}

Labour Charges For Carrying Out Extension / Improvement / Oh Fault Rectification & Other Maintenance Works In Gummidipoondi Sub-Division Of Ponneri Division In Chennai North Circle- 1 Labour Charges For Erection Of Double Pole Structure With Dist, gummidipoondi-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited has published Labour Charges For Carrying Out Extension / Improvement / Oh Fault Rectification & Other Maintenance Works In Gummidipoondi Sub-Division Of Ponneri Division In Chennai North Circle- 1 Labour Charges For Erection Of Double Pole Structure With Dist. Submission Date for this Tender is 01-09-2022. Washers Tenders in gummidipoondi Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

33592887
Labour Charges For Carrying Out Extension / Improvement / Oh Fault Rectification & Other Maintenance Works In Gummidipoondi Sub-Division Of Ponneri Division In Chennai North Circle- 1 Labour Charges For Erection Of Double Pole Structure With Dist
Open Tender
NCB
Tamil Nadu
Gummidipoondi
01-09-2022

Tender Details

Labour Charges For Carrying Out Extension / Improvement / Oh Fault Rectification & Other Maintenance Works In Gummidipoondi Sub-Division Of Ponneri Division In Chennai North Circle- 1 Labour Charges For Erection Of Double Pole Structure With Distribution Transformer. 2 Excavation Of Structure Pole Pit 2 X 3 X 1 / 6 Th Of Height Of Pole 3 Erection Of 9.14 M Rcc / 9.0 Mtr Psc / Rsj Pole 4 Transporting Of 9.14 M Poles From Road Side To Pole Pit 5 Structure Pole Mass Concreting And Coping 0.6X0.6X1.65 Mtr For Dp Structure Including Cost Of Materials And Cement. 6 Erection Of Structure Materials Complete Such As Top Channel, Seating Channel, Belting Angle, Cross Bracing.Dpdc Channel, T.I. Fitting Etc., In Complete. 7 Excavation Of Stay Pit 0.95X0.60X1.5M 8 Erection Of Stay Set Complete 9 Sleeve Concrete For Stay Set Including All Materials & Cement 10 Erection Of Hg Fuse Set With Transport 11 Erection Of 11 Kv Ab Switch Complete Set With Transport 12 Transformer Structure Grounding And Earthing Of Structure Complete Including Excavtion Of Earth Pit And Erection Of Earth Pipe With Salt, Coal And Earth Refiling Etc., Completewith Trough / W.O. Trough 13 Erection Of Aluminium Bus Bar Pipe Complete For H.T.Bus Bar Arrangements For Dp Structure 14 Erection Of Aluminium Bus Bar Pipe Complete For H.T.Bus Bar Arrangements For Tp Structure 15 Erection Of Aluminium Bus Bar Pipe Complete For H.T.Bus Bar Arrangements For Four Pole Structure 16 Erection Of L.T.Open Type Fuse Unit Including Cable Jumpering Upto The Line. 17 Providing Lt Bus Bar Arrangementsin Dt Structure Including Fixing Of Cross Arm And Insulator. 18 Erection Of H.T. Jumpering In Dp Structure Complete ( 150 * 3 ) 19 Erection Of H.T. Las ( 3 Nos ) 20 Erection Of L.T. Las ( 4 Nos ) 21 Erection Of Dt Excluing Loading And Unloading Using Crane - 63Kva / 100Kva 22 Erection Of Dt Excluing Loading And Unloading Using Crane -Above 100 Kva 23 Painting Of Two Coats Of Aluminium Paint For Dp Structure And Iron Materials Including Cost Of Paint And Distemper Etc. Without Material 24 Painting Of Two Coats Of Aluminium Paint For Dp Structure And Iron Materials Including Cost Of Paint And Distemper Etc. - With Material 25 Painting Of Structure Pole With Distemper Including Cost Of Material 26 Loading And Unloading Of Distribution Transformer At Site And Store. ( All Rating ) 27 Dismantling Of Failed Dt From The Structure Including Removing Ht & Lt Connection And All Other Incidental Works. ( Excluding Loading And Unloading ) - Upto 100 Kva 28 Dismantling Of Failed Dt From The Structure Including Removing Ht & Lt Connection And All Other Incidental Works. ( Excluding Loading And Unloading ) - Above 100 Kva 29 Labour Charges For Laying Of Ht Cable 30 Excavation Of Cable Trench 0.6 Meters Width And 1.2 Meters Depth Including Cost Of Providing Sign Boards, Danger Lights, Indication Arrangements Lead, Lift, Labour And Tools And Plants Etc., - Normal Road 31 Excavation Of Cable Trench 0.6 Meters Width And 1.2 Meters Depth Including Cost Of Providing Sign Boards, Danger Lights, Indication Arrangements Lead, Lift, Labour And Tools And Plants Etc., - Tar Road 32 Excavation Of Cable Trench 0.6 Meters Width And 1.2 Meters Depth Including Cost Of Providing Sign Boards, Danger Lights, Indication Arrangements Lead, Lift, Labour And Tools And Plants Etc., -Concrete Road 33 Loading And Unloading Of Ht Cable Including Coiling And Recoiling 34 Transporting Of 11 Kv Ht Cable From Departmental Stores To Work Spot By Engaging Private Vehicle Upto 5 Km 35 Transporting Of 11 Kv Ht Cable From Departmental Stores To Work Spot By Engaging Private Vehicle Above 5 Km 36 Laying Of 11Kv 3 X 300 Sq Mm Xlpe Cable 37 Laying Of 11Kv 3 X 120 Sq Mm Xlpe Cable 38 Covering Ht Cable By Cement V Trough After Covering The Cable With Good Loose Earth Including Loading, Unloading And Transport From Stores To Site And Letter Painting Of Feeding Details & Cable Size Onthe Trough 39 Refilling With Excavated Earth Layers Well Consolidated As Per Std Specification Including All Materials, Lead, Lift Etc., Complete. 40 Transport Back Any Balance Cable, Empty Drums And Other Materials If Any By Engaging Private Vehicle Including Recoiling, Coiling And Loading And Unloading At Both Sides From Workspot To Departmental Stores ( Minimum 2 Drums ) Upto 5 Km 41 Transport Back Any Balance Cable, Empty Drums And Other Materials If Any By Engaging Private Vehicle Including Recoiling, Coiling And Loading And Unloading At Both Sides From Workspot To Departmental Stores ( Minimum 2 Drums ) Above 5 Km 42 Labour Charges For Laying Of Lt Cable 43 Loading And Unloading Of Lt Cable Including Coiling And Recoiling 44 Transporting Of 11 Kv Lt Cable From Departmental Stores To Work Spot By Engaging Private Vehicle Upto 5 Km 45 Transporting Of 11 Kv Lt Cable From Departmental Stores To Work Spot By Engaging Private Vehicle Above 5 Km 46 Excavation Of Cable Trench Size 0.45M X0.75 M Including Cost Of Providing Sign Boards, Danger Lights, Indication Arrangements, Lead, Lift, Labour And T&P Etc. - Normal Road 47 Excavation Of Cable Trench Size 0.45M X0.75 M Including Cost Of Providing Sign Boards, Danger Lights, Indication Arrangements, Lead, Lift, Labour And T&P Etc. -Tar Road 48 Excavation Of Cable Trench Size 0.45M X0.75 M Including Cost Of Providing Sign Boards, Danger Lights, Indication Arrangements, Lead, Lift, Labour And T&P Etc. -Concrete Road 49 Laying Of Lt 4 X 240 Sq.Mm Cable 50 Laying Of Lt 4 X 120 Sq.Mm Cable 51 Laying Of Lt 4 X 25 Sq.Mm Cable 52 Laying Of Lt 2 X 16 Sq.Mm Cable 53 Refilling With Excavated Earth Layers As Per Std Specification Including All Materials, Lead, Lift Etc., Complete. 54 Labour Charges For Erection Of Pillar Box 55 Erection Of 4 / 6 Way Pillar Box - 3 Feet Height Using Concrete Only - Including Excavation Of Foundation Pits As Per Standard Specification 2 Nos Pillar Concrete Walls, Coping And Earthing Including Cost Of All Materials, El. Works, Transportation, Lead, Lift Etc., 56 Erection Of Mini Pillar Box - 3 Feet Height Using Concrete Only - Including Excavation Of Foundation Pits As Per Standard Specification 2 Nos Pillar Concrete Walls, Coping And Earthing Including Cost Of All Materials, El. Works, Transportation, Lead, Lift Etc., 57 Cleaning&Painting With Aluminium Paint 2 Coats & Numbering With Fdr Details With Materials - 8 Way Pillar Box 58 Cleaning&Painting With Aluminium Paint 2 Coats & Numbering With Fdr Details Without Materials - 8 Way Pillar Box 59 Cleaning&Painting With Aluminium Paint 2 Coats & Numbering With Fdr Details With Materials - 6 Way Pillar Box 60 Cleaning&Painting With Aluminium Paint 2 Coats & Numbering With Fdr Details Without Materials - 6 Way Pillar Box 61 Cleaning&Painting With Aluminium Paint 2 Coats & Numbering With Fdr Details With Materials - 4 Way Pillar Box 62 Cleaning&Painting With Aluminium Paint 2 Coats & Numbering With Fdr Details Without Materials - 4 Way Pillar Box 63 Cleaning&Painting With Aluminium Paint 2 Coats & Numbering With Fdr Details With Materials - Mini Pillar Box 64 Cleaning&Painting With Aluminium Paint 2 Coats & Numbering With Fdr Details Without Materials - Mini Pillar Box 65 Labour Charges For Dismantling Of Pillar Box 66 Dismantling Of Old 4 / 6 / 8 Way Pillar Box Including Associated Accessories, Loading On The Vehicle, Transporting, Unloading At Stores And Stacking. 67 Dismantling Of Old Mini Pillar Box Including Associated Accessories, Loading On The Vehicle, Transporting, Unloading At Stores And Stacking. 68 Labour Charges For Miscellaneous Work 69 Excavation Of Pole Pit ( Pit Size 2X3X1 / 6Th Of The Length Of Poles ) For 7.5Mtrs / 8 Mtrs Pole 70 Erection Of 7.5M / 8M Rcc / Rsj / Psc Pole And Other Poles 71 Excavation Of Pole Pit ( Pit Size 2X3X1 / 6Th Of The Length Of Poles ) For 9.14M Pole 72 Erection Of 9.14M Rcc / Rsj / Psc Pole And Other Poles 73 Trasportation Of Pole Of All Sizes From Road Side To Work Spot 74 Trasportation Of Pole Of All Sizes From Stores To Road Side Upto 2Km 75 Trasportation Of Pole Of All Sizes From Stores To Road Side Upto Above 2 Km 76 Base Concerting 30 Cm Thick For One Pole Including Of All Materials 77 Transporting Of Dts / Metering Sets / Line Materials Through Private Vehicle From Store To Work Spot / Vice Versa Upto 10 Km 78 Transporting Of Dts / Metering Sets / Line Materials Through Private Vehicle From Store To Work Spot / Vice Versa Above 10 Km 79 Erection Of V Cross Arm 3 1 / 2Size 80 Erection Of V Cross Arm41 / 2 Size 81 Erection Of Tapping Channel 5 Size / V Cross Arm 5 Size 82 Excavation Of Stay Pit 83 Erection Of Stay Set Complete 84 Fixing Of 11 Kv Ti Fitting 85 Fixing Of 33 Kv Ti Fitting 86 Fixing Of Lt 3 Phase Cross Arm 87 Fixing Of Lt Ti Fitting 88 Fixing Of Single Phase Cross Arm 89 Lt Pin Insulator With Pin 90 Lt Shackle With Strap Sets 91 11 Kv Pin Insulator With Gi Pin 92 33 Kv Pin Insulator With Gi Pin 93 11 Kv Strain Disc With Metal Parts 94 33 Kv Strain Disc With Metal Parts 95 Fixing Of Aluminium Knob 96 Fixing Of Caution / Danger Board 97 Providing Of Fly Stay ( Excluding Pole Erection And Earth Excavation ) 98 Concreting Of Poles With 1:3:6 Mix, 1.1 / 2 Broken Metal Jelly And M Sand Including Coping ( M Sand, Jelly And Cement, Will Be Supplied By The Contractor ) ( Size 2X3x1 / 6Th Of Pole Height ) - 7.5M / 8M Pole 99 Concreting Of Poles With 1:3:6 Mix, 1.1 / 2 Broken Metal Jelly And M Sand Including Coping ( M Sand, Jelly And Cement, Will Be Supplied By The Contractor ) ( Size 2X3x1 / 6Th Of Pole Height ) - 9.14 Metres Pole ( With Coping Of 1 Dia Upto Height Of 1.1 / 2 Above Ground Level ) Pole 100 Earthing Of Poles 101 Paving Out Conductor, Stringing And Sagging Of Line Of 7 / 2.59Mm Acsr / 7 / 2.50 Mm Aaac Conductors Of Lt Lines Including Pin Binding Of Supports And Terminating At Shackle Points Using Aluminium Roller, Including Jumpering. 102 Paving Out Conductor, Stringing And Sagging Of Line Of 7 / 3.35Mm Acsr / 7 / 3.15 Mm Aaac Conductors Of Lt Lines Including Pin Binding Of Supports And Terminating At Shackle Points Using Aluminium Roller, Including Jumpering. 103 Paving Out Conductor, Stringing And Sagging Of Line Of 7 / 4.09Mm Acsr Racoon Conductors Of Ht Lines Including Pin Binding Of Supports And Terminating At Shackle Points Using Aluminium Roller, Including Jumpering. 104 Paving Out Conductor, Stringing And Sagging Of Line Of 7 / 4.72Mm Dog Conductors Of Ht Lines Including Pin Binding Of Supports And Terminating At Shackle Points Using Aluminium Roller, Including Jumpering. 105 Numbering Of Location / Each Including Cost Of Paint And Labour 106 Providing Of 2 Wire Flat Guarding ( Split Neutral Grounding ) Per Span Excluding Of Stay Set Erection 107 Providing Of 4 Wire Flat Guarding Per Span Excluding Of Stay Set Erection 108 Providing Of Craddle Guarding Including Earthing And Earth Pit Excavation Per Span Excluding Of Stay Set Erection 109 Erection Of Street Light Fittings 2 Feet / 4 Feet ( All Materials Supplied By The Board ) Labour Alone. 110 Erection Of Cross Bracing Set 10 / 15 Structure - Dp Structure 111 Erection Of Cross Bracing Set 10 / 15 Structure - Tp Structure 112 Erection Oftop Channels 10 / 15 Structure - Dp Structure 113 Erection Oftop Channels 10 / 15 Structure - Tp Structure 114 Erection Of33 Kv Centre Rotating Ab Switch Complete Set 115 Erection Of11 Kv Centre Rotating Ab Switch Complete Set 116 Erection Of Single Phase Spacer 117 Erection Of Three Phase Spacer 118 Provision Of Jumper Per Phase For Lt 119 Provision Of Jumper Per Phase For Ht 120 Provision Of Pa Jumpers 121 Loading Of Metering Set 122 Un Loading Of Metering Set 123 Erection Of Metering Sets - Up To 11Kv Metering Set 124 Erection Of Metering Sets - Above 11Kv Metering Set 125 Loading Of 7.5 / 8 Metres Pole ( Rcc / Psc ) / Each 126 Loading Of9.14 Metres Pole Rcc / 9.0 Mtr Psc / 9.14 Rsj / Each 127 Unloading Of 7.5 / 8 Metres Pole ( Rcc / Psc ) / Each 128 Unloading Of 9.14 Metres Pole Rcc / 9.0 Mtr Psc / 9.14 Rsj / Each 129 Loading Of Conductor Drum Of All Sizes With Conductor 130 Loading Of Conductor Drum Of All Sizes Without Conductor 131 Unloading Of Conductor Drum Of All Sizes With Conductor 132 Unloading Of Conductor Drum Of All Sizes Without Conductor 133 Manufacturing Of Ms Clamps At Works Spot As Per Requirement , Including Alteration By Using 50 X 8 Mm Flat ( With Material ) 134 Manufacturing Of Ms Clamps At Works Spot As Per Requirement , Including Alteration By Using 65 X 10 Mm Flat ( With Material ) 135 Cutting Of Channel / Flat / Angle 136 Cutting Of Rsj Pole 137 Cutting Of Tubular Pole 138 Cutting Of Rail Pole 139 Drilling Of 5 / 8, 3 / 8, 1 / Holes In Channels / Angles - Slot Holes 140 Drilling Of 5 / 8, 3 / 8, 1 / Holes In Channels / Angles - Round Holes 141 Fixing Of Missing Doors In Ms Mini Pillar Box 142 Fixing Of Missing Doors In Ms 4 Waypillar Box 143 Fixing Of Missing Doors In Ms 6 Waypillar Box 144 Fixing Of Missing Doors In Ms 8 Waypillar Box 145 Fixing Of Missing Doors In Frppillar Box 146 Provision Of 2 Nos Hinges In All Types Of Pillar Box 147 Labour Charges For Maintenance Work 148 Dp / Tp Structure Maintenance - Pole Mounted 149 Dt Maintenance For Various Capacity 150 Structure Earthing Wire Redoing - Various Capacity 151 Replacement Of Structure Earthing In Complete Without Material - Various Capacity 152 Dt Structure Yard Cleaning - Various Capacity 153 Watering To Earth Pits 154 Numbering Of Location Including Cost Of Paint And Labour 155 Maintenance Of 8 Way Pillar Box -Such As Replacement Of Damaged Insulators Worn Out Stembolts, Lugs, Termination Of Cables And Dressing. 156 Maintenance Of 6 Way Pillar Box -Such As Replacement Of Damaged Insulators Worn Out Stembolts, Lugs, Termination Of Cables And Dressing. 157 Maintenance Of 4 Way Pillar Box -Such As Replacement Of Damaged Insulators Worn Out Stembolts, Lugs, Termination Of Cables And Dressing. 158 Maintenance Of Mini Pillar Box -Such As Replacement Of Damaged Insulators Worn Out Stembolts, Lugs, Termination Of Cables And Dressing. 159 Numbering Of Pillar With Feeder Details Including Cost Of Paint And Labour 160 Maintenance Of 11 Kv Abs Only At Structure. ( Checking Of Alignment And Replacement Of Wornout Fixed And Moving Contacts Pt Insulator, Changing Earthing And Lubricating ) . 161 Maintenance Of 11 Kv Abs Only At Ss. ( Checking Of Alignment And Replacement Of Wornout Fixed And Moving Contacts Pt Insulator, Changing Earthing And Lubricating ) . 162 Maintenance Of 33 Kv Abs At Structure ( Checking Of Alignment And Replacement Of Wornout Fixed And Moving Contacts Pt Insulator, Changing Earthing And Lubricating ) . 163 Maintenance Of 33 Kv Abs At Ss ( Checking Of Alignment And Replacement Of Wornout Fixed And Moving Contacts Pt Insulator, Changing Earthing And Lubricating ) . 164 Cutting Of Big Tree Fouling On The Line. 165 Cutting Of Tree Branches Fouling On The Line. 166 Clearing Of Heavy Bushes 167 Jungle / Bushes / Velikathan Clearence 168 Set Righting Leanedht / Lt Poles At Pin Point Location 169 Set Righting Leanedht / Lt Poles At Cut Point Location 170 Re-Sagging Of Ht Line -7 / 4.72 Mm 171 Re-Sagging ( Ht / Lt ) Line 7 / 4.09 Mm 172 Re-Sagging ( Ht / Lt ) Line7 / 3.35 Mm 173 Re-Sagging ( Ht / Lt ) Line 7 / 2.59 Mm 174 Dc Of Single Phase Service 175 Dc Of Three Phase Service 176 Rc Of Single Phase Service 177 Rc Of Three Phase Service 178 Labour Charges For Dismantling Work 179 Dismantling Of 7.5M / 8.0M Poles 180 Dismantling Of 9.14 Mtr. Poles / Rsj / Tubular Poles 181 Dismantling Of Stay Set Complete 182 Dismantling Of Conductors Including Coiling And Transporting From Workspot To Road Side Upto 7 / 3.35Mm Conductor Without Transport 183 Dismantling Of Conductors Including Coiling And Transporting From Workspot To Road Side Above 7 / 3.35Mm Conductor Without Transport 184 Releasing Of Lt S Ph X Arm / Ti Fitting 185 Releaasing Of Lt 3 Ph X Arm 186 Releasing Of 3 - 6 V Cross Arm / Tapping Channal / GuardingX Arm 187 Releasing Of 4 - 6 AndV Cross Arm 188 Releasing Of5V Cross Arm 189 Releasing Of Distn.Tr. Only At Field 190 Dismantling Of Transformer Structure Materials - Up To 100 Kva 191 Dismantling Of Transformer Structure Materials - Above 100 Kva 192 Dismantling Of 11Kv Ab Switch At Structure 193 Dismantling Of 33Kv Ab Switch At Structure 194 Dismantling Of H.G. Fuse Set 195 Dismantling Of Ht Las At Dt Structure 196 Dismantling Of Lt Las At Dt Structure 197 Dismantling Of Earth Pipe And Structure Earthing Complete 198 Dismantling Of 2 Sets Open Type Fuse Unit With All Wiring Complete ( Including Bus Bar Arrangement ) 199 Dismantling Of Cross Bracing Set 200 Dismantling Of Top Channel 201 Dismantling Of Guarding Including Dismantling Of Cross Arm Per Span 202 Dismantling Of Single Ph Service Wire & Re-Effecting Service Including Meter 203 Dismantling Of Three Ph Service Wire & Re-Effecting Service Including Meter 204 Breaking Of Rcc Damaged Poles After Dismantling, Releasing The Grill Including Transporting To Road Side 205 Stacking Materials / Scrap 206 Labour Charges For Erection Of Single Pole Structure 207 Loading And Unloading Of 9.0M Square Pole 208 Excavation Of Pole Pit 209 Erection Of 9.0M Square Pole 210 Transporting Of Square Pole From Road Side To Pole Pit 211 Excavation Of Stay Pit 0.95X0.60X1.5M 212 Erection Of Stay Set Complete 213 Fixing Of Single Pole Structure Material In Complete Shape 214 Erection Of 16 / 25 / 40 Kva Distribution Transformer 215 Transformer Structure Grounding And Earthing Of Structure Complete Including Excavtion Of Earth Pit And Erection Of Earth Pipe With Salt, Coal And Earth Refiling Etc., Completewith Trough / W.O. Trough 216 Structure Pole Mass Concreting And Coping 0.6X0.6X1.65 Mtr For Dp Structure Including Cost Of Materials And Cement. 217 Sleeve Concrete For Stay Set Including All Materials 218 Erection Of Ht Las ( 3 Nos ) 219 Erection Of Lt Las ( 4 Nos ) 220 Erection Of Lt Wiring Kit ( Double Open Type Circuit ) 221 Painting Of Single Pole Structure Including Iron Materials Double Coat With Materials 222 Painting Of Single Pole Structure Including Iron Materials Double Coatwithout Materials 223 Painting Of Structure Pole With Distemper Including Cost Of Material 224 Gst

Key Value

Document Fees
Refer document
EMD
INR 20000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail