| 1 | SCHEDULED Q-1 (SUPPLY) |
| 2 | TOWER |
| 3 | Supply of 132KV DC tower including stubs, extensions & stub setting templatefor above structure as per Drawing & BOM. |
| 4 | Hot dip galvanized, Hexagon, Round hexagon head transmission towers bolts, nuts & washers for above structure as per Drawing & BOM. |
| 5 | TOWER ACCESSORIES |
| 6 | NUMBER PLATE |
| 7 | DANGER PLATE |
| 8 | PHASE PLATE SET |
| 9 | PIPE TYPE EARTHING MATERIAL FOR TOWERS |
| 10 | INSULATOR |
| 11 | 120KN PORCELAIN INSULATORS FOR TENSION TOWERS |
| 12 | HARDWARE ACCESSORIES SUITABLE FOR ACSR PANTHER |
| 13 | SINGLE SUSPENSION FITTING |
| 14 | CONDUCTOR ACCESSORIES SUITABLE FOR ACSR PANTHER |
| 15 | PA ROD |
| 16 | OPGW |
| 17 | 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE |
| 18 | SUPPLY & INSTALLATION OF HARDWARE SET FOR 24 FIBRE OPGW |
| 19 | JOINT BOX (24 FIBRE) |
| 20 | FODP 48F |
| 21 | FIBRE OPTIC APPROACH CABLE FOR 24 F OPGW |
| 22 | SUPPLY & INSTALLATION OF HARDWARE SET FOR 24 FIBRE (DWSM, G.652D) FIBRE OPTIC APPROACH CABLE |
| 23 | SCHEDULED Q-2 (WORK) |
| 24 | Check Survey of line |
| 25 | Cost of excavation of 132 KV tower foundation pits including all earth work, backfilling, levelling etc. |
| 26 | Setting of stubs including all foundation work but excluding the cost of concreting and excavation (Rate per location) for following towers : |
| 27 | 132 KV DA |
| 28 | 132 KV DB |
| 29 | 132 KV DC/DE |
| 30 | Cost of Concreting for all types of tower foundation including cost of cement, coarse sand, stone grid, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars. |
| 31 | 1:2:4 Concreting |
| 32 | Erection of Superstructure of Towers and Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulator, hardware & accessories but including fitting of danger, number & phase plates, bird guard and fixing & punching for 132 KV SC/DC Lines |
| 33 | Tack welding of all the bolts up to height of one section or 5 Mtr. form ground level whichever is higher |
| 34 | Laying, stringing, tensioning, clamping, jointing etc. of ACSR \"Panther\" conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. Fittings Armour rods, vibration dampers etc. on all three phases of 132 KV SC line. |
| 35 | Laying, stringing, tensioning, clamping, jointing including fittings of all necessary hardware and accessories of OPGW & OFAC, termination at S/s, end to end connectivity & testing etc. on 132 KV line. |
| 36 | Grounding work including earth work etc. for pipe type grounding including cost of coke & salt. |
| 37 | Installation of steel reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc. |