Supply, Installation, Testing And Commissioning Of 100 Kva Distribution Transformer And Various Line Materials At Hutment Area Second Shaliganga And Stabilization Of / Imptt. Of 11 Kv Feeder At Doodh Pathri Under The Jurisdiction Of Ed Budgam Kpdcl.--- 1 Work Items Identified; 2 Supply, Installation, Testing And Commisioning Of11 / 0.433Kv, 3-Phase ( Ee Level-Ii ) Distribution Transformers 100 Kva With Bimetallic Terminal Complete In All Respect As Per Rec Standard ( As Mentioned In Sbd ) 3 Supply, Installation, Testing And Commisioning Of 9 Mtr ( 410 Sp-33 ) Long Steel Tubular Poles Complete With Base Plate ( 300X300x5mm ) , Top Cap, Including Digging Of Pit ( 1 / 6Th Of Pole Height ) Positioning Etc, Complete In All Respect As Per Rec Standard ( As Mentioned In Sbd ) 4 Supply, Laying, Stringing, Tensioning, Binding Of 30 Sqmm Acsr Conductor Complete In All Respects As Per Rec Standards ( As Mentioned In Sbd ) 5 Supply, Carraige Upto Site And Fixing Of Gi V Cross Arm & Gi F Top With Clamps Duly Fabricated As Per Site Requirement Including Clamps ( 50X6 Mm ) , Gi Nuts & Bolts, Washers Etc Complete In All Respects As Per Rec Standards. 6 Supply, Carraige Upto Site, Fixing And Installation Of Gi Channels Of Different Sizes Including Clamps And Braces. 7 Supply, Carraige Upto Site, Installation, Testing And Commissioning Of 11 Kv Porecelain Composite Disc Insulators 12 Kv.5Kn, Lighting Impulse 75 Kv Positive And 80 Kv Negative, Creepage Distance 320Mm Complete In All Respects As Per Rec Standards 8 Supply, Carraige Upto Site, Installation, Testing And Commissioning Of 11 Kv Porecelain Composite Pin Insulators 12 Kv.5Kn, Lighting Impulse 75 Kv Positive And 80 Kv Negative, Creepage Distance 320Mm Complete In All Respects As Per Rec Standards 9 Supply, Carraige Upto Site, Installation, Testing And Commissioning Of Gapless Surge Arrestor 9 Kv, 10 Ka, La With Polymer Housing, Stn. Type Complete In All Respects As Per Rec Standards. 10 Supply, Carraige Upto Site, Installation, Testing And Commissioning Of 11 Kv G.O Ab Switch 3-Phase, 3Pole 200-Amp, Vertical Type With Fittings Complete In All Respects As Per Rec Standards. 11 Supply, Carraige Upto Site, Installation, Testing And Commissioning Of 11 Kv Horn Gap Fuse Set 3 Phase 200Acomplete In All Respects As Per Rec Standards. 12 Supply, Carraige Upto Site, Laying, Stringing, Tensioning, Binding Of 1.1 Kv Grade, 1-Core 185 Sqmm Pvc Conductor Frls Type Complete In All Respects As Per Rec Standards 13 Supply, Carraige Upto Site, Fixing Ofaluminium Thimbles Of Size 185 Sqmm. 14 Supply, Carraige Upto Site, Fixing And Commissioning Of Aluminium Solderless Clampsof Size 185 Sqmm. 15 Supply, Carraige Upto Site, Installation, Testing And Commissioning Oflt Distribution Box ( 400 Amp ) Complete In All Respects As Per Standards 16 Earthing Of Substation-Excavation Ofearth Pit Of Dia650 Mm & Depth 3000 Mm, Installation Of Earthing Pipe Of 40 Mm Nominal Bore & 4Mm Wall Thickness & Length 2.5 Mtr Long As Per Is 1239. Gi Strip For Neutral Earthing Of Size 75 Mmx10 Mm, 50 Mmx6 Mm For Connection Of Transformer Body & Lightening Arrestor As Per Is 2629 / 85, Gi Nuts & Bolts, Refilled With Earth Enhancement Materials And Earth Chamber Made Of Brick Masonary With Rcc Slab Cover. 17 Supply, Installation , Testing And Commissioning Of Galvanised Stay Set With 50X8mm Stay Clamp, Guy Insulator ( 2Nos. ) , Anchor Plate ( 200X200x6mm ) , Nuts-Bolts, 2Nos Turn-Buckles, 1.8M Long, 16Mm Diameter Solid Gs Stay Rod & 7 / 3.15Mm Dia Gi Stranded Wire Complete 18 Cement Bottoming Of S T Poles In 1:2:4 Mix, Up To 1 / 6Th Plantation Depth Of Polebelow Ground, 9 Above Ground, Circular With Radius 6 Around The Pole Girth / Surface , Top Surface Tappered Outwards0.5 Cum / Pole As Per The Diagram Given In Technical Specifications. 19 Earthing Of Steel Tubular Poles Complete By Gi Pipe 40Mm Or Gi Rod 20Mm 2.5Mtr Long Through Gi Strip. 20 Painting Of Poles With One Coat Of Red Oxide ( 1Ltr / Pole ) And Two Coats Of Alimunium Paint ( 1Ltr / Pole ) . 21 Supply And Fixing Of Anti Climbind Device Complete In All Respects As Per Rec Standards 22 Supply And Fixing Of Danger Plates Complete In All Respects As Per Rec Standards 23 Supply, Laying, Fitting Of 4 Inch Hdd Pvc Pipes Of Standard Quality ( Prince ) From Sub Station To Lt Panel At Hutment Area 2Nd Shaligangafor Laying Of 185 Sqmmlt Cable. 24 Supply, Installation Of 3-Phase11 Kvprodigy Meter 25 Note: 1.The Rates Quoted By The Bidder For All The Items Shall Be Inclusive Of Gst / Freight / Insurance / Storage / Installation / Testing And Any Other Charges For Creation Of 100 Kva New Substations At Hutment Area At Doodh Pathripathri Along With Ht / Lt Networkunder The Jurisdiction Of Ed Budgam, Kpdcl.