Erection Of 11 Kv / Lt Lines And Sub-Stations For Electrification Of Various Places / Villages Under Full Deposit Works Under Edsd, Pili-Kothi, Banda - 1 The Work Of Erection Of 11 Kv Ht / Lt Lines & 16 / 25 / 63 / 100 Kva Sub-Stations On 8.5 / 11 / 13 Mtr. Pcc / Stp Poles With Acsr Weasel / Abc / Xlpe Conductors For Giving Connections To Phc, Hsc, Gram Panchayat, Payjal, Pump House / Intekwells Of Jal Jivan Mishan Under Namami Gange Project And Other At Various Places / Villages Under Full Deposit Scheme Year 2021-22 For Edsd, Pili-Kothi ( Banda ) Under Eudd, Banda, Including Carriage Of Required Material Viz. Poles, T / Fs & Other Line Materials From E.S.C., Banda To Work Site, Alongwith Its Loading, Unloading & Dragging At The Respective Ends And Also Carriage Of Old / Damaged Scraped Material From Site To Store Centre, Details Of The Work As Given Below :- 2 Safe Cartage Of 8.5 Mtr. Long Pcc Poles. 3 Safe Cartage Of 11 Mtr. Long Stp Poles. 4 Safe Cartage Of 13 Mtr. Long Stp Poles. 5 Safe Cartage Of Line Material Viz. Conductor, Cable, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps And Other Line Material. 6 Erection Of Single Support On 8.5 Mtr. Pcc Poles, Including Complete H.T. / L.T. Fittings As Per Direction Of Engineer Incharge / Resspo Manual, As Per Actual Site Requirement & Direction Of Enginner Incharge. 7 Erection Of Single Support On 11 Mtr. Stp Poles, Including Complete H.T. / L.T. Fittings As Per Direction Of Engineer Incharge / Resspo Manual, As Per Actual Site Requirement & Direction Of Enginner Incharge. 8 Erection Of Single Support On 13 Mtr. Stp Poles, Including Complete H.T. / L.T. Fittings As Per Direction Of Engineer Incharge / Resspo Manual, As Per Actual Site Requirement & Direction Of Enginner Incharge. 9 Erection Of Section / Double Pole Structure On 8.5 / 11 / 13 Mtr. Pcc / St Poles, Including Complete H.T. / L.T. Fittings As Per Direction Of Engineer Incharge / Resspo Manual, As Per Actual Site Requirement & Direction Of Enginner Incharge. 10 Laying, Sagging, Stringing, Binding And Jumpering Of New Acsr Weasel Conductor On The Erected Poles As Per Direction Of Supervising Engineer / Resspo Manual. 11 Laying, Stringing, Binding And Sagging Etc. Of Abc Cable On The Newly Erected Poles As Per Direction Of Supervising Engineer / Resspo Manual. 12 Laying, Stringing, Binding And Termination Etc. Of Xlpe Cable On The Newly Erected Line As Per Direction Of Supervising Engineer / Resspo Manual. 13 Filling & Fixing Of I / D & O / D Cable Jointing Kit With Fitting Of All Accessories As Per Resspo Manual, Including Transportation Of ItS. 14 Erection / Installation Of 16 Kva Capacity Transformers On The Newly Erected Single / Double Pole Structure In Proper Alignment And As Per Direction Of Supervising Engineer / Resspo Manual, Along With Carriage, Loading & Unloading. 15 Erection / Installation Of 25 Kva Capacity Transformers On The Newly Erected Single / Double Pole Structure In Proper Alignment And As Per Direction Of Supervising Engineer / Resspo Manual, Along With Carriage, Loading & Unloading. 16 Erection / Installation Of 63 Kva Capacity Transformers On The Newly Erected Single / Double Pole Structure In Proper Alignment And As Per Direction Of Supervising Engineer / Resspo Manual, Along With Carriage, Loading & Unloading. 17 Erection / Installation Of 100 Kva Capacity Transformers On The Newly Erected Single / Double Pole Structure In Proper Alignment And As Per Direction Of Supervising Engineer / Resspo Manual, Along With Carriage, Loading & Unloading. 18 Fixing & Installation Of Ct / Pt Combind Unit With Fitting Of All Accessories As Per Resspo Manual, Including Transportation Of ItS. 19 Fixing & Installation Of 11 Kv Pilfer Proof Metering Cubicle With Fitting Of All Accessories As Per Resspo Manual, Including Transportation Of ItS. 20 Fixing & Installation Of Static Tvm Meter With Fitting Of All Accessories As Per Resspo Manual, Including Transportation Of ItS. 21 Fixing Gaurding Of 11 Kv Line Works With Fitting Of All Accessories As Per Resspo Manual. 22 Erection And Grouting Of Stay Set Including The Work Of Nozelling & Binding Etc. As Per Resspo Manual And Also Including The Cost Of All Grouting Material. 23 Concreting / Grouting Of Supports As Single / Double Poles With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 ( 0.285 Cu. Mtr. Each ) , Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement & Direction Of Enginner Incharge. 24 Fixing & Erection Of 11 Kv Distribution Box On Single Pole As Abc Cable With Fitting Of All Accessories As Per Resspo Manual.