16mm cement plaster on internal smooth side of RCC/brick surfaces with cement mortar of mix 1:6 (1 cement : 6 fine sand) including necessary scaffolding, curing etc. all complete at all floors and all heights. |
| 114 | Ground floor |
| 115 | Kitchen |
| 116 | Girls Hostel |
| 117 | Boys Hostel |
| 118 | Boundary wall |
| 119 | Warden room |
| 120 | First floor |
| 121 | Girls Hostel |
| 122 | Boys Hostel |
| 123 | Warden room |
| 124 | 2nd Floor |
| 125 | Girls Hostel |
| 126 | Boys Hostel |
| 127 | 6 mm cement plaster on RCC surfaces at ceiling/slab soffit and other locations with cement mortar of mix 1:4 (1 cement : 4 fine sand) including necessary scaffolding, curing etc. all complete at all floors and all heights. |
| 128 | Ground floor |
| 129 | Kitchen |
| 130 | Girls Hostel |
| 131 | Boys Hostel |
| 132 | Boundary wall |
| 133 | Warden room |
| 134 | First floor |
| 135 | Girls Hostel |
| 136 | Boys Hostel |
| 137 | Warden room |
| 138 | 2nd Floor |
| 139 | Girls Hostel |
| 140 | Boys Hostel |
| 141 | Providing, fitting and fixing Matt Finish Vitrified tile in floor of size 300x300 mm of approved make conforming to IS: 13755 laid on 20 mm thick cement mortar 1:4 (1 cement: 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc required for the work all complete as per direction of Engineer-In-Charge |
| 142 | Ground floor |
| 143 | Girls hostel |
| 144 | Boys hostel |
| 145 | First floor |
| 146 | Girls hostel |
| 147 | Boys hostel |
| 148 | Providing and laying Vitrifiedfloor tiles 600x600 mm (thickness to be specified by the manufacturer) 1st qualityof NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades laid on 20 mm thick cement mortar 1:4 (1cement: 4coarse sand ) including pointing the joints with white cement and matching pigments, etc. complete as per direction ofEngineer-In-Charge at all floors and all heights. |
| 149 | Ground floor |
| 150 | Girls hostel |
| 151 | Warden room |
| 152 | boys hostel |
| 153 | First floor |
| 154 | Girls hostel |
| 155 | Warden room |
| 156 | boys hostel |
| 157 | Providing and fixing 16mm thick Kota stone flooring(sample of kotastone should be approved by EIC)where ever required in horizontal/vertical surfaces of required size of approved shade, colour and texture, with moulding edge etc. laid over 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) with joints treated with white cement mixed with matching pigment, epoxy touch ups including rubbing, curing, moulding and polishing complete as per direction of Engineer-in-charge. In all floors and all heights. |
| 158 | Ground floor |
| 159 | Girls hostel |
| 160 | Boys hostel |
| 161 | First floor |
| 162 | Girls hostel |
| 163 | Boys hostel |
| 164 | Providing and layingCeramic Glazed wall tiles of size 20cmx30cm / 20cm x 20cm (thickness to be specified by the manufacturer) for skirting/Dado1st quality conforming to IS: 15622 of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades, except white, ivory, grey, fume red brown, laid on 12 mm thick cement mortar 1:3 (1cement: 3coarse sand ) including pointing the joints with white cement and matching pigments, etc. complete as per direction of EIC at all floors and all heights. |
| 165 | Ground floor |
| 166 | Kitchen |
| 167 | Girls hostel |
| 168 | Boys hostel |
| 169 | Warden room |
| 170 | First floor |
| 171 | Girls hostel |
| 172 | Boys hostel |
| 173 | Providing and layingMatte Finish Vitrified wall tiles 600x600 mm (thickness to be specified by the manufacturer) 1st quality conforming to IS: 15622 of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades, except white, ivory, grey, fume red brown, laid on 12 mm thick cement mortar 1:3 (1cement:3coarse sand) including pointing the joints with white cement and matching pigments, etc. complete as per direction ofEngineer-In-Charge at all floors and all heights. |
| 174 | Ground floor |
| 175 | Girls hostel |
| 176 | First floor |
| 177 | Girls hostel |
| 178 | Providing and fixing 20mm thick Granite stone flooring(sample of Granitestone should be approved by EIC) for stair case trade, riser and similar locations where ever required in horizontal/vertical surfaces of required size of approved shade, colour and texture, with moulding edge etc. laid over 20mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) with joints treated with white cement mixed with matching pigment, epoxy touch ups including rubbing, curing, moulding and polishing to give high gloss finish and groove in staircase where required etc. complete as per direction of Engineer-in-charge. In all floors and all heights. |
| 179 | Ground floor |
| 180 | Kitchen |
| 181 | Warden room |
| 182 | Sports cum innovation |
| 183 | First floor |
| 184 | Warden room |
| 185 | Provision for polishing of existing Kota stone flooring |
| 186 | Ground floor |
| 187 | Girls hostel |
| 188 | Boys hostel |
| 189 | First floor |
| 190 | Girls hostel |
| 191 | Boys hostel |
| 192 | Providing and fixing M.S grill/window/door of required patterns for windows/verandahs etc. with M.S flats, square or round bars etc. including applying a coat of approved steel primer and two or more coats of synthetic enamel paint of approved make & shade, all complete as per drawing & specification. (All steel sections contractor\"s own supply). |
| 193 | Ground floor |
| 194 | Kitchen |
| 195 | Girls hostel |
| 196 | Boys hostel |
| 197 | Boundary wall |
| 198 | Warden room |
| 199 | First floor |
| 200 | Girls hostel |
| 201 | Boys hostel 1 |
| 202 | Warden room |
| 203 | Providing & Painting with synthetic enamel paint of approved brand and manufacture to give an even shade as per the instruction of Engineer-In-Charge at all floors and all heights including all material & labour complete. |
| 204 | Ground floor |
| 205 | Road |
| 206 | Kitchen |
| 207 | Girls hostel |
| 208 | Boys hostel |
| 209 | Warden room |
| 210 | Boundary wall |
| 211 | First floor |
| 212 | Girls hostel |
| 213 | Boys hostel |
| 214 | Warden room |
| 215 | 2nd Floor |
| 216 | Girls hostel |
| 217 | Boys hostel |
| 218 | Providing & Applying priming coat with Cement primer of approved brand and manufacture on plaster surface as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. |
| 219 | Ground floor |
| 220 | Kitchen |
| 221 | Girls hostel |
| 222 | Boys hostel |
| 223 | Warden room |
| 224 | Boundary wall |
| 225 | First floor |
| 226 | Girls hostel |
| 227 | Boys hostel |
| 228 | Warden room |
| 229 | 2nd Floor |
| 230 | Girls hostel |
| 231 | Boys hostel |
| 232 | Providing and applying to outside walls with two or more coats ofAnti-Fungal Weather coat (English ELMS 2387) water proofing paint including scaffolding and cleaning the surface before application of approved colour and manufacture as per specification, instruction of Engineer-In-Charge at all elevations including all material labour complete. |
| 233 | Ground floor |
| 234 | Kitchen |
| 235 | Girls hostel |
| 236 | Boys hostel |
| 237 | Warden room |
| 238 | First floor |
| 239 | Girls hostel |
| 240 | Boys hostel |
| 241 | Warden room |
| 242 | 2nd Floor |
| 243 | Girls hostel |
| 244 | Boys hostel |
| 245 | Providing and applying white cement based putty of average thickness 1 mm of approved brand and manufacturer,over the plastered wall surfaces to prepare the surface even and smooth as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. |
| 246 | Ground floor |
| 247 | Kitchen |
| 248 | Girls hostel |
| 249 | Boys hostel |
| 250 | Boundary wall |
| 251 | Warden room |
| 252 | First floor |
| 253 | Girls hostel |
| 254 | Boys hostel |
| 255 | Warden room |
| 256 | 2nd Floor |
| 257 | Girls hostel |
| 258 | Boys hostel |
| 259 | Providing & painting two coats of Plastic emulsion paint with 1st qualityof approved brand and manufacturer to give an even shade as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. |
| 260 | Ground floor |
| 261 | Kitchen |
| 262 | Girls hostel |
| 263 | Boys hostel |
| 264 | Warden room |
| 265 | First floor |
| 266 | Girls hostel |
| 267 | Boys hostel |
| 268 | Warden room |
| 269 | 2nd Floor |
| 270 | Girls hostel |
| 271 | Boys hostel |
| 272 | Providing and laying 10/12 mm thick precast Kodappa tiles on entrance Gate over 25 mm thick bed of cement mortar 1:1 complete as perdrawing, direction of Engineer-In-Charge and technical specification instruction of Engineer-In-Charge at all elevations |
| 273 | Ground floor |
| 274 | Boundary wall |
| 275 | Providing, fitting and fixing of Upvc sliding window . |
| 276 | Ground floor |
| 277 | Kitchen |
| 278 | Warden room |
| 279 | First floor |
| 280 | Warden room |
| 281 | Providing, fitting and fixing of Upvc top hung (openable) Ventilator . |
| 282 | Ground floor |
| 283 | Warden room |
| 284 | Providing and applying to outsidewallswith Weather Coat paint two coats including scaffolding and cleaning the surface before application,as per specification, instruction of Engineer-In-Charge at all elevations including all material labour complet |
| 285 | Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/ window/ Ceosetory windows & other Frames/Chowkhat comprising of virgin PVC polymer of K value 58- 60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/ rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 gms) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 750 kg/ cum, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2, modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-In- Charge. ( Frame size 65 x 150 mm) |
| 286 | Ground floor |
| 287 | Warden room |
| 288 | First floor |
| 289 | Warden room |
| 290 | 32mm both side laminated flush door with view panel with all fittings |
| 291 | Warden room |
| 292 | Providing & Applying priming coat with ready mixed pink or gray primer of approved brand and manufacture on wood /Ply work (hard and soft wood)as per the instruction of Engineer-In-Charge at all elevations including all material & labour complete. |
| 293 | Ground floor |
| 294 | Warden room |
| 295 | First floor |
| 296 | Warden room |
| 297 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand ralling using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm X 32mm X 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm X 32mm X 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes, all materials, labour, T&P etc. required for the complete in all respect. |
| 298 | Warden room/boys /girls |
| 299 | Providing & painting with speaking painting |
| 300 | Girls hostel |
| 301 | Boys hostel |
| 302 | Providing and laying grading conc. 25 mm (avg. thickness) cement concrete of required slope of mix 1:2:2 (1cement:2sand:2 graded stone aggregate of 10 mm nominal size) mixed as per manufacturer\"s specification on top of slab including cement slurry, all complete, including the cost of water proofing admixture, which should be approved by the Engineer-In-Charge prior to material procurement by the contractor. |
| 303 | Ground floor |
| 304 | Warden room |
| 305 | First floor |
| 306 | Warden room |
| 307 | Waterproofing Treatment :- Toilet/Floor & Wall |
| 308 | Providing waterproofing for Toilet/SukenSlab:- Cleaning the inside surface & & Application of two coats of sika Top seal 109 hi @ 2.2 Kg/Sqm & Sika Fab-1 to the battom slab & side wall surface to protect against leakage & seepage finally covered with a cement mortar (1:4). Proper care should be taken to fill the pipe penetration points with sikagard 694 fi (moisture resistant epoxy putty) complete as per manufacture specification anddirection of Engineer-In-Charge. |
| 309 | Ground floor |
| 310 | Girls hostel |
| 311 | Boys hostel |
| 312 | Warden room |
| 313 | First floor |
| 314 | Girls hostel |
| 315 | Boys hostel |
| 316 | Terrace water proofing |
| 317 | Ground floor |
| 318 | Girls hostel |
| 319 | First floor |
| 320 | Girls hostel |
| 321 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) over 75mm bed of dry brick ballast 40mm nominal size well ramed, consolidated and grouted with fine sand and finishing the top smooth including shuttering at the edges, excavation and disposing of surplus earth with a lead of 100m complete as per direction of Engineer-in-charge. |
| 322 | Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m lead |
| 323 | Girls hostel |
| 324 | Boys hostel |
| 325 | Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead |
| 326 | Girls hostel |
| 327 | Boys hostel |
| 328 | Dismantling and removing doors, windows and ventilators including removal of frame, hinges, fastening and stacking the same for reuse and removing the debris within 50m |
| 329 | Girls hostel |
| 330 | Boys hostel |
| 331 | Supplying fitting and fixing Fibre Reinforced Polymer FRP composite door frame as per approved section with glass fibre reinforced plastic moulded skins and a special sandwiched core, so as to impart monolithic composite structure as per approved technology (DST) to satisfy IS: 4020 door testing performance criteria including necessary ISI :Aluminium hinges & brass screws as approved by EIC. Standard size 75mm X 100 mm |
| 332 | Ground floor |
| 333 | Girls hostel |
| 334 | Boys hostel |
| 335 | First floor |
| 336 | Girls hostel |
| 337 | Boys hostel |
| 338 | Warden room |
| 339 | Supplying fitting and fixing Fibre Reinforced Polymer FRP composite door shutter with hinge as per approved section with glass fibre reinforced plastic moulded skins and a special sandwiched core, so as to impart monolithic composite structure as per approved technology (DST) to satisfy IS: 14856 door testing performance criteria including all complete, as approved by EIC. |
| 340 | Ground floor |
| 341 | Girls hostel |
| 342 | Boys hostel |
| 343 | First floor |
| 344 | Girls hostel |
| 345 | Boys hostel |
| 346 | Warden room |
| 347 | Providing and laying grading conc. 40 mm (avg. thickness) cement concrete of required slope of mix 1:2:2 (1cement:2sand:2 graded stone aggregate of 10 mm nominal size) mixed as per manufacturer\"s specification on top of slab including cement slurry, all complete, including the cost of water proofing admixture, which should be approved by the Engineer-In-Charge prior to material procurement by the contractor. FOR OLD WORK |
| 348 | Ground floor |
| 349 | Boys hostel |
| 350 | First floor |
| 351 | Girls hostel |
| 352 | Boys hostel |
| 353 | Terrace floor |
| 354 | Girls hostel |
| 355 | Boys hostel |
| 356 | Providing and layingVitrifiedtiles of size 600x600 mm (thickness to be specified by the manufacturer) for skirting/Dado1st quality conforming to IS: 15622 of NITCO, SOMANY, ASIAN, KAJARIA or equivalent approved make, colours & shades, except white, |
| 357 | Skirting |
| 358 | Ground floor |
| 359 | First floor |
| 360 | Supplying and fixing blue scope AC sheet including fastening , revit stacking upto 6m height. |
| 361 | Providing and laying approved colour 60 mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with storng vibratory compaction of approved size, design & shape, laid in required colour and pattern over and including 75mm thick sand filling.as per drawing, specification and direction of Engineer-In-charge. |
| 362 | Ground floor |
| 363 | INTERNAL & EXTERNAL SANITARY WORKS |
| 364 | WATER SUPPLY. |
| 365 | Supplying, installing, fixing, jointing, testing and commissioning of approved make. Chlorinated Polyvinyl Chloride pipes (UPVC) SDR.11 pipes confirming to ASTM standards with necessary fittings for inetrnal toilet water supply upto 50 dia , and above 50mm dia pipe schedule 40withfitting shall be schedule 80 ASTM IPS. The fittings and specials such as tees, elbows,couplers, bends, enlargers etc.,m with UPVC brass threaded combination / transition specials such as male adapters brass threaded female adapters, brass FPT Tee, Brass FPT elbow etc., where connection with metal is to be made including necessary drilling holes, chasing walls and making the same good in cement martor 1:1 restore the same original condition neately as directed by the Engineer in-charge. Joints to be made with UPVC solvent cement up to 50mm dia as per ASTM D-2846 and above 50mm dia primer P-70, and solvent confirming to ASTM F-4931 / 724 All exposed pipe shall be painted with latex paint. (for shafts, basement ceiling ringmain Terrace& PRM).The rate shall include necessary GI supports, GI grip bolts, angle brackets, hangers, supports as with suitable GI U-clamps, bolts, nuts and washers etc., The clamps shall be painted with two coats of enamel (approved) paint over a coat of primer etc., complete. Make:- Supreme/Ashirbad/Sentini |
| 366 | 15 mm dia C-PVC pipe (Oriplast/Supreme) |
| 367 | 20 mm dia U-PVC SH-40 pipe ( Sentini-S400002UP3) |
| 368 | 25 mm dia U-PVC SH-40 pipe( Sentini-S400003UP3) |
| 369 | 32 mm dia U-PVC SH-40 pipe( Sentini-S400004UP3) |
| 370 | 40 mm dia U-PVC SH-40 pipe ( Sentini -S400005UP3 ) |
| 371 | supplying all materials, labour, T&P and cutting holes through existing brick work including making good the damages in cement mortar (1:4) for taking G.I. Pipes and fittings/ P.V.C. pipes and fittings etc. all complete as per P.H. specification and direction of Engineer-in-charge. 250 mm thick wall |
| 372 | GROUND & FIRST FLOOR |
| 373 | Supplying all materials, labour, T&P and cutting grooves in pucca floors and walls for taking G.I./P.V.C. pipes and making good the damages as per direction of the E.I.C. |
| 374 | GROUND & FIRST FLOOR |
| 375 | SANITARY FIXTURES. |
| 376 | Supplying all materials, labour, T&P and fixing the following vitreous china Wash Down Water Closet (European type W.C. pan) of Hindware/Jaquar/Parryware with integral \"p\" or \"s\" trap to the floor with wooden plug and chromium plated pedestal screws including jointing the trap with soil pipe in cement mortar (1:1) fixing plastic seat and cover for wash down water closet with chromium plated brass hinges and rubber buffers including polishing etc all complete as per specification and direction of theEngineer-In-Charge. |
| 377 | EWC with \"p\" / S trap plain CERA CONVENTIONAL (520x360x3290) CAT. NO. S105310 STRAP |
| 378 | Supplying all materials, labour, T&P and fixing vitreous(Orissa pattern squatting pan conforming to IS:2556-part-3-2004) duly embedded in cement concrete (1:5:10) using 4cm size hard granite metal including fixing a pair of vitreous china 250mm x 130mm x 30mm footrest, fixing 100mm dia HCI ‘P’ or ‘S’ trap (with/without 50mm dia horn) for water closet squatting pan including jointing the trap with pan in cement mortar (1:1), cutting the floor and mending good the damages etc all complete as per specification and direction of the Engineer in charge. 580mm size Orissa pan CERA CALINA S3010102(SNOW WHITE) |
| 379 | Supplying all materials, labour, T&P and fixing standard sized LONG BODY Bib cockWITH WALL FLANGE ofHindware/Jaquar/Parrywareof approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP Two waybib cock with FlangeCat. No.: F330011 HINDWARE |
| 380 | Supplying all materials, labour, T&P and fixing Health Faucet of Hindware/Jaquar/Parryware complete with Chromium plated brass brackets fixed to wooden plugs with Chromium plated brass screws as per specification and direction of theEngineer-In-Charge. |
| 381 | 15mm dia CP Health Faucet of Jaquar 1.2mtr long, 8MM dia(MAKE-HINDWARE ,Cat. No.: F160013) |
| 382 | Supplying all materials, labour, T&P and fixing standard sized two wayBib cock ofHindware/Jaquar/Parrywareof approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP Two waybib cock with Flange. ( HINDWARE,Cat. No.: F200004FT) |
| 383 | Supplying all materials, labour, T&P and fixing standard sizedBib cock ofHindware/Jaquar/Parrywareof approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP Two waybib cock with Flange.(HINDWARE Cat. No.: F730041) |
| 384 | Supplying all materials, labour T&P and fixing wash basins of Hindware/Jaquar/Parryware with hole for pillar taps with cast iron or M.S.brackets painted white including cutting holes in walls and making good the damages with supply of wooden plugs, screws and cement etc, fixing pedestal for wash basin recessed at the back for the reception of pipes and fittings, fixing PVC waste pipe of 32mm nominal diameter for wash basin including brass check nut complete, fixing pillar taps capstan head screw down high pressure lettered \"Hot\" and \"Cold\" with long screws, shanks and back nuts of 15mm dia nominal bore, fixing 15mm dia PVC inlet connection pipe and making connection with pillar cocks and supply mains for wash basin, fixing 32mm dia CP brass waste, etc all complete as per specification and direction of theEngineer-In-Charge. |
| 385 | CERA COUNSEL 510x400mm Cat No.S2040101 Wash Basin Cat No. S2090101fullPedestal |
| 386 | Supplying all materials, labour, T&P and fixing standard sizedChromium PlatedShower ofHindware/Jaquar/Parryware complete with Chromium Plated brassbrackets fixed to wooden plugs with Chromium Plated brassscrews as per specification and direction of the Engineer in charge. SHOWER HEAD,SHOWER ARM,ANGULAR STOP COCK |
| 387 | Supplying all materials, labour, T&P and fixing standard sized pillar cock ofof approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. 15mm dia brass pillar cock (Cera PRS-031) |
| 388 | Supplying all materials, labour, T&P and fixing mirror of superior glass mounted on 6mm thick A.C.sheet or plywood sheet and fixed to wooden plugs with CP screws and washers complete as per specification and direction of the Engineer-in-charge. 600mmx450mm size B.E.mirror(CERA B3510106) |
| 389 | Supplying all materials, labour, T&P and fixing standard sized Robe Hook ofHindware/Jaquar/Parryware complete with all as per specification and direction of the Engineer in charge.(HINDWARE Cat. No.: F880004) |
| 390 | Supplying all materials, labour, T&P and fixing standard sized15mm dia angular Stop cock of Hindware/Jaquar/Parrywareof approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP angle stop cock with wall flange(HINDWARE Cat. No.: F740039) |
| 391 | Supplying all materials, labour, T&P and fixing standard sizedChromium Plated soap caseHindware/Jaquar/Parryware complete with Chromium Plated brassbrackets fixed to wooden plugs with Chromium Plated brassscrews as per specification and direction of the Engineer in charge. |
| 392 | Fixing of 32mm dia Brass/GM Fulway Valve confirming toIS : 781-1995 of approved makeas per specification complete as per direction of Er-in-charge. 32mm dia brass or gun metal full way valve.(Make- Zoloto or equivalent.) |
| 393 | Fixing of 25mm dia Brass/GM Fulway Valve confirming toIS : 781-1995 of approved makeas per specification complete as per direction of Er-in-charge. 32mm dia brass or gun metal full way valve.(Make- zoloto or equivalent.) |
| 394 | Supply all materials, labour, T&P and providing fitting & fixing (Aqua guard) pure Chill 80 PSS UV of size 750x570x1350 mm height with water storage capacity 80 liters along with 2 nos of fancets 1 for cold water and 1 for normal water including a flow of 1.5 ltr per minute etc. all complete as per approved drawing, specification and direction of the EIC. |
| 395 | Fixing Rotational moulded Poly Propelene double layer cylindrical vertical water storage tanks confirming to IS 12701-1996 including cutting holes through the tank and fixing mild steel tubes and fitting and providing extra sockets and jam nuts, fixing ball valve etc,including hosting upto a height of 5 mtr above ground level and placing the tank to the required postion etc all complete as per specification and direction of the Er-in-charge. |
| 396 | 1000 Ltr |
| 397 | 2000 Ltr |
| 398 | Supplying, fixing and testing of kitchen Sink Stainless steel kitchen sink - with drain board510x1040 mm bowl depth 250 mm (NIRALI OLYMPIA MINI) |
| 399 | Supplying all materials, labour, T&P and fixing standard sized SINK cock ofHindware/Jaquar/Parrywareof approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP Two waybib cock with FlangeCat. No.: F360023, HINDWARE, |
| 400 | SEWAGE SYSTEM. |
| 401 | Supplying all materials, labour, T & P and constructing of Inspection chamber of the following inside size with 8 cm thick R.C.C. precast cover slab in CC (1:2:4) mix using 12mm size h.g. chips, foundation concrete (1:4:8) using 40mm size h.g. metal on bed aound trap , Fly Ash brickwork in CM (1:6) in P&F and inside 12mm thick cement plastering (1:3) finished with a floating coat of neat cement including fixing 100mm x100mm size gully trap, 150mm x150mm C.I gratig etc. all complete as per aproved drawing, specification and direction of Engineer-in-charge. |
| 402 | Manhole 900mm x800mm x450mm |
| 403 | Supplying, fixing and testing PVC soil, waste, Rainand vent pipes (SWR) SUPREME confirming to IS13592 : 1990, type B with rubber ring/Solvent(confirming toIS5382) joint inclusive of allnecessary specials like bends, tees,offsets, door bends, junctions, cowls, etc.,laid underfloor/ fixed on walls,and in pipe shafts etc., complete.The rate shall include necessary GI supports, GI grip bolts, angle brackets, hangers, supports as with suitable GI U-clamps, bolts, nuts and washers etc., The clamps shall be painted with two coats of enamel (approved) paint over a coat of primer etc., complete. Make:- Supreme/Ashirbad/Astral/Sentini |
| 404 | 40 mm dia .(SENTINI FLOW PIPE BS0075SP3M) |
| 405 | 75 mm dia . ( SENTINI FLOW PIPE BS0007SP3M) |
| 406 | 110 mm dia . ( SENTINI FLOW PIPE BS0009SP3M) |
| 407 | 110 mm dia Rain pipe. ( SENTINI FLOW PIPE BS0009SP3M) |
| 408 | 160 mm |
| 409 | Supplying, fixing and testing PVC multi floortrap with SS frame and cover 75mm dia outlet fixed on a bed of cement concrete with (Heavy duty type) etc., complete. |
| 410 | 110 mm dia (SENTININM5609SFPL) |
| 411 | Supplying, fixing and testing PVC Nahani trap with SS frame and cover 75mm dia outlet fixed on a bed of cement concrete with (Heavy duty type) etc., complete. |
| 412 | 75 mm dia (SENTINI NF4334SFPL) |
| 413 | Providing ,fixing , testing and commissioningof approved make PVC vent cowl with necessary accessories etc., complete. Make-Supreme , Page-48 |
| 414 | 75 mm dia(SENTININF5007SFPL) |
| 415 | 110 mm dia ( SENTINI NF5009SFPL) |
| 416 | Providing and fixing Clean Out |
| 417 | 75 mm dia (SENTINISF1007SFPL) |
| 418 | 110 mm dia (SENTINISF1009SFPL) |
| 419 | Supplying all materials, labour, T & P and constructing Gully trap chamber of the following inside size with 8 cm thick R.C.C. precast cover slab in CC (1:2:4) mix using 12mm size h.g. chips, foundation concrete (1:4:8) using 40mm size h.g. metal on bed aound trap , Fly Ash brickwork in CM (1:6) in P&F and inside 12mm thick cement plastering (1:3) finished with a floating coat of neat cement including fixing 100mm x100mm size gully trap, 150mm x150mm C.I gratig etc. all complete as per aproved drawing, specification and direction of Engineer-in-charge. |
| 420 | 300mmx300mm with RCC cover |
| 421 | Fixing of 25mm dia Brass/GM Fulway Valve confirming toIS : 781-1995 of approved makeas per specification complete as per direction of Er-in-charge. 32mm dia brass or gun metal full way valve.(Make- Shakti or equivalent.) |
| 422 | Innovation and sports complex |
| 423 | Fixing of 40mm dia Brass/GM Fulway Valve confirming toIS : 781-1995 of approved makeas per specification complete as per direction of Er-in-charge. 40mm dia brass or gun metal full way valve.(Make- Shakti or equivalent.) |
| 424 | Supplying all materials, labour, T&P and fixing standard sizedmaxon company round u shaped 8 pin cloth hanger |
| 425 | Supplying all materials, labour, T&P and fixing standard sized600 mm long towel rail |
| 426 | INTERNAL & EXTERNAL ELECTRIFICATION WORK |
| 427 | Internal Wirring |
| 428 | Recessed wiring to light point / first light of group control/ call bell point/ exhaust fan point /wall fan point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked in 20 mm dia non-metalic PVCconduit with 6 Amp, 250 V clip in type switch ISI marked and ceiling rose ISI marked mounted on G.I modular box with face plate & cover of suitable size ,with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire Finolex/ L&T / Anchor / Havels / V Guard ) Group C |
| 429 | Kitchen |
| 430 | Girls hostel |
| 431 | Boys hostel |
| 432 | ADD.Class room/warden f.f boys and girls |
| 433 | Dining block |
| 434 | Recessed wiring to secondary light pointlooped from primary light point with 1.5sqmm FR PVC insulated single core multistrand copper conductor of ISI marked with 20mm dia non-metallic PVCconduitwith 1.5sqmm FR PVC insulated single core multistrand copper conductor for running earth including3 plate ISI marked Ceiling rose with all accessories & connection as per direction of Engineer in charge. (Make of wire: finolex/ Anchor/Havels/L&T/KDK) Average Length: 3mtr |
| 435 | ADD.Class room |
| 436 | Dining block |
| 437 | Recessed wiring to ceiling fan point with 1.5sqmm FR PVC insulated single core multistrand copper conductor of ISI marked with 20mm dia non-metallic PVCconduit with 6Amp 250V Modular Switch,Stepped type Moudular Regulator, Base & Cover with 1.5sqmm FR PVC insulated single core multistrand copper conductor for running earth including all accessories & connection as per direction of Engineer in charge. (Make of wire: finolex/ Anchor/Havels/L&T/KDK) Group B |
| 438 | ADD.Class room |
| 439 | Dining block |
| 440 | Recessed wiringfor 5 / 6 amp socket outletwith 6Amp, 250 V clip in type switch ISI markedmounted on G.I moular box with face plate & cover of suitable size ,with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection on same switch board as per direction of Engineer in Charge. |
| 441 | Kitchen |
| 442 | ADD.Class room |
| 443 | Dining block |
| 444 | Recessed wiringfor2 x 6 amp socket outlet controlled by 2 nos6Amp, 250 V clip in type switch ISI markedmounted on single G.I moular box with face plate & cover of suitable sizeincluding all accesories and connection on separate board as per direction of Engineer in Charge. |
| 445 | ADD.Class room |
| 446 | Dining block |
| 447 | Recessed wiringfor 6 pin 16 amp socket outletwith 5Amp, 250 V clip in type switch ISI markedmounted on G.I moular box with face plate & cover of suitable size ,with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. |
| 448 | Kitchen |
| 449 | ADD.Class room |
| 450 | Dining block |
| 451 | SUBMAIN |
| 452 | Recessed wiring to submain in 2 x 6 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 25 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 1 x 4.0 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired. |
| 453 | ADD.Class room |
| 454 | Recessed wiring to submain in 2 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired. |
| 455 | Kitchen |
| 456 | Girls hostel |
| 457 | Boys hostel |
| 458 | ADD.Class room |
| 459 | Dining block |
| 460 | Recessed wiring to submain in 2 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired. |
| 461 | Kitchen |
| 462 | Girls hostel |
| 463 | Boys hostel |
| 464 | ADD.Class room |
| 465 | Dining block |
| 466 | DISTRIBUTION BOARD . |
| 467 | Supply and fixing of single pole MCB with sheet steel enclosure, distribution board, on surface /recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable glandplate, interconnection, phosphate and powder painted including earthing etc. as required ( But without MCB/ RCCB/ ISOLATOR) |
| 468 | 16 way SPN , MCB DB double door |
| 469 | Sports cum Innovation Block |
| 470 | 4 way SPN , MCB DB double door |
| 471 | Kitchen |
| 472 | Supply and fixing of following rating 240 V Minature Circuit Breaker (MCB) having a sensitivity current up to 10kA in the existing MCB DB ISI marked complete with connection testing and commissioning etc as required. |
| 473 | Kitchen |
| 474 | ADD.Class room |
| 475 | Dining block |
| 476 | Supply and fixing of following rating 240 V Residual Current Breaker with Overcurrent protection (RCBO) having a sensitivity current up to 100mA in the existing MCB DB ISI marked complete with connection testing and commissioning etc as required. |
| 477 | 25 to 40 amp rating DP RCBO, 30mA |
| 478 | Kitchen |
| 479 | ADD.Class room |
| 480 | Dining block |
| 481 | FIXTURE |
| 482 | Supply, Installation, Testing and Commissioning of pre-wired fluorescent fiiting / compact fluorescent fitting /LED fitting of all sizes complete with all accessories and lamp etc. directly on ceiling /wall or recessed in false ceiling , including connection with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor and earthing as required. |
| 483 | Surface mounted indoor type 12W ROUND LED Luminaire with LED Lamp Similar to WIPRO Cat No. LD80-101-XXX-60-SM or equivalent. |
| 484 | Girls hostel |
| 485 | Boys hostel |
| 486 | ADD.Class room |
| 487 | Dining block |
| 488 | Surface mounted indoor typeSINGLE LED TUBELuminaire with LED Lamp Similar to WIPRO Cat No. WIO921208 or equivalent. |
| 489 | Kitchen |
| 490 | Girls hostel |
| 491 | Boys hostel |
| 492 | ADD.Class room |
| 493 | Dining block |
| 494 | Surface mounted indoortype BULK HEADLED Luminaire with LED Lamp Similar to WIPRO Cat No. LW07-141-XXX-57-XX or equivalent. |
| 495 | ADD.Class room |
| 496 | Supplying and fixing of Energy efficient Street light LED luminaire with high pressure die cast aluminium housing with pure polyester powder coated dark grey Housing with high purity PMMA lense,Toughened glass with silicon gaskets for IP66 protection, wattagein range 30 watt Similar to WIPRO Cat No. LR02-331-XXX-57-XX or equivalent |
| 497 | Kitchen |
| 498 | Girls hostel |
| 499 | Boys hostel |
| 500 | ADD.Class room |
| 501 | Dining block |
| 502 | Supplying and fixing of 32 mm dia X 2.00 metres long G.I. pipe (medium class) bracket for mounting of fluorescent / HPMV / HPSV street light fitting on pole including bending the pipe to the required shape, 2 nos 40 mm X 3 mm flat iron clamps with nuts, bolts and washer, painting the flat iron with primer and finish paint etc. as required. |
| 503 | Kitchen |
| 504 | Girls hostel |
| 505 | Boys hostel |
| 506 | ADD.Class room |
| 507 | Dining block |
| 508 | Supply, Installation, Testing and Commissioning of ceiling fan 1200mm sweep, including wiring the down rods of standard length (upto 30 cm) with 1.5 sq.mm FR PVC insulated single core multiatrand copper conductor etc. as required. |
| 509 | Girls hostel |
| 510 | Boys hostel |
| 511 | ADD.Class room |
| 512 | Dining block |
| 513 | Supply, Installation, testing and commissioning of exhaust fan of 300 mm sweep 900 rpm in the existing opening, including making the hole to suit the size of the above fan, making good the damage complete, connection, etcas required. |
| 514 | Kitchen |
| 515 | Girls hostel |
| 516 | Boys hostel |
| 517 | ADD.Class room |
| 518 | EARTHING |
| 519 | Earthing with GI earth plate 600 mm x 600mm x 6 mm thick ISI marked including accessories and providing masonary with cover plate having loccking arrangement and watering pipe etc with charcoal and salt as required. |
| 520 | Supplying and laying 25 mm x 6 mm G.I earth strip ISI marked at 0.5 meter below ground level as strip earth electrode including soldering etc. as required. |
| 521 | Supplying and laying 25 mm x 5 mm G.I earth strip ISI marked on surface or in recess for connection etc as required. |
| 522 | Providing and fixing 6 SWG GI wire on surface or in recess for loop earthing as required. |